Skip to content
Sign in

Post

PyroGenesis Inc.

You’re reading tgibes’s reply in this thread.Jump to it

Mail Room3.0 rating from 2 members60 ptsRate

Additive Manufacturing Question

Mr. Pascali,

 

Your latest company presentation dated April 6, 2021 has the following wording in the Additive Manufacturing section.

• In discussion with large North American OEM to install our record breaking technology into production lines

Does this refer to making the OEM aware of the most recent production improvements or could this possibly imply that Pyrogenesis would be negotiating installing a powder tower into the customers production line directly?

 

Thank you for taking the time to answer our questions,

Terry

Sign in to ask the company to answer this.

Join the conversation about PyroGenesis Inc.

Reply

Replies

  1. Hi Terry, you need to make your question to agoracom, unless Peter spots it directed to him.

    Just my random thoughts, 

    I believe OEM's and 3D printers have been waiting for years for these improvements to be locked in. But Pyro kept improving on the damn plasma machine. First MIM cuts, then the NextGen 25-30 kg/hr process, then free tunsten, etc. And from the interviews and press releases, these improvements need to be locked in before the QA, otherwise, they can't do so. Which would mean less profits/powders, etc. 

    I don't think people realize how long it'd take from samples, more samples, to testing of the product fitted for the specified powder, to locking in a deal. I think we are finally at that the end stage, where we start seeing contracts/values attached to it. 

    If you reference in Pyrogenesis earlier plans, 2015-2017 news releases, Peter states that is the "industrial" plan. If a client orders substantial amounts, they can work out a plan to implement 3-5 towers I believe in/near their production lines.

     

      1. No worries. You actually made me go back and read the releases again and it kind of clicked in.

        This North American OEM is potentially needing alot, over 500kg was deemed significant,

        Say 5 machines, at 25kg/hr, I imagine Pyrogenesis will need a bare minimum sale, and any extra is additional $?

        Each machine originally is deemed 10 million generating to pyro. And to have it at their factory, I imagine it has to been long term and better incentives. 

        So we could imagine.... The possiblity of 30-50 million minimum to install it in their lines. With time frames of just under a year for installations and test runs. Possibly sooner. 

        My 2 cents