...from my arm chair

..thinking about what"s happening at Rice Lake, we were told San had 20 stopes fully maned ready to go .Thinking out loud here then, we were also told the heavy development completed allows the heavy equipment to drive freely around the near surface mine. San running mining crews on 10 hr shifts could mine one stopping area in a two shift day. San could long hole a 12x12x 8 foot wd = 1152 cu ft divded 11.5 cubic ft = 100 tns. This would take 4 hrs and the blast would be set and triggerd at the end of shift with the next crew removing the ore and driving it back to a crusher. This 100 tns x .3 oz = 30 oz for one stope so x 20 stopes we should see 20 x 30 = 600 oz in a days work. Looking now that the development ore that was sitting at the mill should have been cleaned up by now , San should be producing near 600 oz if there are mining 8 ft wds in one 24 hr . Sans bulk samples tell us that .3 oz was milled so investors should see alot more oz then San told us. San mining 10 foot or 12 ft wds could either add to the oz if consistant grading or lower if the strip ratio increases. Either way this bulk sample area ( 007, emporer, hinge, cohibia, lio,ll13 should boost Sans Production up along with cost coming down because of the added oz and now development low grade is out of the way. PS San can Mill 1800 tns a day x .3 oz = 540 oz.x 80 days operation = 43000 oz in a qtr.Long On The Greens Traps7

Join the conversation about San Gold Corporation.

Reply

Replies

  1. The 2009 bulk sample milling at Hinge recovered 16,052 ounces of gold. Assuming 93% mill recovery, 95% mine

    recovery, and 20% dilution the bulk sample equates to an in-situ resource of 45,000 tonnes grading 0.38 ounces per ton.

    This reconciles well with the average grade of the Hinge uncapped measured plus indicated resources. Further, monthly

    average grade fed to the mill (based on hourly mill belt samples) ranged from 0.25 to 0.64 ounces per ton, which

    indicates the variability of average grades over an area approximately 400 feet high by 700 feet along strike.

    Reconciliation of Company’s diluted, recoverable reserve estimates based on assay data, underground face samples, and

    mill belt samples indicate that the sampling and assaying protocols are providing good quality data.

    GEOE

    X

    LIMITED

    San Gold Rice Lake Project, October 2010 Page 6

    The Company monitors the QAQC information for the assaying process on a regular basis (standards and blanks sent to

    assay laboratories and the duplicates and replicates done by the laboratories). The Author has reviewed this information

    and found no serious discrepancies that had not been recognized and dealt with by the Company geologists.

    The mineral resources are defined in terms of NI 43-101 regulations and their estimation was carried out using industry

    standard polygonal longitudinal section methodology. The drill hole data was evaluated in plan and section in three

    dimensional AutoCAD to determine continuity between holes. Vein structures in the RLM area have vertical extents

    from 4 to 8 times their strike length. Because of this, areas of influence used around drill hole pierce points on the

    longitudinal section for purposes of defining measured and indicated resources are ellipses, elongate down dip. For

    measured resources an ellipse with short axis of 50 feet and long axis of 100 feet was used; and for indicated resources

    an ellipse with short axis 75 feet and long axis 150 feet was used.

    The Company’s production department uses Amine software for reserve estimation and mine planning. Amine is a 3D

    AutoCAD based system that uses block modelling to determine reserve and resource estimates. The Author has crosschecked

    the Amine methodology versus his polygonal longitudinal section methodology and has found no material

    differences between the results of the two methodologies. Amine uses 3D modelling to determine volumetric

    information for resources and beyond that step, the same tonnage factors are used to determine the tonnages. For

    reserve estimation, the Author used the minimum mining width, recovery, and metal price criteria that are currently

    used by the Production department. Cut-off grades were based upon current mining costs as presented in the economic

    assessment of the Project.

    The key assumptions used by the Author for conversion of measured and indicated resources to proven and probable

    reserves are:

    1) Resource tonnage factor 11.4 cubic feet per ton (equivalent to an average specific gravity of 2.8)

    2) Minimum mining width 5 feet horizontal.

    3) Mill Call Factor 95%

    4) Mill Gold Recovery 93%

    5) Gold price US$1200, Canadian$1260 at 1.05 exchange rate.

    6) External cut-off grade 0.13 ounces per ton (based upon total operating costs of $165/ton and taking

    into account mill gold recovery and the assumed price of gold).

    7) Internal cut-off grade 0.10 ounces per ton (based upon total mining costs (ore delivered to mill) of

    $123/ton and taking into account mill gold recovery and the assumed price of gold)..

    The Author concludes that the work completed to date on the Property has demonstrated the presence of significant gold

    reserves and resources that warrant additional surface and underground exploration and development programs with the

    objective to confirm the geometry and continuity of the vein structures and to confirm sufficient measured and indicated

    mineral resources to warrant completion of internal feasibility studies.

    The economic assessment contained in this Report indicates that the Rice Lake Project is economically viable. The

    following is a summary of key economic results.

    SUMMARY OF KEY ECONOMIC RESULTS

    (Canadian dollars unless indicated otherwise)

    Life of Mine (“LOM”) 5.5 years

    LOM Tons Mined 1,908,812

    LOM Ounces Gold Produced 618,515

    LOM Average Assumed Gold Price US$ 1200

    LOM Average Breakeven Gold Price US$ 575

    Total Revenue $778,898,235

    Total Operating Costs $315,485,383

    Cashflow from Operations (EBITDA) $463,412,852

    Capital Costs $ 56,807,000

    Cash Surplus before taxes $406,605,852

    The economic assessment includes only measured and indicated resources, however, all of the development capital

    required to convert the inferred resources to reserves and develop those resources has been included in the economic

    assessment.

    GEOE

    X

    LIMITED

    San Gold Rice Lake Project, October 2010 Page 7

    Over a 5.5-year mine-life the project will generate $407 million cash surplus before taxes and cashflow from operations

    (EBITDA) of $463 million (average EBITDA approximately $84 million per year). The breakeven life-of-mine gold

    price is US$575 to allow for recovery of ongoing development capital expenses.

    The project has positive cash flow from operations at gold prices in excess of US$575.

    In Geoex’s opinion, given the current inventory of approximately 3.7 million tons of inferred resources and the long

    operating history of the Rice Lake Project, it is probable that sufficient inferred resources will be converted to resources

    to achieve a minimum of 10 years of mine life.

    NI 43-101 Cautionary Note - Mineral resources that are not mineral reserves do not have demonstrated economic

    viability and there is no certainty that the results of the economic assessment will be realized.

    The capital development allocated in the model is sufficient to fund conversion of inferred resources to reserves and as

    well has the capability to potentially add additional inferred resources to the current indicated resource inventory.

    The Author concludes that the work completed to date on the Property has demonstrated the presence of significant gold

    reserves that should, subject to the various economic risks of variation in gold prices, operating costs, and other

    unforeseen economic factors, provide at least 7 years of mill feed at an average production rate of 400,000 tons milled

    per year. The Property warrants additional surface and underground exploration and development programs with the

    objective to confirm the geometry and continuity of the vein structures and to confirm sufficient measured and indicated

    mineral resources to warrant completion of internal feasibility studies on new stoping areas and future discoveries.

    The Author recommends the following:

    1. The Company should continue funding an aggressive exploration program in the Rice Lake Area.

    2. The Company should create a 3D model of the major shear structures and resource areas on the property to

    provide a tool for use by its Exploration and Production Geologists as well as for use with third parties who

    have an interest in the Property.

    3. The Company should initiate underground bulk sampling programs on the L10, L13, and Cohiba exploration

    targets.

    4. As this Report will be made public it is inappropriate for the Author to provide other specific recommendations

    relative to ongoing exploration concepts and targets.

    1. They have reported to have found good grades but the question on everyones mind is when are they going to use them. The hinge sample was 2009. So far they have not come out and said anything about when these higher grades will be put into production. Lets hope it is soon.

      1. Ttgr, investing in the mining sector is pure risk, but numbers speak for themselves. I don"t see how anyone could disputed these bulk sample numbers from the lower hinge. Remember ( please correct ) the chip samples are only 46 % of the distance.........this tonage well feed the Mill quite load....

        March 4, 2011

        For further information, contact: Investor Relations 1-800-321-8564 Neither the Toronto Stock Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Toronto Stock Exchange) accepts responsibility for the adequacy or accuracy of this release.

        Bissett, MB

        TSX:SGR || OTCQX:SGRCF

        www.sangold.ca

        San Gold Confirms High Grades with Bulk Sample of 007 Zone

        George Pirie, CEO of San Gold Corporation (TSX:SGR) (OTCQX: SGRCF), is pleased to report on preliminary mine development and bulk sampling within the 007 and 007 East Zones from 250 meters (820 ft) below surface.

        Over 305 meters (1,000 ft) of strike length has been developed so far at this elevation with three distinct zones identified having strike lengths of 76 meters (250 ft) to 92 meters (300 ft) each. 15,405 tons have been processed in the Rice Lake mill so far this year from the 007 zones giving a mill head grade of 11.3 g/tonne (0.33 oz/ton).

        Mining of the 007 zones have contributed to a record month in terms of tonnage mined in February of 37,825 tons or 1,351 tons per day average, including a new daily mined record of 2,674 tons. Individual face grades have assayed up to 11.2 oz/ton (384 g/tonne) over a true width of 3.4 meters (11.0 ft) with visible gold being routinely observed throughout. Chip sample results are presented in the table below using vein only as well as full face widths in order to fully account for dilution. Chip sample face averages are also presented by zone using uncut assay values and a 103 g/tonne (3 oz/ton) cutting factor for all individual assays that lie over that threshold.

        Zone Vein Width Vein Grade (g/tonne) Face Width Face Grade (g/tonne) Strike Length

        (meters) uncut cut (meters) uncut cut (meters)

        730 3.1 42.8 26.1 4.6 29.5 18.2 76.2

        (007 East)

        720 1.9 29.1 14.1 3.5 17.1 8.2 91.5

        (007 mid)

        700 1.5 60.3 24.3 3.4 27.4 11.6 76.2

        (007 main)

        Average 2.2 43.1 21.0 3.8 24.2 12.0

        Ninety-two development faces were chip sampled resulting in a total of 458 samples assayed for gold with individual values ranging from 0.34 g/tonne (0.01 oz/ton) to 1,163 g/tonne (33.96 oz/ton). Level development continues in both the east and west directions as well as in numerous vein offshoots while incline and decline development is ongoing in order to access the zones at levels above and below the 250 meter (820 foot) level. Drilling from underground and surface continues over 100 meters to the east of this development along strike from the 007 East Zone and down dip from the Emperor Zone.

        The 007 East Zone, as well as the 007, L10 and Emperor Zones all occur near to or within a mafic flow rock unit known as the Shoreline Basalt, striking roughly east-west, parallel to and stratigraphically above the Rice Lake Mine or SAM unit. More precisely, the close association of the 007 and recently discovered eastward extensions with the Shoreline Basalt has produced gold deposits that are more planar or regular in shape than the overlying Hinge type deposits. All of the Shoreline Basalt zones are located proximal to a series of identified shears and their intersections with the mafic flow unit. The above mentioned mineralized zones of the Shoreline Basalt system combine to form a known strike length of over 2 kms. The combined strike length of the 007 and Emperor Zones is currently over 500 meters long as demonstrated by drilling to date. Mineralization consists of free gold and pyrite within quartz-carbonate veining and associated alteration consistent with the Rice Lake and Hinge Mines and the 007 development.

        FOR IMMEDIATE RELEASE www.sangold.ca March 4, 2011

        For

        1. San could face milling capacity shortages if mining production could keep up with these number"s!.. including a new daily mined record of 2,674 tons. Individual face grades have assayed up to 11.2 oz/ton (384 g/tonne) over a true width of 3.4 meters (11.0 ft) with visible gold being routinely observed throughout...Coo, mention from the conference call about 400 tns was being hoisted from below back up to surface. Note here " San uses a skip attached to the bottom of the hoisting cage as means for hoisting which does cause some delays ( just my opinion ) as workers and euipment also board the cage above. Timing the best time of day for skiping should be a priority. San should be looking at Mill expansion above their current upgrade to 1800 tns as we see mining tonage could surpasse this quite easily.. PS' San, get this second mill started, this ore has gold in it. Traps7