Hi Peter, 


Good to see you back. Couple questions i have for you: 


1) When will PYR powders be on the OEM's approved list and do you intend to name the OEM when it happens?


2) Can you please elaborate on the project with Constellium? In previous press releases it mentions "large scale plasma remelting furnaces". Can you elaborate on the magnitude of this project (i.e how many torches required for Constellium and other companies).


3) Has there been discussions with Earthgrid in regards to large scale order to support their $18 Billion Dollar Joint Venture?


Hoping for a great year ahead.

Sign in to ask the company to answer this.

Join the conversation about PyroGenesis Inc.

Reply

Replies

  1. Dear Cusam,

     

    Good series of questions. Thanks for posting.

    Let me tackle your questions in order:

     

    1.       When will PYR powders be on the OEM's approved list and do you intend to name the OEM when it happens?

     

    ANSWER:

     

    We have been expecting to be on the approved list “any day now” since summer.  Having said that we were recently advised it really should be any time now, but again, we have no control over their internal processes, so we just have to be patient and rely on what we have been told.  We do intend to announce the name of the OEM unless they strictly prohibit it.  We do not see why they would prohibit it as the list is not a private matter.

     

    2.       Can you please elaborate on the project with Constellium? In previous press releases it mentions "large scale plasma remelting furnaces". Can you elaborate on the magnitude of this project (i.e how many torches required for Constellium and other companies).

     

    ANSWER:

     

    The project with Constellium is a scale up from bench scale to semi-industrial scale at their main R&D center in France. Now, bench scale for this project is much bigger than what one may think of as a regular best test. This bench scale consisted of Constellium shipping to PyroGenesis a small test melting furnace that was installed and operated in one of our factories over the course of a few months.

     

    Here's a picture of that furnace in operation on site at PyroGenesis: https://ml.globenewswire.com/Resource/Download/69d460b5-491e-4cb4-a58a-20ddb13fde42/reverb-furnace1-1.jpg

     

    Using that exact furnace, we conducted melting trials on a variety of different alloys, and we gathered data as to the melting speed, temperature, and resulting metal quality, among other aspects.

     

    In the first phase it entails the supply of one full plasma system including one torch with corresponding power supply, cooling and controls. The second phase will eventually see that system moved to a bigger furnace in the same facility, where an additional plasma system from PyroGenesis is planned to be added. In both cases, "large scale remelting furnace" means going from melting kg (as in the first Constellium project) to melting tons of aluminum (as in their new project). With Constellium, and with other big players in this sector that PyroGenesis is currently working with, these projects aim to implement plasma at the lower-end of what’s considered big enough to be representative of a production facility, such as a recycling plant. In the short term this represents, for us, at least two full plasma systems with two different companies.

     

    3.       Has there been discussions with Earthgrid in regards to large scale order to support their $18 Billion Dollar Joint Venture?

     

    ANSWER:

     

    We have been speaking with Earthgrid with respect to torch orders.  As you probably know the next steps forward are highly dependent on Earthgrid securing funding for such torch purchases from PyroGenesis.  Other than that we defer to Earthgrid for more details/specifics


    Hope that Helps

    PPP