Dear Cusam,
Good series of questions. Thanks
for posting.
Let me tackle your questions in
order:
1.
When will PYR powders be on the OEM's approved
list and do you intend to name the OEM when it happens?
ANSWER:
We have been expecting to be on
the approved list “any day now” since summer. Having said that we were
recently advised it really should be any time now, but again, we have no
control over their internal processes, so we just have to be patient and rely
on what we have been told. We do intend to announce the name of the OEM
unless they strictly prohibit it. We do not see why they would prohibit
it as the list is not a private matter.
2.
Can you please elaborate on the project with
Constellium? In previous press releases it mentions "large scale plasma
remelting furnaces". Can you elaborate on the magnitude of this project
(i.e how many torches required for Constellium and other companies).
ANSWER:
The project with Constellium is a
scale up from bench scale to semi-industrial scale at their main R&D center
in France. Now, bench scale for this project is much bigger than what one may
think of as a regular best test. This bench scale consisted of Constellium
shipping to PyroGenesis a small test melting furnace that was installed and
operated in one of our factories over the course of a few months.
Here's a picture of that furnace
in operation on site at PyroGenesis: https://ml.globenewswire.com/Resource/Download/69d460b5-491e-4cb4-a58a-20ddb13fde42/reverb-furnace1-1.jpg
Using that exact furnace, we
conducted melting trials on a variety of different alloys, and we gathered data
as to the melting speed, temperature, and resulting metal quality, among other
aspects.
In the first phase it entails the
supply of one full plasma system including one torch with corresponding power
supply, cooling and controls. The second phase will eventually see that system
moved to a bigger furnace in the same facility, where an additional plasma
system from PyroGenesis is planned to be added. In both cases, "large
scale remelting furnace" means going from melting kg (as in the first
Constellium project) to melting tons of aluminum (as in their new project).
With Constellium, and with other big players in this sector that PyroGenesis is
currently working with, these projects aim to implement plasma at the lower-end
of what’s considered big enough to be representative of a production facility,
such as a recycling plant. In the short term this represents, for us, at least
two full plasma systems with two different companies.
3.
Has there been discussions with Earthgrid in
regards to large scale order to support their $18 Billion Dollar Joint Venture?
ANSWER:
We have been speaking with
Earthgrid with respect to torch orders. As you probably know the next
steps forward are highly dependent on Earthgrid securing funding for such torch
purchases from PyroGenesis. Other than that we defer to Earthgrid for
more details/specifics
Hope that Helps
PPP