  1. Robber, i think that Dale said that it takes 2 months to get results back from a pending hole for inclusion on the 43-101.

    He also mentioned that with these 2 holes, they are going to 'Cutoff the data' from the hinge at that point.

    I would hazzard a guess that we could see it by September/October unless they are further along than 2 months for those holes.

    Andy K

    1. So I was right. They are not including the hinge and not adding it because it is to large in scope. Best to be kept out of the hands of the bigboyz. If they knew what was actually there entirely we would be bought out in no time. It is better to get into a better financial situation and find more locations with high grade. Sounds like a long term plan to me.

      1. While displaying a chart showing projected production through to 2012 he stated (and I have it on tape):

        "You can consider anything that’s higher grade than our average to be an upside to this graph.

        We are working on a 43-101 that incorporates the Hinge zone and the deeper high grade zones and with that there will be a mining plan around that that will give us a different looking production profile.”

        e

        1. I'm just saying that there is no way they can include all the hinge like most people were hoping for. The next 2 drill holes are the cut-off. Then there is all the other drill holes to come out of the hinge that will not be included.

          1. "there is no way they can include all the hinge like most people were hoping for"

            Robber that would apply to all the deposits not just the Hinge. for example the deep ramped zone. we know that all phase 1 drilling will make it in but how much of phase 2 will be in before the cut-off? on the Hinge they will be drilling for years to come just as they will at Sg1,2,3 and Cw and Geb andmany other places because it all goes down very very deep.

            Fortunately when asked by a shareholder about how they decide when to cut-off data to issue the 43-101 Dale answered in detail:

            "That's a good question. There is no magic ... we were drilling something that was adding a lot of ounces very quickly and if we were to put out a 43-101 say that had 2 plus million ounces total and then we in a very short period of time drill off another million without having it incorporated its a big question mark that's out there. So we're basically cutting off our data right shortly here on the Hinge. We've now drilled it or drilled one plain down to 1200 feet and so 1000 feet is a pretty good level to confortably drill into without doing more work because then it starts to get a little more expensive and time consuming drilling deeper holes just to prove up more ounces."

            e

        2. Let's do some calculations to quantify what Dale was implying when he displayed a chart showing projected production through to 2012 and he stated:

          "You can consider anything that’s higher grade than our average to be an upside to this graph. We are working on a 43-101 that incorporates the Hinge zone and the deeper high grade zones and with that there will be a mining plan around that that will give us a different looking production profile.”

          So what could that new mining plan look like?

          Potential 2012 production forcast including Hinge and D-shaft High Grade:

          Ore Source: Ore tons Grade oz/t Contained Ounces

          Rice Lake Deep 100,000 .30 30,000

          Rice Lake d-shaft HG 70,000 1.00 70,000

          Rice Lake A-shaft 100,000 .25 25,000

          SG1 130,000 .15 19,500

          Hinge/Axis #3 140,000 .80 112,000

          Cartwright 60,000 .25 15,000

          TOTALS 600,000 .45 271,500



          e