Skip to content
Sign in

Post

RedStar Gold

You’re reading jokal’s reply in this thread.Jump to it

Prez3.6 rating from 226 members16.1K ptsRate

Worth reading again.... Just ramping up the projects

Redstar Gold awaits drill results from Newman Todd

 

2008-02-26 12:31 ET - News Release

Mr. Doug Fulcher reports

REDSTAR GOLD PROVIDES UPDATES ON NEVADA AND RED LAKE, ONTARIO DRILLING

Redstar Gold Corp. is reviewing the company's exploration programs in Red Lake, Ont., and Nevada. Drill programs are under way on the Newman Todd project in Red Lake and the North Bullfrog property in Nevada, and surface exploration is expected to start in March on the Richmond Summit and Dry Gulch properties on the Carlin trend in Nevada.

Scott Weekes, president of Redstar, states: "We are extremely pleased to have active drill programs in Red Lake and Nevada. Both programs are targeting high-grade, near-surface gold veins within camps that have produced multimillion-ounce gold deposits. We are also excited about starting exploration with our partner Gold Fields on our two Carlin trend properties and look forward to drill programs on these projects later in the year. Redstar has begun what will be its busiest exploration year ever with our Nevada projects being funded by our joint venture partners."

To date five holes have been completed on the company's 100-per-cent-owned Newman Todd property in Red Lake, Ont. The active gold mines within the Red Lake camp are hosted within broad structural corridors defined by quartz veining and broad zones of strong carbonate alteration. Holes at Newman Todd are targeting gold mineralization within a structural corridor defined by brecciation, quartz veining, carbonate alteration and sulphide/magnetite replacement. Previous drilling intersected near-surface values up to 69.02 grams per tonne gold over one metre within a three-metre zone grading 24.84 g/t gold within this breccia corridor. All of the current drill holes have intersected the breccia zone and assays are pending.

Nine holes totalling 2,080 metres have been completed on the North Bullfrog property. International Tower Hill Mines is financing the program and can earn up to a 70-per-cent interest in the project. The current drilling is targeting a high-grade gold vein system that was partially developed by the past-producing Mayflower mine, which was active intermittently from 1905 until about 1941. Recent sampling of quartz veins in outcrop and from mine dumps has returned assays to 1.175 ounces per ton Au (40.3 g/t), with unveined silicified wall rock yielding 0.274 ounce per ton (9.41 g/t). High-grade samples contain fine-grained visible gold. Assay results from the drilling are pending, but preliminary analysis indicates that multiple en echelon veins are present, and this will be used to further refine drill targets. Drilling is also planned to test an area of disseminated gold mineralization in the Sierra Blanca target about 3.5 km north of Mayflower. Previous drilling intersected 0.039 ounce per ton Au over 40 feet (1.34 g/t over 12.2 m) and 0.014 ounce per ton over 150 feet (0.48 g/t over 46 m).

Plans are also under way for surface exploration programs on the company's two Carlin trend properties, Richmond Summit and Dry Gulch, with work financed by Gold Fields, which can earn up to a 70-per-cent interest in the projects. The surface work is planned to begin in March and will include geophysical surveys, alteration mapping, trenching and sampling. Once results are received from the initial surface work, drill programs are planned for both properties.

We seek Safe Harbor.

Join the conversation about RedStar Gold.

Reply

Replies

  1. Redstar Intersects New Bulk Tonnage Gold System in Nevada

    51.8 Metres Grading 2.02 g/t Gold

    08:01 EDT Monday, April 14, 2008

    VANCOUVER, BRITISH COLUMBIA--(Marketwire - April 14, 2008) - Redstar Gold Corp. (TSX VENTURE:RGC) and International Tower Hill Mines are pleased to announce initial results from drilling at the North Bullfrog Project in southwestern Nevada. Drilling on the Mayflower target has returned broad zones with significant gold mineralization, including 51.8 metres grading 2.02 g/t gold (including 9.1 m grading 7.18 g/t) and 29 metres grading 1.70 g/t gold (including 15.2 m grading 2.87 g/t). These two intervals contain high-grade cores of 1.52 m grading 22.90 g/t and 14.20 g/t, respectively.

    Scott Weekes, President of Redstar, stated: "We are very pleased with the results of our first drill program at Mayflower and the initial results indicate the potential to develop a significant, near surface bulk-tonnage resource. A total of six high priority target areas have been identified on the North Bullfrog property and the results to date indicate the potential for the development of a series of deposits within this extensive gold system. At Mayflower, broad, steeply dipping zones of gold mineralization near surface highlight the potential to develop an open pit, bulk tonnage resource. Our partners, International Tower Hill Mines, have taken a very aggressive approach to exploration on the North Bullfrog property and have completed approximately half of the work commitment required to earn their initial 60% interest. Gold Fields has begun work on our two Carlin Trend properties and details of the programs will be announced shortly. The new discovery at North Bullfrog and the joint venture with Gold Fields are important milestones for our Nevada gold exploration goals."

    North Bullfrog 2008 Highlights: ------------------------------------------------------------------ ------------------------------------------------------------------ Hole Number    From (m)          To (m)  Intercept (m)   Gold (g/t) ------------------------------------------------------------------ ------------------------------------------------------------------ NB-08-07          44.2            51.8            7.6         0.80 ------------------------------------------------------------------ ------------------------------------------------------------------ NB-08-09         100.6           103.6            3.0         0.73                ---------------------------------------------------                  112.8           118.9            6.1         0.58 ------------------------------------------------------------------ ------------------------------------------------------------------ NB-08-10          65.5           117.4           51.8         2.02                ---------------------------------------------------  includes         83.8            85.3            1.5         22.9 ------------------------------------------------------------------ ------------------------------------------------------------------ NB-08-11         106.7           109.7            3.1         1.24                ---------------------------------------------------                  111.3           122.0           10.7         0.91                ---------------------------------------------------                  131.1           137.2            6.1         0.79 ------------------------------------------------------------------ ------------------------------------------------------------------ NB-08-12          70.1            77.7            7.6         0.88                ---------------------------------------------------                   83.8           112.8           29.0         1.79                ---------------------------------------------------  includes         97.5            99.1            1.6         14.2 ------------------------------------------------------------------ ------------------------------------------------------------------ NB-08-14         157.0           169.2           12.2         1.06                ---------------------------------------------------                  178.3           204.2           25.9         0.75 ------------------------------------------------------------------ ------------------------------------------------------------------ NB-08-15          77.7           102.1           24.4         0.87 ------------------------------------------------------------------ ------------------------------------------------------------------ NB-08-16          99.1           103.6            4.6         1.53 ------------------------------------------------------------------ ------------------------------------------------------------------ NB-08-17          85.3            99.1           13.8         0.90                ---------------------------------------------------  includes         91.4            96.0            4.6         1.90 ------------------------------------------------------------------ ------------------------------------------------------------------ NB-08-18          89.9           102.1           12.2         1.16 ------------------------------------------------------------------ ------------------------------------------------------------------  

    Dr. Jacob Margolis, U.S. Exploration Manager for Redstar, states: "The excellent results on the Mayflower vein system are certainly demonstrating the potential to yield a new Nevada gold resource. This is only 1 of 6 distinct mineralized areas in the large North Bullfrog project, and we are hopeful that other targets will also yield encouraging results. Preliminary work by our joint-venture partner, ITH, indicates that certain units within the volcanic sequence may be preferential hosts to thicker mineralized zones at Mayflower, and we need to continue to follow these ideas. Once all the data from the drilling program are compiled, we look forward to working with ITH in continuing to advance the Mayflower target."

    The 2008 drilling program completed 8,422 metres of reverse-circulation drilling in 35 holes. Twenty-four holes totaling 5,953 m have been completed at the Mayflower target, with 11 holes completed at the Air Track Hill target about 3.5 km northwest of Mayflower. Assays have been received for the first 12 Mayflower holes (Table 1). Assays when received from Air Track Hill will be reviewed and announced in the near future.

    Results were affected by poor recoveries in a number of holes including holes 7, 8 and 16 that intersected old mine workings and therefore did not test the high grade Mayflower structure. Poor recoveries in hole 11 adjacent to mineralized intervals may have adversely effected the results. The attached section shows the orientation of the drilling and mineralized zone and highlights the near surface open pit potential of the Mayflower system (a high resolution version will be available on Redstar's web site - www.redstargold.com).

    To view the attached section, please click on the following link: http://media3.marketwire.com/docs/rg...

    The results to date demonstrate the potential for development of a bulk tonnage near surface resource along the Mayflower vein system cored by higher grades (greater than 3 g/t) in a stockwork of steeply-dipping quartz-calcite veins with a broad halo of lower-grade replacement zones. Gold mineralization has been traced historically over 700 m of strike and to 200 m below surface and remains open along strike and at depth. The 2008 drilling program tests the Mayflower system over a strike length of 850 m to a maximum depth of 330 m. The bulk of the vein system is tested to only 150 m below surface. Once assays for all 24 holes are received, work will commence on assessing Mayflower's resource potential and advancing an understanding of the geologic controls to grade distribution. ITH is planning additional drilling in 2008 at Mayflower and other district targets.

    The North Bullfrog Project is a joint venture with International Tower Hill Mines Ltd. (ITH) in which ITH can earn up to a 70% interest in the project under terms announced in March, 2007. The Project covers approximately 13.5 square km (5.2 square miles) of unpatented and leased patented claims about 10 km (6 miles) north of the open-pit Bullfrog Mine, where Barrick Gold Corporation recovered about 2.3 Moz of gold from 1989 to 1999.

    The work program at North Bullfrog was designed by Dr. Jacob Margolis, U.S. Exploration Manager for Redstar Gold Corp., and designed and supervised by Dr. Russell Myers, Vice President of Exploration, Talon Gold (US) LLC (a wholly owned subsidiary of ITH responsible for carrying out the Company's exploration programs). Dr. Myers is responsible for the quality control/quality assurance program. Assays reported here are by ALS Chemex, whose quality system complies with the requirements for the International Standards ISO 9001:2000 and ISO 17025:1999. Analytical accuracy and precision are monitored by the analysis of reagent blanks, reference material and replicate samples. Quality control is further assured by the use of international and in-house standards. Finally, representative blind duplicate samples are forwarded to ALS Chemex and an ISO compliant third party laboratory for additional quality control.

    On Behalf of the Board,

    Redstar Gold Corp.

    Doug Fulcher, Director

    The statements made in this Press Release may contain forward-looking statements that may involve a number of risks and uncertainties. Actual events or results could differ materially from the Company's expectations and projections.

    Table 1. Mayflower Assay Results -------------------------------------------------------------------- --------------------------------------------------------------------               From    To   Int     opt    From      To    Int    g/t Hole            ft    ft    ft      Au       m       m      m     Au -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-07       145   170    25   0.023   44.20   51.82   7.62   0.80 --------------------------------------------------------------------                195   210    15   0.009   59.44   64.01   4.57   0.31 --------------------------------------------------------------------                235   255    20   0.009   71.63   77.72   6.09   0.32 --------------------------------------------------------------------                300   315    15   0.012   91.44   96.01   4.57   0.41 -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-08       140   145     5   0.009   42.67   44.20   1.53   0.32 --------------------------------------------------------------------                255   265    10   0.013   77.72   80.77   3.05   0.44 --------------------------------------------------------------------                335   340     5   0.015  102.11  103.63   1.52   0.53 --------------------------------------------------------------------                380   390    10   0.012  115.82  118.87   3.05  0.395 --------------------------------------------------------------------                395   410    15   0.010  120.40  124.97   4.57   0.34 --------------------------------------------------------------------                470   475     5   0.011  143.26  144.78   1.52   0.37 -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-09       315   320     5   0.070   96.01   97.54   1.53   2.40 --------------------------------------------------------------------                330   340    10   0.021  100.58  103.63   3.05   0.73 --------------------------------------------------------------------                355   365    10   0.012  108.20  111.25   3.05   0.43 --------------------------------------------------------------------                370   390    20   0.017  112.78  118.87   6.09   0.58 -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-10       175   180     5   0.022   53.34   54.86   1.52   0.75 --------------------------------------------------------------------                215   385   170   0.059   65.53  117.35  51.82   2.02 --------------------------------------------------------------------  including     275   305    30   0.209   83.82   92.96   9.14   7.18 --------------------------------------------------------------------  including     275   280     5   0.668   83.82   85.34   1.52  22.90 --------------------------------------------------------------------                535   540     5   0.011  163.07  164.59   1.52   0.38 -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-11        30    40    10   0.011    9.14   12.19   3.05   0.36 --------------------------------------------------------------------                 55    60     5   0.011   16.76   18.29   1.53   0.37 --------------------------------------------------------------------                 65    80    15   0.010   19.81   24.38   4.57   0.35 --------------------------------------------------------------------  (i)           290   295     5   0.008   88.39   89.92   1.53   0.26 --------------------------------------------------------------------  (i)           350   360    10   0.036  106.68  109.73   3.05   1.24 --------------------------------------------------------------------  (i)           365   400    35   0.027  111.25  121.92  10.67   0.91 --------------------------------------------------------------------  (i)           405   410     5   0.015  123.44  124.97   1.53   0.51 --------------------------------------------------------------------  (i)           414   425    11   0.021  126.19  129.54   3.35   0.72 --------------------------------------------------------------------  (i)           430   450    20   0.023  131.06  137.16   6.10   0.79 -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-12       135   145    10   0.009   41.15   44.20   3.05   0.31 --------------------------------------------------------------------                160   170    10   0.008   48.77   51.82   3.05   0.29 --------------------------------------------------------------------                175   180     5   0.016   53.34   54.86   1.52   0.55 --------------------------------------------------------------------                195   205    10   0.012   59.44   62.48   3.04   0.39 --------------------------------------------------------------------                230   240    10   0.056   70.10   73.15   3.05   1.90 --------------------------------------------------------------------                250   255     5   0.008   76.20   77.72   1.52   0.26 --------------------------------------------------------------------                265   270     5   0.009   80.77   82.30   1.53   0.31 --------------------------------------------------------------------                275   370    95   0.052   83.82  112.78  28.96   1.79 --------------------------------------------------------------------  including     290   340    50   0.084   88.39  103.63  15.24   2.87 --------------------------------------------------------------------  including     320   325     5   0.414   97.54   99.06   1.52  14.20 --------------------------------------------------------------------                375   390    15   0.009  114.30  118.87   4.57   0.31 -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-13         0     5     5   0.038    0.00    1.52   1.52   1.30 --------------------------------------------------------------------                 10    30    20   0.012    3.05    9.14   6.09   0.43 --------------------------------------------------------------------                900   905     5   0.022  274.32  275.84   1.52   0.77 -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-14       390   395     5   0.011  118.87  120.40   1.53   0.37 --------------------------------------------------------------------                515   555    40   0.031  156.97  169.16  12.19   1.06 --------------------------------------------------------------------                585   670    85   0.022  178.31  204.22  25.91   0.75 --------------------------------------------------------------------                695   700     5   0.012  211.84  213.36   1.52   0.40 -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-15       255   335    80   0.025   77.72  102.11  24.39   0.87 --------------------------------------------------------------------                340   345     5   0.008  103.63  105.16   1.52   0.29 --------------------------------------------------------------------                425   430     5   0.008  129.54  131.06   1.52   0.26 --------------------------------------------------------------------                700   705     5   0.018  213.36  214.88   1.52   0.62 --------------------------------------------------------------------                865   870     5   0.011  263.65  265.18   1.53   0.38 --------------------------------------------------------------------                940   950    10   0.011  286.51  289.56   3.05   0.39 --------------------------------------------------------------------                990   995     5   0.008  301.75  303.28   1.53   0.26 -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-16       130   140    10   0.008   39.62   42.67   3.05   0.28 --------------------------------------------------------------------                145   155    10   0.009   44.20   47.24   3.04   0.30 --------------------------------------------------------------------                205   215    10   0.017   62.48   65.53   3.05   0.58 --------------------------------------------------------------------                225   230     5   0.008   68.58   70.10   1.52   0.28 --------------------------------------------------------------------  (i)           260   265     5   0.012   79.25   80.77   1.52   0.40 --------------------------------------------------------------------                325   340    15   0.045   99.06  103.63   4.57   1.53 -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-17       130   135     5   0.009   39.62   41.15   1.53   0.31 --------------------------------------------------------------------                160   165     5   0.010   48.77   50.29   1.52   0.34 --------------------------------------------------------------------                170   175     5   0.008   51.82   53.34   1.52   0.29 --------------------------------------------------------------------                195   200     5   0.010   59.44   60.96   1.52   0.35 --------------------------------------------------------------------                205   220    15   0.013   62.48   67.06   4.58   0.44 --------------------------------------------------------------------                245   260    15   0.010   74.68   79.25   4.57   0.35 --------------------------------------------------------------------                265   270     5   0.008   80.77   82.30   1.53   0.29 --------------------------------------------------------------------                280   325    45   0.026   85.34   99.06  13.72   0.90 --------------------------------------------------------------------  including     300   315    15   0.055   91.44   96.01   4.57   1.90 --------------------------------------------------------------------                360   365     5   0.013  109.73  111.25   1.52   0.43 --------------------------------------------------------------------                370   380    10   0.014  112.78  115.82   3.04   0.47 -------------------------------------------------------------------- -------------------------------------------------------------------- NB-08-18       255   265    10   0.021   77.72   80.77   3.05   0.73 --------------------------------------------------------------------                295   335    40   0.034   89.92  102.11  12.19   1.16 --------------------------------------------------------------------                355   360     5   0.010  108.20  109.73   1.53   0.34 -------------------------------------------------------------------- --------------------------------------------------------------------  (ii) All Mayflower holes for which assays have been completed;      strict 250 ppb gold (0.250 g/t) cutoff; some assays are      pending for holes NB-08-13 and 29 but are not expected to      significantly change the results listed and will be posted in      a later news release; holes 8, 9 and 16 passed through historic      workings.  Intervals marked with (i) are separated by or adjacent to intervals with no sample recovered, either due to poor recovery or workings; mineralized intervals are not necessarily true widths, but most holes were drilled to cross mineralization at a high angle.  

    FOR FURTHER INFORMATION PLEASE CONTACT:

    Redstar Gold Corp. Tim Mikula 
     News out
    Investor Relations (604) 488-0051 (604) 488-0053 (FAX) Email: [email protected] Website: www.redstargold.com 
    or
    B&D Capital Partners Investor Relations  (604) 685-6465   Website: www.redstargold.com 

    The TSX Venture Exchange has not reviewed this press release and neither approved nor disapproved the information contained in this press release.