Dear Mr Pascali 


In previous Financials,  there has been mention of  middle eastern companies talking about a substantial order of Drosrite furnaces.  What is substantial in your mind, considering the last order was for 7 Drosrite furnaces?


Also it's  been mentioned that talks with other companies in North America and Europe are in various stages of negotiations,  regarding Drosrite. 


Going by previous sales of Drosrite, it seems strange that none of the other sales of Drosrite furnaces took 3 or 4 years to make a decision.  Since there's  been nothing but good reports and feedback on companies currently operating Drosrite,  and from your own comments saying the 3 Drosrite furnaces operating in Saudi Arabia are  operating with better than expected results.  There seems to be a bit of a disconnect.


Could  you shed some light on why so long in-between sales?


Thank you 

Sign in to ask the company to answer this.

Join the conversation about PyroGenesis Inc.

Reply

Replies

  1. Dear Torchfan,

     

    Thanks for posting again.


    Interesting question…. I do not seem to recall, nor can i find anywhere, where I referred to a “substantial order”, but let us assume I would have, then what would I consider to be substantial? We have stated in the past that “…The Company is in various stages of discussions with aluminum manufacturers to purchase Drosrite aluminum dross processing systems, including with two Middle Eastern aluminum companies for the purchase of multiple 5,000+ tonnes per year Drosrite furnaces... " I think I will allow that statement to speak for itself.


    With respect to your question pertaining to why the delay between sales, one must distinguish between sales done for new/expansion and those unseating legacy technology.


    With respect to new sales/expansion we find the sale cycle a bit faster/easier than for replacement sales.  With new projects we respond to an RFP and we are off to the races.  In fact, the Saudi deal we are working on today, was just that.  It was a new project, and it was one of the largest RFP for dross handling ever put out to bid.  These types of opportunities do not come around that often.


    With respect to clients that are looking to replace their existing system, the process is a bit longer/drawn out and makes sense, as you will see.  First the potential client wants to review all technical data. After that, and only once he is convinced that it may work in his process, he wants to see one in operation.  Now, we have to coordinate this with a client of ours who, as you can appreciate, are not in the business of showcasing our product.  There are security issues, insurance issues, visa applications, just to name three of many boxes that must be ticked off before a visit can be arranged…then there is the challenge of arranging multiple agendas (ours, the potential client’s and the facility).  Once the client has visited and has ticked that box as well, he still wants to test our system with his exact dross. Nobody wants to lose their job over this…very conservative group.Sometimes that means the client wants to ship their dross to us for testing. As dross is considered a hazardous material in many if not most jurisdictions, it can be very difficult to arrange shipping of that dross. It requires a lot of planning, documentation, special shipping arrangements for hazardous material, and cost. Other times, the potential client requires us to test an actual Drosrite system on-site in their facility. That requires us shipping a very heavy Drosrite system across the world to their factory, then setting it up, and operating it for a length of time. Which also requires our engineers on site for weeks at a time. As you can imagine, the logistics and planning for that are significant. Often, we will plan the schedule in a way that allows us to conduct on-site Drosrite trials at consecutive client facilities over the course of several months. Once that is all done, funds must be secured, and a final presentation is usually made to their board. If there are no available funds available in the current funding cycle for such a project, it would have to wait to the next funding cycle…oh, and I forgot to mention that all the bits and pieces to get all the boxes ticked also requires funding.  Yes, these are small amounts of funding, and it is often available. Nevertheless, a process must be followed where the funds are requested out-of-budget and a small business case presented for use.  All easy steps but it takes time and small delays add up.


    Having said that, we have been ticking all these boxes with a number of potential clients and, as we have mentioned in the recent past, we do expect several dross orders by year end as a result.

     

    Just a reminder we have a You-Tube video of our Dross system in action here:


    https://www.youtube.com/watch?v=72dPyULE3wc

     

     

    Hope that Helps

    PPP

    1. Dear Mr Pascali 


      Thank you very much for your response to my Drosrite question.  It was very detailed and much appreciated.  I'm sure a lot of people  weren't aware of how time consuming the process  is.



    2. Mr Pascali, this goes into "The more you know" category. I never appreciated how much coordination goes into this "show and tell" process. Going through all that, I suppose there is also that off chance the client can change its mind and tell you they have decided to go a different direction. An example of that might be a loosening of carbon regulations in certain countrie? 


      Thanks for sharing this and putting detailed color on this process.

      1. Wheresjackbenny, I do see your point but I  have a hard time believing someone would change course and switch to something other than Drosrite.  It recovers up to 98% of the alluminum and there's no salt problem to contend with.  Anything they might switch to would cause more problems than it solves.   Just my opinion. 

        1. I don't disagree with the sentiment. It was just one example of what could be a handful of reasons to not followthrough as a client. The overall point was the recognition and appreciation of the process from Pyro's side towards a potential sale.

      2. i imagine that before pyr set up a drosrite at a customers site,an agreement would be in place  that if the drossrite ticked the predetermined boxes ,than the customer would be obligated to buy it,probably under pre agreed conditions,

  2. I'm so glad you expounded on this, Peter.  I'm sure most of us had no idea how many steps were involved in trying to convince a company to replace their legacy systems.  Many people on the different boards complain about how slow things progress.  But this should help them understand all the complexities and effort required.