Skip to content
Sign in

Post

San Gold Corporation

You’re reading traps7’s reply in this thread.Jump to it

VEEP3.2 rating from 40 members2.5K ptsRate

Summary of Hinge Drill Results

Date(newsrelease) ZONE Drill Hole # Grams Oz Depth Depth Length Length
3.3 Mtrs Ft Mtrs Ft
Oct 15,07 30-07-04 9.9 0.29 23.4 77.22 2.4 7.92
Hinge 30-07-11 14.1 0.41 28.9 95.37 2.9 9.57
30-07-12 113.1 3.30 31.2 102.96 1.5 4.95
Jan 15,08 Upper GS-07-15U 18.5 0.55 56 184.8 1.5 4.95
Hinge GS-07-16U 30.2 0.90 48.7 160.71 1 3.3
GS-07-17U 11.4 0.34 63 207.9 2.4 7.92
GS-07-18U 23.2 0.69 69.3 228.69 2.5 8.25
GS-07-19UA 7.1 0.21 80 264 5.3 17.49
GS-07-19UB 4.5 0.13 82.2 271.26 3.1 10.23
Lower GS-07-15L 18.5 0.55 248.2 819.06 1 3.3
GS-O7-18L 26 0.77 255.3 842.49 1 3.3
Feb 19,08 Upper GS-07-28UA 9.7 0.29 132.5 437.25 1.7 5.61
Hinge GS-07-28UB 13.1 0.39 158.6 523.38 1 3.3
Lower GS-07-28LA 9.7 0.29 319.9 1055.67 1.6 5.28
GS-07-28LB 4.7 0.14 324.1 1069.53 2.3 7.59
GS-07-28LC 20.1 0.62 330.4 1090.32 2.3 7.59
GS-07-28LD 7.4 0.22 346.2 1142.46 4.9 16.17
April 21,08 GS-08-15 7.5 0.22 136.2 449.46 4.4 14.52
Hinge # 4 GS-08-17A 60.6 1.77 149.9 494.67 1.6 5.28
GS-08-17B 4.08 0.14 210 693 7 23.1
GS-08-17C 5.8 0.17 315.8 1042.14 2.9 9.57
GS-08-19 9.9 0.29 347.5 1146.75 1.8 5.94
May 21,08 Hinge # 4 GS-08-33 85.1 2.49 109.1 360.03 6.3 20.79
May 28,08 GS-08-29A 56.7 1.66 98.6 325.38 4 13.2
Hinge # 4 GS-08-29B 42.5 1.24 105.5 348.15 1.8 5.94
GS-08-31A 21.2 0.62 99 326.7 5.4 17.82
GS-08-31B 47.6 0.62 110.7 365.31 1.6 5.28
June 10,08 GS-08-25A 28.1 0.82 152.6 503.58 9.4 31.02
Hinge # 4 GS-08-25B 79 2.31 159 524.7 3 9.9
June 18,08Hinge GS-08-37 16.8 0.49 383.3 1264.89 16.6 54.78
July 30,08 GS-08-45 19.9 0.58 105.7 348.81 3.9 12.87
Hinge # 4 GS-08-49 12 0.35 243.4 800.79 5.4 17.82
GS-08-53 19.2 0.56 272.7 897.18 3.4 11.22
GS-08-55 9.9 0.29 201.2 661.95 6.5 21.45
Sept 15,08 Deep 498-08-07 51.4 1.50 1500 4935 2.7 8.91
Hinge Deep 498-08-02 5.2 0.15 1500 4935 4.1 13.49
Deep 498-08-01 8 0.23 1500 4935 2.3 7.57
East 498-08-02 41.8 1.22 1500 4935 1.4 4.61
498-08-03 21.6 0.63 1500 4935 1.8 5.92
Oct7,08 Hinge#4 GS-08-74 30.5 0.89 166.4 547.46 6 19.74
Oct 22,08 GS-08-76 141.8 4.14 122.2 402.04 2 6.58
Hinge # 4 GS-08-75 59.6 1.74 256.4 843.56 1.4 4.61
GS-08-71 8.9 0.26 308.2 1013.98 2.3 7.57
GS-08-65 13.4 0.39 223.4 734.99 2.5 8.23
Feb 19,09 Expl GS-08-96 13 0.38 330.7 1088 3.1 10.2
Hinge # 4 Holes GS-08-101A 12.3 0.36 146 480.34 3 9.87
GS-08-101B 38.7 1.13 205.1 674.78 0.3 0.99
GS-08-103 14.7 0.43 150 493.5 2 6.58
GS-08-107A 66.5 0.43 174.5 574.11 1.4 4.61
GS-08-107b 11.3 0.33 196.8 647.47 4.4 14.48
Defin GS-09-13 11.3 0.33 136.9 450.4 3.3 10.86
Holes GS-09-15 40.2 1.18 106.9 351.7 3.4 11.19
GS-09-17 31.3 0.91 105.6 347.42 2.1 6.91
GS-09-25 6.2 0.18 170.3 560.29 2.7 8.88
GS-09-27 28.1 0.82 124 407.96 8.2 26.98
GS-09-29 133.9 3.91 141.3 464.88 1.3 4.28
March 19,09 GS-09-31A 69.2 2.02 154.5 508.31 1.6 5.26
Hinge # 4 GS-09-31B 10.2 0.30 216.9 713.6 2.1 6.91
GS-09-33 6.6 0.19 100.9 331.96 3.6 11.84
GS-09-35A 82.2 2.40 123.3 405.66 2.2 7.24
GS-09-35B 25.2 0.74 134.9 443.82 3 9.87
GS-09-37 5.5 0.16 129.5 426.06 2.5 8.23
GS-09-39 47.6 1.39 125.5 412.9 2.1 6.91
GS-09-41 16.6 0.49 134.4 442.18 4.6 15.13
GS-09-44A 42.8 1.25 120.8 397.43 4.4 14.48
GS-09-44B 7.1 0.21 133.8 440.2 1.8 5.92
GS-09-48A 36.2 1.06 104.5 343.81 2.6 8.55
GS-09-48B 8.03 0.23 112.5 370.13 2.1 6.91
GS-09-48C 12.8 0.37 118.1 388.55 1 3.29
GS-09-50A 55 1.61 108.1 355.65 2.9 9.54
GS-09-50B 5.5 0.16 123.4 405.99 4.7 15.46
Apr14,09 Hinge#4 West GS-09-63 207.1 6.05 169.3 557 2.3 7.57
April 20,09 GS-09-23 30.1 0.88 155.7 512.25 2 6.58
Hinge # 4 GS-09-43 7.2 0.21 138.4 455.34 3.6 11.84
GS-09-45 6.1 0.18 143 470.47 2.9 9.54
GS-09-46 25.2 0.74 100.2 329.66 2.2 7.24
GS-09-48A 36.2 1.06 104.5 343.81 2.6 8.55
GS-09-48B 6.9 0.20 112.6 370.45 2.8 9.21
GS-09-49 13.5 0.39 128.7 423.42 5.3 17.44
GS-09-52 8.1 0.24 98.5 324.07 1.4 4.61
GS-09-53A 17.3 0.50 145.3 478.04 2.7 8.88
GS-09-53B 8.7 0.25 195.2 642.21 1.2 3.95
GS-09-54 50.6 1.48 98.9 325.38 2.2 7.24
GS-09-56 6.9 0.20 103.5 340.52 1.4 4.61
GS-09-57A 11.6 0.34 139.8 459.94 2.7 8.88
GS-09-57B 27.2 0.79 152.2 500.74 1.3 4.28
GS-09-57C 7.8 0.23 197.5 649.78 2.9 9.54
GS-09-58 82 2.40 109.7 360.91 2.1 6.91
GS-09-60 54.7 1.60 118 388.22 3 9.87
GS-09-62 21 0.61 99.9 328.67 1.2 3.95
GS-09-65 10.3 0.30 176.9 582 6.4 21.06
May 28,09 GS-09-77A 13.7 0.40 150 493.5 5.2 17.11
Hinge # 4 GS-09-77B 30.1 0.88 150 493.5 2.1 6.91
GS-09-76 18.5 0.54 150 493.5 3.9 12.83
GS-09-75 34.6 1.01 150 493.5 2.4 7.9
GS-09-73 12.3 0.36 150 493.5 2.2 7.24
June 11,09 LM-09-22 25.4 0.74 100.6 330.97 2.1 6.91
Cohiba LM-09-16 14.1 0.41 115.7 380.65 2 6.58
LM-09-14 21.4 0.63 110 361.9 2 6.58
LM-09-06 4.1 0.12 113.8 374.4 1.7 5.59
LM-09-02 13.7 0.40 99.6 327.68 1.1 3.62
July 30,09 GS-09-022 8.6 0.03 489.7 1611.11 7.6 25
Sept 9,09 LM-09-18 3.8 0.11 127.4 419.15 3.2 10.53
Cohiba LM-09-19A 7.9 0.23 113.2 372.43 2.5 8.23
LM-09-19B 8.6 0.25 195.3 642.54 1.3 4.28
LM-09-20 13.4 0.39 93 305.97 2.4 7.9
LM-09-28 29.2 0.85 101.1 332.62 2.2 7.24
LM-09-29 4.5 0.13 151.2 497.45 2.1 6.91
LM-09-30 62.7 1.83 104.7 344.46 1.1 3.62
LM-09-32 9.6 0.28 110.3 362.89 2.8 9.21
LM-09-40A 11.3 0.33 109.9 361.57 4.7 15.46
LM-09-40B 6.2 0.18 227.4 748.15 1.8 5.92
LM-09-41 12.3 0.36 235.5 774.8 2.4 7.9
November 6,09 Decline Collar 0 0
L-13 Upper KL-09-14 13 0.38 133.2 438.23 1 3.29
#1 KL-09-15 3.4 0.10 147.6 485.6 2.1 6.91
KL-09-16 4.1 0.12 126.6 416.51 0.7 2.3
KL-09-17 2.7 0.08 141.4 465.21 1.6 5.26
KL-09-19 5.5 0.16 198.3 652.41 1 3.29
Lower KL-09-20 10.6 0.31 234.3 770.85 2.7 8.88
#2 KL-09-21 6.8 0.20 261.3 859.68 1.5 4.94
KL-09-22 5.1 0.15 224.6 738.93 6.1 20.07
KL-09-27 92.8 2.71 232.5 764.93 0.3 0.99
KL-09-28 22.9 0.67 171.9 565.55 1.6 5.26
KL-09-29 44.9 1.31 281.1 924.82 3.1 10.2
KL-09-42 19.2 0.56 241.1 793.22 2.3 7.57
Lower GC-09-005 4.1 0.12 343.3 1129.46 1.2 3.95
#3 GC-09-006 13 0.38 358.8 1180.45 2.7 8.88

Join the conversation about San Gold Corporation.

Reply

Replies

  1. ...ideally when looking at drill results one will scan at the grams over the drill widths. Under ground mining to be profitable requires 7 gr over 5 to 6 ft widths which allows for ideal mining which allows for a low strip ratio ( waste ore ) and cuts cost per oz. I see on hinge # 4 a continuos vein running with high grade and wide widths and the cobina and l13 not far behind. Looking at the core from the deeps are also fantastic but require more man handling to get the ore to surface hence the added cost per oz for mining. Open pit mining requires 3 to 5 gr but you require continuos grades through out the ore body and in Canada the average open pit cost is around $ 450. an oz where as Sans hinges will produce for under $ 200 an oz and $ 350. FOR THE DEEPS. I see San in a couple yrs out mining more from our hinges and less from the deep as we keep finding more hinges and once the mill raises its capacity we should also have more development into these stopes to draw ore from. I see yrs out a whole net work of near surface drifts suppling our riches as San just has to much gold and to little man power. Long On The Greens Traps7

    1. CUPP Property

      The CUPP Property is located south of Rice Lake, about 4 km south of the gold mining town of Bissett, Manitoba, and 3.4 km south of San Gold Corporation's ...
      www.tiberiusgold.com/html/cupp_property.html - Cached - Similar.....once you open this report, scroll down and highlite the technical report which takes a minute to download then scroll through to the different maps,gives different mines in the area. Traps7
      1. Swiss cheese comes to mind. There is a lot of holes. How much would it cost a small company to do something like that. Too much comes to mind.