You’re reading traps7’s reply in this thread.Jump to it

Prez3.6 rating from 60 members2.4K ptsRate

Rice Lake

Everybody is focused on the Hinge but lets not forget Rice Lake's high Grades and massive mineralized area.



Click here for pdf version

Phase 1 Drill Program Review at Rice Lake Deep Outlines Massive Mineralized Area - August 14, 2007

Dale Ginn, CEO of San Gold Corporation (SGR: TSX-V) is pleased to review the completed first phase of drilling below the lowest developed mine workings of the Rice Lake mine. The review of the completed first phase of drilling has revealed numerous new significant veins as well as extended the known veins considerably to depth. The complete set of phase 1 results are tabulated and reviewed below:

Hole # From To Length Gold g/tonne (oz/ton) Vein / Zone

473-06-01 50.9 m 52.7 m 1.8 m (5.9 ft) 9.9 (0.29) New

and 73.2 m 75.8 m 2.6 m (8.5 ft) 10.7 (0.31) New

and 171.1 m 174.8 m 3.7 m (12.1 ft) 12.8 (0.37) 96

473-06-02 52.9 m 54.6 m 2.1 m (6.9 ft) 5.2 (0.15) New

and 62.4 m 65.7 m 3.3 m (10.8 ft) 5.5 (0.16) 96

473-06-03 39.6 m 43.0 m 3.4 m (11.2 ft) 7.6 (0.22) A

and 48.5 m 50.0 m 1.5 m (4.9 ft) 11.4 (0.33) A

and 144.4 m 148.5 m 4.1 m (13.5 ft) 7.3 (0.21) 96

473-06-04 22.8 m 30.6 m 7.8 m (25.6 ft) 21.6 (0.63) A

473-06-05 8.9 m 9.9 m 1.0 m (3.3 ft) 20.6 (0.60) C

473-06-06 5.3 m 7.2 m 1.9 m (6.2 ft) 14.1 (0.41) C

473-06-07 6.4 m 8.2 m 1.8 m (5.9 ft) 9.3 (0.27) C

473-06-08 6.4 m 9.0 m 2.6 m (8.5 ft) 5.5 (0.16) C

473-06-09 7.6 m 9.5 m 1.9 m (6.2 ft) 15.8 (0.46) C

473-06-10 60.6 m 64.8 m 4.2 m (13.8 ft) 8.6 (0.25) A

and 84.2 m 86.9 m 2.7 m (8.9 ft) 11.0 (0.32) 96

473-06-12 12.0 m 13.6 m 1.6 m (5.3 ft) 24.7 (0.72) A

473-06-13 40.2 m 42.3 m 2.1 m (6.9 ft) 13.7 (0.40) A

473-06-14 28.3 m 31.9 m 3.6 m (11.8 ft) 11.7 (0.34) New

and 41.7 m 45.4 m 3.7 m (12.2 ft) 6.5 (0.19) New

473-06-15 21.5 m 25.3 m 3.8 m (12.5 ft) 11.3 (0.33) New

473-06-16 76.9 m 78.0 m 1.1 m (3.6 ft) 13.4 (0.39) New

and 98.4 m 105.3 m 6.9 m (22.6 ft) 11.7 (0.34) New

473-06-17 16.6 m 19.6 m 3.0 m (9.8 ft) 5.1 (0.15) New

and 23.3 m 27.4 m 4.1m (13.5 ft) 10.0 (0.29) New

and 31.0 m 32.3 m 1.3m (4.3 ft) 10.0 (0.29) New

and 35.1 m 39.0 m 3.9m (12.8 ft) 6.9 (0.20) New

473-06-18 28.6 m 31.0 m 2.4m (8.0 ft) 24.0 (0.70) A

and 37.9 m 42.1 m 4.2m (13.8 ft) 11.3 (0.33) A

including 41.4 m 41.7 m 0.3m (1.0 ft) 125.4 (3.66) A

and 63.0 m 67.1 m 4.1m (13.5 ft) 7.6 (0.22) 96

and 68.2 m 72.9 m 4.7m (15.5 ft) 13.7 (0.40) 96

473-06-19 16.4 m 17.2 m 0.8 m (2.6 ft) 20.6 (0.60) A

473-06-20A 20.3 m 22.3 m 2.0 m (6.6 ft) 14.7 (0.43) C

473-06-20B 15.4 m 18.8 m 3.4 m (11.2 ft) 8.6 (0.25) C

473-06-21 16.2 m 18.8 m 2.6 m (8.6 ft) 29.1 (0.85) A

including 18.1 m 18.8 m 0.7 m (2.3 ft) 90.1 (2.63) A

473-06-23B 38.1 m 42.7 m 4.6 m (15.1 ft) 5.8 (0.17) A

473-06-24 12.1 m 18.0 m 5.9 m (19.4 ft) 6.9 (0.20) A

and 28.1 m 34.3 m 6.2m (20.3 ft) 5.1 (0.15) A

and 37.3 m 40.4 m 3.1m (10.2 ft) 6.2 (0.18) A

and 49.8 m 52.7 m 2.9m (9.5 ft) 11.4 (0.33) 96

473-06-25 15.0 m 45.3 m 30.3 m (99.4 ft) 12.4 (0.36) A

and 58.0 m 60.1 m 2.1 m (6.9 ft) 12.0 (0.35) 96

473-06-26 72.0 m 78.8 m 6.8 m (22.3 ft) 50.1 (1.46) 96

473-07-27 128.3 m 133.0 m 4.6 m (15.2 ft) 18.0 (0.53) 96

within 127.1 m 133.6 m 6.5 m (21.4 ft) 14.6 (0.43) 96

and 50.0 m 51.8 m 1.8m (5.9 ft) 14.8 (0.43) A

and 68.5 m 78.2 m 9.7m (32.0 ft) 5.8 (0.17) New

and 100.3 m 102.7 m 2.4m (8.0 ft) 5.9 (0.17) New

and 105.0 m 109.9 m 4.9m (16.1 ft) 11.2 (0.33) New

and 116.1 m 118.2 m 2.1m (6.9 ft) 10.1 (0.30) New

HM-06-01 89.9 m 95.9 m 6.0 m (19.7 ft) 17.8 (0.52) C

HM-06-02 101.3 m 104.1 m 2.8 m (9.2 ft) 17.9 (0.52) C

HM-06-03 3.0 m 8.5 m 5.5 m (18.0 ft) 12.2 (0.36) A

HM-06-04 40.4 m 46.8 m 6.4 m (21.0 ft) 8.6 (0.25) A

and 84.6 m 89.6 m 5.0 m (16.4 ft) 14.8 (0.43) 96

HM-06-05 63.7 m 72.9 m 9.2 m (30.2 ft) 6.0 (0.18) 96

473-06-110 44.8 m 48.2 m 3.4 m (11.1 ft) 5.0 (0.15) New

And 55.2 m 66.0 m 10.8 m (35.4 ft) 7.2 (0.21) A

And 81.9 m 86.9 m 5.0 m (16.4 ft) 8.3 (0.24) 96

473-06-113 35.6 m 44.1 m 8.5 m (27.9 ft) 7.6 (0.22) A

Note: The “06” part of the hole designation refers to 2006, the year the hole was planned.

During the phase 1 program, 33 holes were completed with 63 gold intersections of significant value recorded. Drilling targeted the down dip/plunge area of the main vein sets that were mined by the previous operators of the mine during the years 1999 to 2001 and 1932 to 1968. This area has rough dimensions of 700 feet by 400 feet within the host diabase or SAM unit and contains the most prominent vein sets named the “96”, “A”, “C” as well as others. Phase 1 drilling intersected these veins up to 500 feet below the 4730 Level, the lowest of the developed levels of the mine. All of the above listed veins remain open at depth where subsequent phases of drilling will continue to define and extend from the currently advancing decline access.

The 96 vein has a strike length of 600 to 700 feet, is tabular in nature and has an average dip of 70 degrees. Phase 1 drilling returned 13 intersections with widths of 9 feet to 30 feet and grades that varied from a low of 0.16 oz/ton to 1.46 oz/ton.


The A vein strikes roughly perpendicular to the 96 vein and is classified as a stockwork or breccia type of vein. The dip of the A vein is near vertical, widths are variable and can be quite massive where intersected by other veins, most notably the 96 vein as in the case of hole #25. Phase 1 drilling returned 19 intersections with widths of 3 feet to 100 feet and grades that ranged from a low of 0.15 oz/ton to 0.85 oz/ton. The 96 vein and A vein are currently being developed on two levels at the 5400 foot and 5450 foot by jumbo crews in preparation for mining.

The C vein is located 400 feet east of the 96 vein which is parallel and has similar characteristics. The strike length is 400 to 500 feet and the dip averages 65 degrees. Phase 1 drilling returned 9 intersections with widths of 3 feet to 20 feet and grades that ranged from a low of 0.16 oz/ton to 0.60 oz/ton.

Of great significance is the number and size of new veins discovered during this phase of drilling. 17 intersections were classified as new discoveries with widths that varied between 4 feet and 32 feet and grades that ranged from 0.15 oz/ton and 0.39 oz/ton. The majority of these intersections are located between the 96 and the C vein and are interpreted to be stockwork veins that are parallel to and similar to the A vein. The tonnage factor for Rice Lake mine veining is 11.5 cubic feet per ton (ACA Howe, 2007).

The Phase 1 drill program at Rice Lake Deep has generated strategically significant results that will completely transform the nature of mining at the Rice Lake mine. Previously, since 1932, mining occurred in relatively high-grade and narrow vein deposits using classic shrinkage methods of mining. The exceptional widths and grades encountered with this round of drilling are suitable for more efficient and mechanized mining methods which will be employed in this area by San Gold. This will occur in combination with classic shrinkage mining methods employed in the extreme high grade veins located approximately 1000 feet above this area. The new Phase 1 results, to be succeeded by the Phase 2 program currently underway, have redefined the deep mine area as a very high grade and massive tonnage environment. The updated resource and mine plan study that is currently underway will further quantify the economic significance of the recent Rice Lake Deep discoveries.

Please see the San Gold website (www.sangoldcorp.com) for plan and section diagrams relevant to the areas drilled.

This program was carried out under the supervision of D. Ginn, P.Geo., the Qualified Person for this project under National Instrument 43-101. The drill core was split, with half sent to TSL Laboratories in Saskatoon, SK and fire assayed with an AA and gravimetric finish. Whole metallics were performed on selected samples. Check assays were also performed on pulps and rejects by both TSL and by Accurassay Laboratories of Thunder Bay, ON. The core lengths are actual lengths as drilled and have not been adjusted for the true width of the mineralized zones.

For further information contact Dale Ginn, CEO of San Gold Corporation, at (204) 794-5818 or investor information at 1-800-321-8564 or visit www.sangoldcorp.com.

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

PRIVACY POLICY | TERMS OF SERVICE | COPYRIGHT 2006 SANGOLD CORPORATION INC. ALL RIGHTS RESERVED

ody is focused on the Hinge but lets not forget Rice Lake High Grades

Join the conversation about San Gold Corporation.

Reply

Replies

  1. Danno, that's the ore they are currently milling. We can expect better grades from the mill this year. Add in the hinge and they will be exceptional. Remember what Dale said in the video!

    1. I know that there presently mining it.I was just stating that the ore at Rice lake has also very good grades.The only difference it's deep.Just giving some info for the new people on board.

    2. Hotmuck, with all that water from Fargo heading towards Winnipeg , i sure hope San got our grounding problems corrected. I don't no if that hoist could take another hit. I sure hope some one, checked the resistor banks for open circuits. I was just trying to think back to the video, Dale said one or two 5 to 10 milliom oz finds, I like what Hugh said, possibly the most consistant grading !. long on the greens, Traps7

      1. Will be nice when we get the new variable frequency A/C motor and drive installed. Most likely will do the hoist and crushers at the same time. I believe most of the controls are ready to be hooked up.

        1. Hotmuck, i am just thinking out loud here, but if we are gearing up to run the Mill on a weekly bases, then i sure hope we have a significant stock pile of the high grade Hinge ore. My understanding was , SG1 had a high strip ratio ( under .09 g ) and the Cartwright is months away from developement. I see the hinge as the only source of ORE once they decide to change the main hoist, as we lose this capacity. I can see an extented time frame to change this freqency drive , as the programing of the unit starts after the mechanical instalation. I think back when dealing with the varibles in writing and programing drives, and in hoisting up 1900 tons , the time to ramp up of the drive and the stretching of the cable is a tricky problem, I HAVE NEVER BEEN TO THE COMPLEX , just talking out loud, but things never go as pland in the mining industry, lets change this hiost now, before gearing up to full production , and show consecutive cash flow increases. Long on the greens Traps7

          1. Can't see it taking any more than a week to 10 days. The controller and wiring can be pre-installed adjacent to existing controller, so if they engineered it correctly the new motor will have the same base mount and shaft coupling. Hooking up motor wiring and programing drive will not be a huge deal. I've seen programming and adjusting VFD on 300 Hp gearless motor done in an afternoon. This a basic system, just changing motor from Direct current to variable frequency Alternating current whcih is less susceptible to power surges and lightning strikes. Also cheaper to run. Cable stretch ishould not be a factor in this case as cable is not replaced or removed.

            1. Replying to @Hotmuck

              When they upgrade a system like the hoist everything has to be pre- enginneered.Hotmuck is right everything like the wiring and controller can be done beforehand.Installation and allignment of new motor and all the cooling duct work should not take more then 3 to 4 days if they have two crews of 12 hours shift .Programming should take a day and checking all the limits on the skip and cage same day.

              1. Replying to @Danno13

                Correction, drive is DC, so motor will not be replaced, merely installing solid state DC drive which will require very little down time for hoist.