  1. Dear Bamb,  


    It’s been brought to my attention that while you are ‘innocently’ asking for an update on Client B here on Agoracom, you have been trolling away on other less-regulated forums. To make matters worse, you already know the answer to your question – you quoted the passage of our most recent MD&A that gives an update on Client B. All of a sudden your question doesn’t seem so innocent.  


    So, lets set the record straight for those that really want to know and have no hidden agenda…we give updates on this topic in almost every one of our MD&As contained in our financials. 


    The latest being November 6th when we posted our 3rd quarter results, where we said:  


    Iron Ore Pelletization Torch Trials:

    CLIENT B


    As mentioned in previous Outlooks, the commissioning of the plasma torch systems – for use in the pelletization furnaces of a client previously identified as Client B – was underway, with the Company’s engineers onsite at Client B’s iron ore facility. The commissioning process includes installation, start-up, and site acceptance testing (SAT). The Company previously announced that it had shipped four 1 MW plasma torch systems for use in Client B’s iron ore pelletization furnaces, for trials toward potentially replacing fossil-fuel burners with plasma torches in Client B’s furnaces.

    As also mentioned in previous Outlooks, this project continues to move forward after the commissioning suffered a series of unforeseeable delays and infrastructure challenges caused by, among other things, damaging torrential rainstorms that flooded and damaged the facility’s electrical system and furnace components, and intermittent power outages that led to damage of the plasma burners cooling system.

    However, Client B remains committed and trials are ongoing, and will remain as such until the customer determines they have sufficient performance data. The latest information provided to the Company suggests a late Q1 2025 timeline for the completion of this performance testing and data gathering phase, though this is an estimate.    


    You can also find the full details in  our press release dated November 6, 2024 here:

    https://ir.pyrogenesis.com/news-releases/news-release-details/pyrogenesis-announces-2024-third-quarter-results  


    Hope that Helps  


    Peter

    1. Thanks for this Peter. With respect to the following statement: "intermittent power outages that led to damage of the plasma burners cooling system."....is this an onboard cooling system manufactured into the burners or something separate incorporated into the environment? If built in, is there a way to surge proof these in the future to avoid similar occurences? (Sorry, risk mgmt guy here and its just built into my thought processes...lol)


      1. Dear EarthInvestor,


        Good Question.


        Thanks for posting.

         

        The cooling water system is a critical auxiliary system that we supply with the plasma torches.


        There are several ways to add an emergency backup system to protect the torches in case of a power failure, including having a backup generator to run our water pump motor, or to use another source of cooling water already available on site.

         

        After the major outage the plant experienced, we implemented the latter at client B.

         

        On a separate note, this plant where we have the torches installed is an extremely old plant and presents one of the most difficult environments to run in…it is extremely tough on machinery not to speak of the working conditions for those that work there.  Having said that, even in this tough amongst toughest environments we are doing well. 

         

        Hope that Helps

        PPP