Replied in thread
Re: Meeting
GB Thanks for posting. You mentioned $1100 but is that CAD or US as the price is still over $1300 CAD? Thanks.
Replied in thread
GB Thanks for posting. You mentioned $1100 but is that CAD or US as the price is still over $1300 CAD? Thanks.
Replied in thread
This is what I came up with. 175,311 tons x 0.1236 oz/ton x 0.933 = 20,217 oz .....it's pretty close.
Replied in thread
Jeff, Tons and Tonnes are not the same so you would have to apply conversion rates.
Replied in thread
Approx. Production next 4 yrs = 410,000 oz @ $800/oz profit = $328M + $50M DB = $378M - $200M development = $178M for exploration, etc. This is with avg guidance production, gold price and production costs staying at current levels.
Replied in thread
Rookie, I totally agree with your statement regarding the January production numbers. When you take a look at the graph on page 7 of the corporate presentation you will notice at the far right hand side which I assume to be late December and early January that they were mining…
191,105 tons = 173,367 tonnes 5.21/31.1 = 0.1675 173,367 x 0.1675 x 0.933 = 27,093oz