The Company monitors the QAQC information for the assaying process on a regular basis (standards and blanks sent to
assay laboratories and the duplicates and replicates done by the laboratories). The Author has reviewed this information
and found no serious discrepancies that had not been recognized and dealt with by the Company geologists.
The mineral resources are defined in terms of NI 43-101 regulations and their estimation was carried out using industry
standard polygonal longitudinal section methodology. The drill hole data was evaluated in plan and section in three
dimensional AutoCAD to determine continuity between holes. Vein structures in the RLM area have vertical extents
from 4 to 8 times their strike length. Because of this, areas of influence used around drill hole pierce points on the
longitudinal section for purposes of defining measured and indicated resources are ellipses, elongate down dip. For
measured resources an ellipse with short axis of 50 feet and long axis of 100 feet was used; and for indicated resources
an ellipse with short axis 75 feet and long axis 150 feet was used.
The Company’s production department uses Amine software for reserve estimation and mine planning. Amine is a 3D
AutoCAD based system that uses block modelling to determine reserve and resource estimates. The Author has crosschecked
the Amine methodology versus his polygonal longitudinal section methodology and has found no material
differences between the results of the two methodologies. Amine uses 3D modelling to determine volumetric
information for resources and beyond that step, the same tonnage factors are used to determine the tonnages. For
reserve estimation, the Author used the minimum mining width, recovery, and metal price criteria that are currently
used by the Production department. Cut-off grades were based upon current mining costs as presented in the economic
assessment of the Project.
The key assumptions used by the Author for conversion of measured and indicated resources to proven and probable
reserves are:
1) Resource tonnage factor 11.4 cubic feet per ton (equivalent to an average specific gravity of 2.8)
2) Minimum mining width 5 feet horizontal.
3) Mill Call Factor 95%
4) Mill Gold Recovery 93%
5) Gold price US$1200, Canadian$1260 at 1.05 exchange rate.
6) External cut-off grade 0.13 ounces per ton (based upon total operating costs of $165/ton and taking
into account mill gold recovery and the assumed price of gold).
7) Internal cut-off grade 0.10 ounces per ton (based upon total mining costs (ore delivered to mill) of
$123/ton and taking into account mill gold recovery and the assumed price of gold)..
The Author concludes that the work completed to date on the Property has demonstrated the presence of significant gold
reserves and resources that warrant additional surface and underground exploration and development programs with the
objective to confirm the geometry and continuity of the vein structures and to confirm sufficient measured and indicated
mineral resources to warrant completion of internal feasibility studies.
The economic assessment contained in this Report indicates that the Rice Lake Project is economically viable. The
following is a summary of key economic results.