Skip to content
Sign in

Post

Prodigy Gold

You’re reading Portee44’s reply in this thread.Jump to it

Prez3.6 rating from 127 members11.4K ptsRate

Fire River Gold..

http://www.newswire.ca/en/releases/archive/June2011/06/c2935.html

This stuff is right on the surface..

Anyone ,besides me been buying..??

Portee

Amazing..

Fire River Gold Announces 107.13 g/t (3.12 opt) Gold and 36.26 g/t (1.06 opt) Silver Over 8.4 m (27.6 ft) At Nixon Fork Gold Mine, Alaska

FAU: TSX.V
FVGCF: OTCQX
FWR: FSE

VANCOUVER, June 6, 2011 /CNW/ - Fire River Gold Corp (TSXV: FAU) (OTCQX: FVGCF) (FSE: FWR) ("FAU" or the "Company") is pleased to announce results obtained from additional holes drilled during its 2011 drill program at the Nixon Fork Gold Mine, situated in Alaska's Tintina Gold Belt. The Company has received and confirmed assay results from drill holes N11U-038 to N11U-054 at the 3300 Zone. Complete listing of the drill hole intercepts are provided in Table 1. The widths of the intercepts are approximate to the true width of the mineralized intercept.

Table 1. Results from Holes N11U-038 to N11U-054

Location 3300 Zone
HOLE NUMBER FROM
(m)
TO
(m)
Width
(m)
Au
(g/t)
Au
(opt)
Ag
(g/t)
Ag
(opt)
Cu
(%)
N11U-038 NSI
N11U-039 0 4.18 4.18 17.56 0.512 4.07 0.119 0.17
Including 0 2.69 2.69 24.58 0.717 3 0.087 0.22
N11U-040 1.22 4.12 2.9 33.28 0.971 9.54 0.278 0.71
N11U-041 2.04 5.18 3.14 28.92 0.843 11.38 0.332 1.08
Including 3.96 5.18 1.22 68.6 2.001 23 0.671 2.56
N11U-042 To N11U-045 NSI
N11U-046 3 7.01 4.01 6.95 0.203 4.34 0.127 0.23
N11U-047 42.8 47 4.2 20.44 0.596 5.12 0.149 0.15
Including 45.51 47 1.49 52.5 1.531 7 0.204 0.2
N11U-048 16.41 20.73 4.32 11.25 0.328 3.78 0.11 0.34
Including 17.68 19.33 1.65 26.22 0.765 7.33 0.214 0.83
N11U-049 42.06 47.86 5.8 17.11 0.499 11.87 0.346 0.64
Including 42.06 44.68 2.62 32.3 0.942 19 0.554 1.11
N11U-050 15.37 19.02 3.65 11.08 0.323 3.57 0.104 0.32
Including 18.64 19.02 0.38 101.5 2.96 30 0.875 2.7
N11U-051 NSI
N11U-052 11.97 20.39 8.42 107.13 3.125 36.26 1.058 1.82
Including 12.35 12.7 0.35 41.1 1.199 17 0.496 1.19
Including 13.72 18.8 5.08 164.05 4.785 54.68 1.595 2.68
N11U-053 NSI
N11U-054 12.44 20.73 8.29 6.76 0.197 3.26 0.095 0.22

The Company is currently operating two drills continuously in the Crystal Mine. They are primarily focussed on detailing mineralized zones scheduled for the first six months of mining, beginning in June 2011. This includes filling in gaps in mineralization and extending open zones along strike and dip. Diamond drill holes N11U-038 through N11U-054 were successful in expanding known resources surrounding the 3300 ore body. Following trends suggested by earlier drilling, these not only confirmed additional mineralization but also support the validity of our new deeper understanding of the geology of this deposit. The following illustrations demonstrate how these diamond drill holes show new zones of mineralization outside of previously modelled areas. Figure 1 shows the block model in green, representing +10 g/t gold grades at the base of a shrinkage stope located at 235 mASL (meters above sea leve) in the 3300 zone. Figure 2 shows the 1g/t grade shell in the upper portion of the 3300 zone at 385 mASL, which will be a longhole stope. Both stopes will provide mill feed during the first six months of operation.

To view "Figure 1: Definition Drilling at 235 mASL in the 3300 Zone" please click http://firerivergold.com/i/misc/060611pic1.jpg

To view "Figure 2: Definition Drilling for the 385 Longhole Stope, 3300 Zone" please click http://firerivergold.com/i/misc/060611pic2.jpg

Fire River Gold Corp will continue its active drilling program ahead of advancing mining and adding to previous discoveries. With the coming of summer we will now pursue exploration of additional targets as our surface-drilling program commences.

Quality Assurance and Quality Control (QA/QC)

Rigorous controls are in place to ensure the traceability of samples and their results. Upon delivery core is prepped and logged with intervals of interest and/or mineralization marked for sampling. The core is subsequently photographed prior to cutting. Half the core is retained for future reference and the remaining half placed in double poly bags and sealed for shipment. Samples are delivered to ALS Chemex in Fairbanks, AK where they are dried, crushed, and representative splits are transported to ALS Chemex labs in Reno, NV or Vancouver, BC for assay. ALS Chemex complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025:1999. Analysis includes Fire Assay with gravimetric finish for gold and ICP for 33 other elements. Gold assays results greater than 5 ppm are automatically re-submitted for screen metallic analysis.

QA/QC is verified using external standards, blanks, and duplicates with 13% of all samples submitted being QA/QC check samples. Results are examined ensuring control samples fall within 2.5 standard deviations of certified values. Failed results are re-analyzed by the lab and/or additional samples from the remaining core are submitted for analysis.

Nixon Fork Gold Mine

The Nixon Fork Gold Mine was acquired in September 2009. From 1995 - 2007, the project produced approximately 175,000 ounces of gold at an average grade of 39 grams per ton (1.14 opt). The mining and processing facilities at Nixon Fork are permitted and bonded. The deposit is a gold-rich copper silver skarn typical of other skarn systems found throughout the world. At Nixon Fork, the higher grades are found in steeply plunging pipe-like bodies that are oxidized to depths of up to 350 meters below the surface. Oxidization of the system has resulted both in secondary copper and gold, with high grades and a "nuggety" distribution.

The Qualified Person for this news release is Richard Goodwin, P.Eng, President & C.O.O for Fire River Gold.

About Fire River Gold Corp.

Fire River Gold Corp. is a near term production company with an experienced technical team focused on bringing its flagship project, the Nixon Fork Gold Mine, back into production in Summer 2011. The Nixon Fork Gold Mine is a permitted and bonded mine which include a ~200 tpd processing plant with a gravity gold circuit, sulphide flotation circuit and a gold recovery system (CIL circuit) that is scheduled to be completed by Summer 2011. The mine also includes a fleet of surface & underground mining vehicles, a self-contained power plant, maintenance facilities, drilling equipment, an 85 person camp, office facilities and a 1.2 km long landing strip.

Fire River Gold Corp is a member of the International Metals Group.

On behalf of the Board of Directors, I look forward to keeping you updated with our corporate developments.

Richard Goodwin
President & C.O.O.

Join the conversation about Prodigy Gold.

Reply

Replies

  1. If you been hanging back on Fire River Gold it is time to Buy..!!

    The gold will be coming out on a Hercules aircraft,..!!

    It is .12-.13 cheeper than PDG..

    Is everyone sleeping..??

    Who's in..??

    Portee

    Fire River Gold Starts Up the Nixon Fork Mill

    FAU: TSX.V
    FVGCF: OTCQX
    FWR: FSE

    VANCOUVER, July 5, 2011 /CNW/ - Fire River Gold and Mystery Creek Resources (collectively "the Company") are pleased to provide the following update for the Nixon Fork Mine. It is a thorough document that provides insight into all aspects of operations at site. All photos contained in this release were recently taken and represent current conditions at site.

    Start Up Schedule

    The mill was started up on July 4th. Only the gravity and flotation circuits are being run, which will achieve approximately 80% recovery of gold from freshly mined ore.

    The crushing circuit has already been operating this past week as a commission task and to prepare road surfacing material for construction. See Figure 1 for a picture of the primary jaw crusher in operation.

    The start up plan for the plant is to process barren waste for a few days to get the material flowing through the mill. Next, low grade mineralized rock (2 to 8 g/t) will be processed over the next week as a "breaking in" period for the gravity and flotation circuits. After the breaking in period, the mill should be fully operational on gravity and flotation circuits and will start processing higher grade feed.

    Completion of the cyanide-in-leach (CIL) circuit will be ongoing during start up, with mechanical completion and commissioning projected for late fall. Adding the third process should bring total recovery up to 96%.

    The mine and mill should be fully operational and near capacity at 150 tpd of fresh ore from the mine by the end of October. By late spring of 2012, ore feed from the mine will be supplemented by recovering an additional 100 tpd of tailings from the existing tailings pond, which grades approximately 7.6 g.t (Giroux, 2010).

    The key project objectives dates are summarized as follows:

    • July 4 - Mill start up
    • Late July - First concentrate shipment of 30 tonnes from Anchorage
    • Mid to late August - First doré gold pour from gravity concentrate
    • Early September - Dry stack construction completion
    • September/October - Mechanical completion of CIL plant
    • Late October - Commissioning of CIL, start of leaching
    • Late Spring 2012 - Leaching historic tails from pond

    http://www.firerivergold.com/i/photos/070511p1.jpg
    Figure 1: Jaw Crusher in Operation

    The Mill

    There were several modifications made to the existing mill that were performed concurrent with construction completion of the CIL plant:

    • At the crushing plant, the crush size was reduced from 2 inches to 1 inch passing, which is a standard practice. This should reduce the grinding requirement and could increase the capacity of the mill.
    • The feed to the centrifugal gravity separator used to come from the cyclone overflow. This has been re-routed to draw from the cyclone feed. This should increase gold recovery and system operational reliability. Gravity gold is the cheapest to process and has the highest value, so this will have a strong economic benefit to operations.
    • A slurry storage tank was added between the concentrate thickener and filter to decouple the two processes and make them more efficient. Peristaltic pumps were also installed to maintain a high density and low flow. In past operations moistures as high as 20% were reported in the concentrate. We anticipate a much lower moisture content of in the new concentrate.

    The flotation circuit is very simple, using only xanthate and frother. No pH control is required. As such, no improvement to the existing circuit was deemed necessary. Our objective will be to moderate copper content in the concentrate, which varied from 10 to 25% historically.

    http://www.firerivergold.com/i/photos/070511p2.jpg
    Figure 2: Gravity and Flotation Circuits at the Mill

    The Carbon-In-Leach (CIL) Circuit

    Two of the five cyanide leach tanks have been fully installed and a third is partially complete. Though at site, these were delayed so that several smaller installation around the large tanks would not be obstructed.

    The main components of the carbon stripping and electrowinning circuits have been installed. Piping and electrical work will start in earnest in mid August. Nearly all remaining equipment is at site, the exception being the agitators for the detox tanks, which are the critical path item for mechanical completion, which is anticipated for mid September.

    A cyanide source has been secured for delivery in October.

    http://www.firerivergold.com/i/photos/070511p3.jpg

    The Filtered Tailings Disposal Site (Dry Stack)

    The original design of the dry stack was for water collection beneath the sand in porous pipes, transferring to a pond for sampling and percolation into the earth. The company elected to line the dry stack and enlarge and convert the percolation pond to a lined collection pond to make this a zero discharge facility. This is the only significant construction activity outside of the mill building in 2011. A fleet of construction equipment is being assembled at site, including an excavator, dozer, front end loader, and articulated truck for this work. A crew of six will complete this construction by the end of August. Completion of the dry stack is necessary prior to the commissioning of the CIL circuit.

    The Mine

    The mine has been in operation for several months, with mine rehabilitation, ore stockpiling, waste development, and diamond drilling being the primary activities.

    All mine rehabilitation work is complete, the largest project being the refurbishing of the ventilation raise which serves as a secondary egress.

    Two primary waste headings are being driven: 1) the Crystal Ramp is being extended to depth to access the down-dip extensions of 3000 and 3300 zones and 2) a shallow ramp is being driven from the Crystal Mine to connect it to the Mystery Mine. To-date the Crystal Ramp has been driven 42 m and the Mystery drive has been driven 90 m. A ventilation drift for the Crystal ramp extension has also been completed, a distance of 33 m.

    The Mystery Mine connection drift is a shallow ramp, driven at 6% grade from the Crystal Mine, starting at 170 mASL. This connection is crucial to future operations, as it will open up the Mystery Mine for mining operations (current resources in the Mystery Mine are 28,400 tonnes indicated grading 23.7 g/t for a total of 20,900 indicated oz Au using a cut-off grade of 10 g/t, from Giroux, 2010). It will also provide excellent drill platforms to explore the zone between the mines, including the Southern Cross and J5A mineralized zones.

    Mining and development activities are still ramping up to full capacity as the manpower expands to its full complement of 90 site employees. Approximately half of the new production mining fleet has arrived at site, including a one-boom Tamrock jumbo, BC2 longhole drill, 4 yd³ R1300 scooptram, and a 20 tonnes Dux truck. A second Dux truck and R1300 scooptram are scheduled to arrive early in June. The second scooptram will be remote-capable, expanding stoping method options for the operation. Additional equipment is being considered to enhance productivity, including a rockbolting machine. The mine is expected to achieve its full production target of 3800 ounces per month by October 2011.

    http://www.firerivergold.com/i/photos/070511p4.jpg

    Figure 3: Mine Equipment Purchases (L to R: One Boom Jumbo, 4 yd³ Scooptram, LH Drill)

    Stockpile Management

    At present a stockpile of approximately 2300 tonnes of high grade material and 100 tonnes of medium grade material is stored in front of the primary jaw crusher outside of the mill building (Figure 4). In addition, approximately 500 tonnes of low grade material has been stored on a nearby laydown (Figure 5). This material is segregated into piles awaiting grade determination by assay (note the identifying stakes for each pile) before being added to one of the piles or disposed of onto the waste dump.

    http://www.firerivergold.com/i/photos/070511p5.jpg
    Figure 4: High Grade Stockpile (left) and Medium Grade Stockpile (right) ahead of Primary Crusher

    http://www.firerivergold.com/i/photos/070511p6.jpg
    Figure 5: Low Grade Stockpile (to right) and Unclassified Material Piles

    Water in the Mine

    There is much speculation, but few facts known about the groundwater situation in the mine. At present there is approximately 3 m of water at the bottom of the old ramp and approximately 0.3 m in the new ramp heading. The water level in the mine is known to fluctuate as much as 6 m in the spring after the snow melt.

    While the full extent of the groundwater significance is not known, the mine is taking several steps to manage groundwater inflows should they become problematic to the crystal ramp development, including:

    • Locating the drive in tightly healed limestone
    • Installing a 200,000 gallon reservoir at 170 mASL to pump inflow water (completed July 3rd) and a second 70,000 gallon reservoir at 340 mASL for drill water storage
    • Diamond drilling ahead of the development heading to explore groundwater and fracture conditions
    • Acquiring a large capacity grout pump and contracting experts to guide the grouting program should one be required
    • Acquiring four evaporation misting machines to dispose of excess groundwater through accelerated surface evaporation (one unit is already in service at the tailings pond, see Figure 6).

    http://www.firerivergold.com/i/photos/070511p7.jpg
    Figure 6: Evaporation Mister at Tailings Pond

    Drilling

    The mine has two Hagby drills that have been operated underground over the past several months. Drill results have been extensively covered by numerous press releases over that period.

    The main objective of recent drilling was ore definition in support of the earliest mining in the upper Crystal Mine, approximating the first six months of production. This work is complete and the drills are now being turned to exploration targets on surface and underground. The most important target for both is the zone between the Mystery and Crystal mines, which houses three targets: the Southern Cross, J5A, and 3100 zones. These will be more effectively drilled once platforms have been provided by the shallow ramp connecting the Mystery and Crystal Mines.

    The Company maintains that the property is fairly large and the ability to replenish mining on an annual basis is a probable and appropriate approach to extending the life of the operation.

    http://www.firerivergold.com/i/photos/070511p8.jpg
    Figure 7: Hagby Drill Set Up Underground

    Assay Lab

    One challenge of start up has been to fully staff the assay lab, which has been accomplished with the addition of four assayers.

    While the ore is visually discernable, the precise grade is not, and there is enough latitude that the geologists are regularly surprised in both directions - assays demonstrating higher and lower grade than expectations based on visual examination. Accordingly, a quick turn-around of assays is necessary to properly manage the determination of ore and waste. The number of results per day will increase with mill start up, as the underground testhole, chip samples, and muck pile samples with be joined by numerous daily checks on mill feed, gravity, flotation, concentrate and final tailings determinations.

    Diamond drill samples are still assayed independently such that they can be used to support resource and reserve estimations.

    http://www.firerivergold.com/i/photos/070511p9.jpg
    Figure 8: Fire Assaying for Stockpile Grade Determination

    Marketing Contracts

    Negotiation of contracts for the off-take of concentrate and dore bars are under active discussion with a number of major buyers. The concentrate will leave site in 1 tonne totes on pallets aboard a C130 Hercules aircraft. The doré will be shipped in 25 to 30 kg bars that will be comprised of gold (60%), silver (30%), and impurities (10%). No delay to revenue is anticipated due to completion of either contract.

    Security

    A contract has been awarded to an independent contractor Doyon Universal Services LLC for continuous surveillance of the mill area and to accompany all shipments from site. The Company is confident that the surveillance equipment installed coupled with the diligence of a third-party security team will protect the operation from losses due to theft.

    Logistics

    Being an air-support operation, efficient logistics are crucial to the property's success. Our primary fuel supplier, Everts Air Cargo, has successfully built up our inventory at site such that for the first time in our project's history we refused a fuel flight last week. Figure 9 shows the Everts DC-6 offloading fuel into the Nixon Fork tanks. Note that the art on the nose depicts the plane's original owner, Mr. Howard Hughes.

    http://www.firerivergold.com/i/photos/070511p10.jpg
    Figure 9: Everts Air Cargo's DC-6 Transferring Fuel

    Most of the heavy equipment at site was lifted from Anchorage aboard a Lockheed C-130 Hercules airplane, supplied by Lynden Air Cargo (Figure 10). This plane will also be used for all bulk supply, such as cyanide, lime, cement, and to fly copper concentrate from site. Excess payload capacity is often exploited by offloading wing fuel from the plane to our fuel storage tanks.

    http://www.firerivergold.com/i/photos/070511p11.jpg
    Figure 10: Lynden C-130 Hercules Airplane Arriving at Nixon Fork Mine

    Anchorage Office

    The Company has established an Anchorage office, which is embedded in Lynden's main facility. Project accounting, human resources, and logistics coordination will be managed from this office.

    Closing Comments

    Needless to say we are all excited about achieving this milestone. I am very proud of our workers and our management and thank each employee, consultant, and contractor whose contribution got us to this point. It has certainly been a team effort with many helping hands.

    On behalf of the Board of Directors,

    (signed)

    ------------------------------------------------------

    Richard Goodwin
    President & COO

    Disclaimer: Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward-looking statements. A feasibility study has not been completed and there is no certainty the disclosed targets will be reached nor that the proposed operations will be economically viable. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy accuracy of this release. We seek safe harbour.

    For further information:

    Tel: +1 604 685 1870 Fax: +1 604 685 8045
    Email:[email protected] or visit www.firerivergold.com
    2303 West 41st Avenue, Vancouver, B.C., Canada, V6M 2A3

    1. More gold..I love it..

      Fire River Gold Announces Additional Drill Results At Nixon Fork Gold Mine, Alaska

      FAU: TSX.V
      FVGCF: OTCQX
      FWR: FSE
      www.firerivergold.com

      VANCOUVER, July 7, 2011 /CNW/ - Fire River Gold Corp (TSXV: FAU) (OTCQX: FVGCF) (FSE: FWR) ("FAU" or the "Company") is pleased to announce additional high-grade results obtained from holes drilled during its 2011, 28,000 metre drill program at the Nixon Fork Gold Mine, situated in Alaska's Tintina Gold Belt. The Company has received and confirmed assay results from the drill holes N11U-055 to N11U-094 from the 3000, 3200 and 3300 Zones. Diamond drill hole N11U-94 demonstrates new high grade zones of mineralization outside of the previously modelled area. This series of drill holes were extremely productive in expanding the extent of the gold mineralization of the 3300 zone. Of particular note is hole number N11U-068 that exhibited visible gold associated with native bismuth (See Figure 1). This demonstrates a known geochemical association of gold and bismuth in this deposit.

      http://firerivergold.com/i/photos/070711p1.jpg

      A complete listing of the drill hole intercepts are provided in Table 1.

      Table 1: N11U-057 to N11U-94

      Hole Number Zone FROM
      (m)
      TO
      (m)
      Width
      (m)
      Au
      (g/t)
      Au
      (opt)
      Ag
      (g/t)
      Ag
      (opt)
      Cu
      (%)
      N11U-057 3200 49.68 52.77 3.09 2.54 0.074 5.00 0.146 0.08
      N11U-061 3200 39.32 47.42 8.10 13.33 0.389 12.23 0.357 0.66
      Including 40.84 43.92 3.08 23.57 0.687 15.36 0.448 0.89
      Including 45.72 47.42 1.70 17.15 0.500 24.00 0.700 1.27
      N11U-063 3200 54.41 55.93 1.52 2.21 0.065 1.00 0.029 0.01
      N11U-065 3200 50.31 51.72 1.41 1.51 0.044 10.44 0.305 0.41
      Including 52.73 55.17 2.44 1.99 0.058 61.75 1.801 2.92
      Including 55.07 55.17 0.10 5.20 0.152 14.00 0.408 0.64
      N11U-066 3300-235 1.47 6.90 5.43 25.56 0.746 5.63 0.164 0.26
      Including 3.88 4.23 0.35 34.70 1.012 22.00 0.642 1.88
      Including 5.49 6.90 1.41 86.16 2.513 8.94 0.261 0.35
      N11U-068 3300-235 0.91 8.59 7.68 5.50 0.160 3.81 0.111 0.17
      Including 7.01 8.59 1.58 16.84 0.491 7.57 0.221 0.52
      Including 10.06 14.25 4.19 3.73 0.109 1.74 0.051 0.07
      Including 10.06 11.58 1.52 7.19 0.209 2.00 0.058 0.14
      Including 13.85 14.25 0.40 8.77 0.256 5.00 0.146 0.04
      N11U-072 3300-240 7.98 9.45 1.47 3.59 0.105 2.00 0.058 0.09
      N11U-073 3200 42.37 45.10 2.73 23.18 0.676 6.91 0.202 0.32
      Including 44.09 45.10 1.01 41.20 1.202 10.00 0.292 0.60
      Including 52.12 54.64 2.52 5.87 0.171 32.58 0.950 0.90
      Including 53.25 54.64 1.39 9.74 0.284 55.00 1.604 1.52
      N11U-075 3000Z 22.77 23.17 0.40 2.40 0.070 70.00 2.042 4.35
      N11U-076 3300-240 18.95 19.40 0.45 181.50 5.294 57.00 1.662 3.30
      N11U-077 3000Z 18.70 23.25 4.55 2.03 0.059 17.55 0.512 0.53
      N11U-078 3300-240 7.30 8.84 1.54 1.38 0.040 1.00 0.029 0.04
      N11U-079 3000Z 18.27 19.98 1.71 2.52 0.073 127.28 3.712 2.32
      Including 18.27 18.62 0.35 5.84 0.170 405.00 11.812 4.04
      N11U-081 3000Z 19.09 21.04 1.95 2.26 0.066 46.90 1.368 1.34
      N11U-082 3300-240 8.74 10.36 1.62 126.35 3.685 63.33 1.847 5.15
      Including 8.74 9.76 1.02 196.50 5.731 100.00 2.917 8.10
      N11U-083 3000Z 25.11 29.79 4.68 7.67 0.224 42.22 1.231 1.37
      Including 25.11 25.72 0.61 12.50 0.364 13.00 0.379 0.68
      Including 26.97 28.49 1.52 13.36 0.389 41.00 1.196 1.38
      N11U-084 3300-240 9.48 12.28 2.80 40.93 1.194 7.78 0.227 0.29
      Including 10.15 10.45 0.30 317.00 9.246 46.00 1.342 1.98
      Including 31.75 32.26 0.51 16.55 0.482 18.00 0.525 1.14
      N11U-086 3300-240 20.29 21.54 1.25 15.80 0.000 14.00 0.408 0.65
      N11U-088 3300-240 16.74 18.16 1.42 9.36 0.273 2.80 0.082 0.37
      Including 16.74 17.59 0.85 14.40 0.420 4.00 0.117 0.60
      N11U-089 3000Z 19.78 27.10 7.32 3.66 0.107 62.36 1.819 1.86
      Including 22.74 25.70 2.96 6.42 0.187 90.78 2.648 2.79
      N11U-090 3300-240 17.93 22.29 4.36 14.69 0.428 14.72 0.429 0.72
      Including 19.20 21.17 1.97 22.08 0.644 16.85 0.491 0.70
      N11U-092 3300-240 17.68 20.56 2.88 17.96 0.524 7.19 0.210 0.27
      Including 19.20 20.56 1.36 35.60 1.038 13.00 0.379 0.49
      Including 24.28 28.64 4.36 57.01 1.663 32.44 0.946 2.21
      Including 24.28 25.24 0.96 55.20 1.610 77.00 2.246 5.68
      Including 27.52 28.64 1.12 174.50 5.090 55.00 1.604 3.70
      Including 29.87 32.92 3.05 3.31 0.097 1.00 0.029 0.12
      N11U-093 3000Z 15.24 15.74 0.50 3.22 0.094 208.00 6.067 0.43
      Including 17.06 18.24 1.18 1.80 0.052 23.36 0.681 0.04
      Including 17.06 17.40 0.34 3.62 0.106 44.00 1.283 0.07
      N11U-094 3300-240 26.46 34.59 8.13 93.52 2.728 2.72 0.079 0.05
      Including 26.46 28.35 1.89 190.23 5.548 2.44 0.071 0.03
      Including 32.67 34.59 1.92 31.76 0.926 1.88 0.055 0.02
      N11U-095 3000Z 0.00 2.63 2.63 2.12 0.062 4.46 0.130 0.09
      Including 0.00 1.55 1.55 2.61 0.076 2.00 0.058 0.02

      Table 2: List of No Significant Intersections and Not Sampled Drill Holes

      N11U-055 3200 NSI
      N11U-056 3300-235 NSI
      N11U-058 3300-235 NSI
      N11U-059 3200 Not Sampled
      N11U-060 3300-235 NSI
      N11U-062 3300-235 NSI
      N11U-064 3300-235 NSI
      N11U-067 3200 Not Sampled
      N11U-069 3200 NSI
      N11U-070 3300-235 NSI
      N11U-071 3200 Not Sampled
      N11U-074 3300-240 NSI
      N11U-080 3300-240 NSI
      N11U-085 3000Z NSI
      N11U-087 3000Z Not Sampled
      N11U-091 3000Z NSI

      Most of the holes released to-date have been for the purpose of ore definition in known blocks of mineralization. The 3000Z and 3200 zone holes are more exploratory, seeking additional mineralization in the upper Crystal mine beyond the mining zones of the six month operating plan.

      On behalf of the Board of Directors, I look forward to keeping you updated with our corporate developments.

      Richard Goodwin
      President & C.O.O.

      Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental and permitting risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward-looking statements. A feasibility study has not been completed and there is no certainty the disclosed targets will be reached nor that the proposed operations will be economically viable. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. We seek safe harbour.

      For further information:

      Tel: +1 604 685 1870 Fax: +1 604 685 8045
      Email: [email protected] or visit www.firerivergold.com
      2303 West 41st Avenue, Vancouver, B.C., Canada, V6M 2A3

      1. Fire River Gold Corp. Announces Refining Contract

        FAU: TSX.V
        FVGCF: OTCQX
        FSE: FWR
        www.firerivergold.com

        VANCOUVER, July 11, 2011 /CNW/ - Fire River Gold Corp. (the "Company", "FAU") (TSX.V: FAU) announces a one year term refining contract with Johnson Matthey Inc. of Salt Lake City, Utah. On mutual agreement, this contract will be automatically renewed after the first 12 month period.

        Johnson Matthey's operations comprise of refining gold and silver, bullion manufacturing and then selling on the open market. Johnson Matthey will be refining the doré bars shipped by Fire River Gold from the Nixon Fork Gold Mine in their facilities in Salt Lake City, Utah, which when delivered to the refinery, will contain approximately 70% gold and 30% silver.

        Half of Fire River Gold's revenue from the Nixon Fork Gold Mine will be generated from the sale of the doré bars to the refinery in Utah. The other half of the revenue generated will be from the sale of a copper concentrate which will be shipped to a smelter (contract pending). The first shipment of doré bars to Johnson Matthey will be delivered in the month of August.

        On behalf of the Board of Directors,


        Richard Goodwin
        President & C.O.O.

        1. Fire River Gold is sending out the gold to market now and is finally getting some respect..Has anyone joined in the Company..??

          I have been buying at this level for a couple of years and am ready for the harvest..I believe today is a good indication..

          FIRE RIVER GOLD CORP 3:19:46 PM EDT
          Symbol T Bid Ask Last Change Volume FSI
          FAU CA V + 0.49 0.495 0.49 0.065 (15.29%) 961,450
          Bid Size 65 Ask Size 106 Earn. Per Share 0.00
          Day High 0.49 Day Low 0.43 Price/Earnings 0
          Open 0.43 Yield 0.00 Dividend 0.00
          52 Week High 0.62 52 Week Low 0.375 Ex-Dividend

          Still a screaming bargin at .49

          http://www.newswire.ca/en/releases/archive/August2011/25/c6129.html

          Portee

        2. Still hanging in under .50....

          Portee

          Fire River Gold Receives First Concentrate Payment

          VANCOUVER, Sept. 14, 2011 /CNW/ - Fire River Gold Corp. and Mystery Creek Resources Inc. (TSX.V: FAU), (OTCQX: FVGCF), (FSE: FWR) (collectively "the Company") is pleased to announce that it has received an advance payment of $1.8 M from Glencore International PLC for the first shipment of gold-rich copper concentrate from the Nixon Fork Mine.

          This payment is a provisional advance for the first 48 bags comprising 42.6 dmt (dry metric tonnes) of gold-rich copper concentrate. The bags are palletized and flown from the Nixon Fork Mine aboard a Hercules L382G airplane. Shipping lots of 24 bags are assembled in Anchorage at Lynden Air Cargo's facility and barged in secured 40 ft containers to Seattle for ocean transport to the PASAR smelter in Isabel, Philippines.

          About Fire River Gold Corp.

          Fire River Gold Corp.'s Nixon Fork Mine is operated by Mystery Creek Resources, a wholly owned subsidiary of Fire River Gold, which is based in Anchorage, Alaska.

          The Nixon Fork Mine, located in the resource rich Tintina Gold Belt, is Alaska's newest operating gold mine and is projected to produce 50,000 ounces of gold per year.

          Operations started in July of 2011, with plans to ramp up to full production by late fall 2011. This year-round mining program will be producing both concentrate and doré bars. Fire River Gold will be replenishing what is mined on an annual basis by further drilling exploration targets on surface and underground thereby extending the life of the operation and receiving further benefit from the strong metals market.

          Fire River Gold has a stable platform for growth due to its strong financial position, a talented and experienced management team and Board of Directors who have the experience to execute on Fire River Gold's strategy.

          Nixon Fork is a past producing mine with a high grade production history (42 g/t), and a low capital requirement due to pre-existing infrastructure. Fire River Gold has no debt and is well funded.

          On behalf of the Board of Directors,

          (Signed)

          Richard Goodwin
          President & C.O.O.

          1. The latest DRill results..out today..

            2-3 ounces per ton over 11 feet..(3.4 meters)

            Fire River Gold Corp. Announces Drill Results from the 3550 Hi Grade Recreation Zone

            FAU: TSX.V
            FVGCF: OTCQX
            FSE: FWR

            VANCOUVER, Nov. 1, 2011 /CNW/ - Fire River Gold Corp. and Mystery Creek Resources Inc. (the "Company", "FAU") (TSX.V: FAU), (OTCQX: FVGCF), (FSE: FWR) is pleased to announce high-grade results obtained from the discovery of the new 3550 Zone at the Nixon Fork Mine, which are shown in Table 1, below:

            HOLE # TARGET FROM
            (m)
            TO
            (m)
            Width
            (m)
            Au
            (g/t)
            Au
            (opt)
            Ag
            (g/t)
            Ag
            (opt)
            Cu
            (%)
            N11U-225 3500
            Significant Intersections 104.8 109.1 4.3 8.4 0.25 13.4 0.39 0.7
            N11U-226 3500
            Significant Intersections 112.6 119.8 7.2 46.0 1.34 47.8 1.39 2.9
            Including 113.5 117.0 3.4 93.8 2.74 94.3 2.75 5.8
            N11U-228 3500
            Significant Intersections 106.1 113.7 7.6 32.8 0.96 64.6 1.88 2.7
            Including 106.1 108.7 2.6 92.2 2.69 169.7 4.95 7.2

            Table 1: Assay Results from Zone 3550

            Because of the shallow dip of the drill holes, apparent widths approximate true widths for these intersections.

            The holes have been drilled in the down dip extension of a previously mined ore body called the Hi Grade Recreation Zone, which was mined to a depth of 50 m from surface (to 330 mASL) in the 1920s, as depicted in Figure 1. The zone was found to bottom out in the original mining program, and diamond drilling performed by the company and prior operators could not establish the existence of a down-dip extension.

            Applying a horizontal offset evident in the 3300 Zone to the 3550 Zone, our geologists deduced that it was possible that the down-dip extension existed. Three longer holes were planned and drilled to test the theory, which yielded very positive initial results in the form of mineralized zones with visible gold, usually an indicator of high grade mineralization (Table 1).

            http://www.firerivergold.com/i/misc/3550White.jpg

            Figure 1: The New 3550 Zone at the Nixon Fork Mine Project

            The 3000 and 3300 zones extend continuously from surface at approximately 400 mASL to 90 mASL and neither has been "bottomed out". Approximately 185,000 ounces of gold has been extracted in the modern era (from 1993 to present), most of which has been from the 3000 and 3300 zones. Both have been mined from the main ramp to a depth of 160 mASL. Current mining activities are also concentrated on these two zones. The 3550 Zone could represent a "triplet" to these two significant zones, and provide the opportunity to significantly increase our resources and mine life. If the 3550 zone demonstrates the same vertical continuity as the two other zones, its location is ideal for minimizing the capital cost and time requirement to establish access for mining, as the entire vertical extent will be close to existing development.

            Quality Assurance and Quality Control (QA/QC)

            Rigorous controls are in place to ensure the traceability of samples and their results. Upon delivery core is prepped and logged with intervals of interest and/or mineralization marked for sampling. The core is subsequently photographed prior to cutting. Half the core is retained for future reference and the remaining half placed in double poly bags and sealed for shipment. Samples are delivered to ALS Chemex in Fairbanks, AK where they are dried, crushed, and representative splits are transported to ALS Chemex labs in either Reno, NV or Vancouver, BC for assay. ALS Chemex complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025:1999. Analysis includes Fire Assay with gravimetric finish for gold and ICP for 33 other elements. Gold assays results greater than 5 ppm are automatically re-submitted for screen metallic analysis.

            QA/QC is verified using external standards, blanks, and duplicates with 13% of all samples submitted being QA/QC check samples. Results are examined ensuring control samples fall within 2.5 standard deviations of certified values. Failed results are re-analyzed by the lab and/or additional samples from the remaining core are submitted for analysis.

            The Qualified Person for this news release is Richard Goodwin, P.Eng, President & C.O.O for Fire River Gold.

            On behalf of the Board of Directors,

            (Signed)

            Richard Goodwin
            President & C.O.O.