Skip to content
Sign in

Post

San Gold Corporation

Prez3.8 rating from 91 members13.3K ptsRate

.......opening higher

T:SGR Depth by Price @09:22:47
Bid Ask
Orders Size Price Price Size Orders
16 73,400 3.46 3.46 75,660 31
1 3,500 3.27 3.47 1,000 1
3 10,535 3.25 3.48 1,500 1
1 1,500 3.24 3.49 9,850 3
2 800 3.23 3.50 9,840 5

...........traps7.

Join the conversation about San Gold Corporation.

Reply

Replies

  1. The sharp rise on the open was probably the BNN Jtaylor effect. I always feel much better when we grind forward at a snails pace. Less opportunity for day traders and hopefully they will find another cash cow.

    1. It is gratifying to see the equities finally reacting positively to the rise in the POG, producers more than explorers but nonetheless....

      1. .........we know we have the capability to produce high grade for cheap, Bay ST just needs to see a higher 43-101 and some cash flow.........

        July 14, 2009

        Dale Ginn, CEO of San Gold Corporation (SGR: TSX-V) is pleased to present the results of the 11,762 ton Hinge

        Zone bulk sampling program that was carried out during the second quarter of 2009. The high grade nature of

        the hinge zones were validated as the stope mining grade reconciled to the mill at 21.7 g/tonne (0.63 oz/ton) with

        the main #1 lens stope contributing 26.3 g/tonne (0.77 oz/ton). Low total operating costs (mine and mill) of Cdn

        $184 ($US 158) per ounce were realized as well as high mill recoveries of 96%. Total expenditures (operating and

        capital) to date in order to build and develop the Hinge Mine are approximately Cdn $6.5 million with nearly 6,000

        ounces recovered to June 30

        th

        . A table containing the detailed breakdown of stoping, development, mill and cost

        data follows the written portion of this press release.

        Highlights and Observations of the Hinge Zone Bulk Sampling Program include:

        5,938 ounces recovered from 11,762 tons mined and processed.

        Stoping grades of 21.7 g/tonne (0.63 oz/ton) and development grades of 16.9 g/tonne (0.49 oz/ton).

        Main Hinge lens #1 grades 26.3 g/tonne (0.77 oz/ton) in stoping and 21.2 g/tonne (0.62 oz/ton) in development.

        Bulk sample operating costs averaged Cdn $59 per ton for mining and Cdn $19 per ton for milling, for a total direct

        operating cost of Cdn $78 per ton, excluding capital expenditures and exploration drilling.

        Total direct bulk sample operating cost per ounce of gold produced is Cdn $184 per ounce or approximately US

        $158 as at June 30, 2009.................Long On The Greens Traps7

        1. "Bay ST just needs to see a higher 43-101 and some cash flow........."

          Traps, I guess it's just like what they say in the movies: "Show me the money!".

          (laffs)

          1. I'm feeling good about this week. Optimistic that we will see news tomorrow.

            I doubt SGR will go a whole month without a single NR.

            Anyone else feeling that way?

            Jeff

      2. Historically it is always been that way. Just like physical gold the producers get priced out of reach of the man on the street. Legitimate explorers will have their turn soon enough, especially if they are working a known deposit. The game will pretty much be over when the Howe street crooks start selling their moose pasture to deperate refugees that missed the last boat.