Record Production in Q1 2012

San Gold Achieves Record Production in Q1 2012
WINNIPEG, MANITOBA--(Marketwire - April 11, 2012) - San Gold Corporation (TSX:SGR)(OTCQX:SGRCF) today announced preliminary results of operations at its Rice Lake Mining Complex in Manitoba, Canada for the quarter ended March 31, 2012.

Q1 Production Highlights

--  Record gold production of 22,162 ounces. 
--  Mill production of 153,537 tons. 
--  Mine production of 144,549 tons.
First Quarter 2012 Preliminary Operating Results

San Gold produced a record 22,162 ounces of gold in the first quarter. In addition the company finished the quarter with approximately 16,100 tons of ore in surface stockpiles representing an additional 2,000 to 2,500 ounces of gold in front of the mill.

The operation milled a record 153,537 tons in the quarter at an average daily throughput of 1,687 tons per day, 85% more than was milled during the first quarter of 2011. Grade was 5.35 grams per tonne, which is similar to the previous quarter and slightly below our full year budgeted grade of 6.58 grams per tonne. Recovery improved to 92.4% for the quarter, with a recovery of 93.5% achieved in March.

"The Rice Lake operations team has got off to an excellent start in Q1 and we remain on track to achieve our full year guidance of between 95,000 and 105,000 ounces of gold," said San Gold President and Chief Executive Officer George Pirie.

The operation mined a record 144,549 tons of ore despite a 14-day scheduled upgrade of the A-shaft loading pocket to improve material handling capacity in Rice Lake. The company completed 1,946 metres of lateral development and 275 metres of vertical development during the quarter. Underground mine operations remain focused on developing an extensive mining complex that will facilitate access to the down dip extensions of the L10 and 007 from the Rice Lake shaft infrastructure on 16 and 26 levels.

About San Gold

San Gold is an established Canadian gold producer, explorer, and developer that owns and operates the Hinge, 007, and Rice Lake mines near Bissett, Manitoba. The Company employs more than 400 people and is committed to the highest standards of safety and environmental stewardship. San Gold is on the Toronto Stock Exchange under the symbol "SGR" and on the OTCQX under the symbol "SGRCF".

For further information on San Gold, please visit www.sangold.ca

Cautionary Note

This news release includes certain "forward-looking statements". All statements, other than statements of historical fact included in this release, including, without limitation, statements regarding forecast gold production, gold grades, recoveries, cash operating costs, potential mineralization, mineral resources, mineral reserves, exploration results, and future plans and objectives of the Company, are forward-looking statements that involve various risks and uncertainties. These forward-looking statements include, but are not limited to, statements with respect to mining and processing of mined ore, achieving projected recovery rates, anticipated production rates and mine life, operating efficiencies, costs and expenditures, changes in mineral resources and conversion of mineral resources to proven and probable mineral reserves, and other information that is based on forecasts of future operational or financial results, estimates of amounts not yet determinable and assumptions of management.

Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "estimates" or "intends", or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and may be "forward-looking statements." Forward-looking statements are subject to a variety of risks and uncertainties that could cause actual events or results to differ from those reflected in the forward-looking statements.

There can be no assurance that forward-looking statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's expectations include, among others, the actual results of current exploration activities, conclusions of economic evaluations and changes in project parameters as plans continue to be refined as well as future prices of precious metals, as well as those factors discussed in the section entitled "Other MD&A Requirements and Additional Disclosure and Risk Factors" in the Company's most recent quarterly Management's Analysis and Discussion ("MD&A"). Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.


No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

Join the conversation about San Gold Corporation.

Reply

Replies

  1. "Grade was 5.35 grams per tonne, which is similar to the previous quarter and slightly below our full year budgeted grade of 6.58 grams per tonne."

    Slightly below? That's ~20% below budgeted grade. That means you will need to be 1.23 g/t above your budgeted grade on a similar tonnage to meet guidance. That's 153,000 tons at 7.81 g/t to make up for the shortfall or less if you average it out over the next 3 quarters. Maybe time to crack open one of those jewelry boxes.

    1. That's 153,000 tons at 7.81 g/t to make up for the shortfall or less if you average it out over the next 3 quarters. Maybe time to crack open one of those jewelry boxes.

      That is not actually 100% correct Lunch. The other way to acheive guidance would be to increase production up to 2,000 tons per day. That would add another 4600 ounces to the total. It would be interesting to know what March production was.

      1. I'm talking grade. They said 6.58 is their budgeted annual guidance. They can't increase grade by running more of the same 5.35. 2000 t/d of 5.35 does not increase grade.

    2. Good call, Deliverator. I guess that's how they miss their guidance. It was in the MD&A and annual report all along. The trend towards lower grades was established a while back continuing unabated while it just seems impossible to max out the mill and improve recoveries. It is likely safe to say the cost of production didn't go down significantly.

      Now a measly half million oz addition to the 43-101 would be the icing on the cake.

      The company from the top down is simply mediocre, which is being gentle IMO.

      1. I'm hoping the grade will improve once most of the heavy development is finished. Management should explain why the grade is below historical and budgeted targets.

        "The company completed 1,946 metres of lateral development and 275 metres of vertical development during the quarter. Underground mine operations remain focused on developing an extensive mining complex that will facilitate access to the down dip extensions of the L10 and 007 from the Rice Lake shaft infrastructure on 16 and 26 levels"

        Between now and the AGM the only news we're going to get will be from exploration program or perhaps they drift / develope into a new high grade zone. The 43-101 may or may not be welcome news.

        As a note, I hate the "typical" comparisons to last years same quarters, if George thinks they make SGR look good, he's not impressing this fractional owner.

        1. "As a note, I hate the "typical" comparisons to last years same quarters, if George thinks they make SGR look good, he's not impressing this fractional owner."

          I agree WPG Money. He's not impressing anyone with any thinking skills. That's why the stock is where it is. Maybe if he just started telling the truth, he would at least get some respect. The share price will go where it goes based on production numbers, nothing else.

      2. "In addition the company finished the quarter with approximately 16,100 tons of ore in surface stockpiles representing an additional 2,000 to 2,500 ounces of gold in front of the mill."

        16,100 tons x .15 ounces per ton (4.66g/t) x 93.5%(recovery) = ~2,250 ounces

        So the stockpile is somewhere in the range of 0.13 o/t (4.04g/t) to 0.17 o/t (5.28g/t) and is and has always been a non issue if it's the same pile that's been sitting in front of the mill since 2011.

        Less than Q1 grade and less than the historic average and 2012 guidance.

        The market knows everything there is to know about this company. There are no surprises and the only rumour out there is too unrealistic to be believed.

        Does anyone have Pershing Square's phone number?

        1. Better yet Lunch, why don't we ask Rob McEwen (MUX) to step in instead. That way, we may really have a chance at being a part of the next Goldcorp. /sarc off.

        2. So the stockpile is somewhere in the range of 0.13 o/t (4.04g/t) to 0.17 o/t (5.28g/t) and is and has always been a non issue if it's the same pile that's been sitting in front of the mill since 2011.....................................Lunch, different ways to view this stock pile. Looking back a few months we were told there was 27,000 tns sitting at the Mill around 5/6 gr tn. Simple math means 10,000 tns was used to help supplement the Qtr to help push to record production leaving 16,000 tn for future. Since the Mill is operating around 4 to 5 % below efficiency alot of oz are lost in the recovery although San may retrieve the oz out in the tailing pond.Sans guidance appears to be counting on this stockpile also for this Qtr.Traps7..

          1. They aren't mining what they put through the mill on a daily basis so the make-up ore must be coming from the stock pile.

            The real problem here is neither the amount mined nor the amount milled are at capacity. The operations group should be taken to task on this point, but they won't be. Most companies strive to excel, not this one. It's perfectly acceptable to be underachievers.

            1. Replying to @Silverback

              I disagree silverback.

              the issue isn't about capacity, it's all about head grade.

              Even if they are at capacity doesn't make them more profitable. Probably they can get to capacity if they hire more people and buy more equipement... but costs go up too.

              They have to get their cost per oz down. The simplest solution to this is mining a higher head grade.

              Evertyhing is tied to head grade and I am starting to wonder if they actually have any high grade ore in Bissette. The head grade keeps going down and down and down.

              SGR is looking more like the Titanic. A lot of hype only to go crashing down.

              1. Replying to @jefferam

                SGR is looking more like the Titanic. A lot of hype only to go crashing down.

                Lots of Titanics these days, the entire sector has been carpet bombed. I'm sure someone can dig up the exception to the rule. But all I see on the bottom of the sea these days is junior mining "Titanics".

              2. Replying to @jefferam

                Jeff, don't forget they did over two km of development in Q1, with that comes some low grade and no grade ore they run through the mill.

                Low volume day, are the day traders on vacation ?

                Have a good weekend to whoever is left here

              3. Replying to @jefferam

                True enough, jefferam, falling grade is a definite concern. But as Lunch Meat and wpgmoney have suggested and as we all hope, it is a result of a higher percentage of lower grade development ore being run through the mill. If that is the case, then the head grades will get better with time. However IMO they will never be equal to the lofty grades encountered in the cores because of the inevitable waste rock resulting from mining techniques. But why is the historical grade from the SA at 0.25 oz/t? Surely they should be able to match that.

                The only way to counteract low grades is volume which can be seen from open pit operations. Obviously an underground operation will be higher cost and lower volume (in general) but wasn't the idea to have enough facies to fill the mill? When's that going to happen? If they don't have enough, why set objectives that can't be met or they have no intention of meeting.

                And they're talking of expanding the mill capacity again? Prove you can mine 1850 t/d and run the mill at that rate AND MAKE MONEY for a while then start talking bigger and better. Empty talk doesn't add shareholder value.

                AIMVFO

                1. Replying to @Silverback

                  What is this whole "development ore" you guys keep talking about?

                  It's a narrow vein gold mine, development ore for a level is mined in a month and cycled with stoping blocks. Someone fed you guys a line that you just won't stop believing. Drop this whole development ore stuff, that only exists when you're talking about a single stoping block, not an entire operation.

                  1. Replying to @jcmancin

                    Ok JC, whatever you say. I have close to a 40 minute recorded conversation with IR where he mentions dilution of grade because of development ore going through the mill and it will continue to do so until build out of the mine plan is complete. The analysts even ask about it and reference it in their reports so it obviously is a concern. I suggest you look at the outdated corporate presentation and refer to page 18. Pay close attention to 'planned workings'. What you say is obvious to everyone but the fact is the main focus isn't on extraction of ore bodies to depletion as it would be in a full on producer's case focussed on ounces out and costs down, the focus continues to be on gaining access to the multiple faces and exploration.

                    1. Replying to @Lunch Meat

                      This may be simplistic because I'm not a mining rocket surgeon but if the development rock is obviously barren as it appears to be on pg 18, why bother running it through the mill at all? Maybe use it as landscape rock for the mansions being built in town.

                      1. Replying to @Silverback

                        Silver, "Development ore" is the ore that you would mine to develop your mining blocks. So things like your level cuts, this will be more of an exploration and slower process which generates less tons and usually is lower grade since you kind of don't know where the ore starts and stops, so you poke around the edges and try to center the ore in your face. Once the levels are established, you just blast everything in between them using whatever mining method you choose. The idea is that once you're at that point you have a good idea of where the good gold is and the dilution can be kept down, you also use significantly cheaper mining methods than "development".

                        In narrow vein mining you establish levels and mine the blocks very quickly, you need a dozen or more faces, mininum, at all times. Which means you might have 4-6 development faces at a time and another 8 or 10 stoping blocks where you can draw ore from.

                        Again, this is at ALL times, year round, month by month. You don't just do all the development first and then all the stoping, you layer it so there is a lot of overlap. If you did all the development first and then the stopes, you would end up in a situation where you got not enough ore at first, then way too much. The key to mining is the utilization of mining equipment and people to ensure a steady flow of ore, not quick fluctuations to satisfy the market.

                          1. Replying to @Lunch Meat

                            Managemwent was all "raised" in the era "Be seen and not heard" and find it impossible to break tradition! Ie, between ages 3 and 5 when communication skills are honed!

                            Tough teaching an old dog new tricks!

                            RUF

                  2. Replying to @jcmancin

                    1. What is this whole "development ore" you guys keep talking about? ..Jcmancin,. San choose to change their mining plan from the 06 production date to the addition of surface mining hence 007 hinge etc . This required 100 + million which San flowthrough which added alot of common shares dropping share value. Tax regulation dictates on how these funds can be used in which San used some for exploration and most for development like tying in 007/hige below a shaft,portels and ramping. This development finding oz:s should be called development oz and not production oz on the balance sheet. The conversation of past was to the stock pile sitting at the Mill which went from 27,000 tn to 16,000 tn this last qtr. This pile either production oz or develpment oz either way was used to supplement Sans short fall in meeting 1800 tn of ore through the Mill. Understandably here San since adding flotation cells can"t meet mill eficientcy at 1800/2000 tn/day at 97;5 %Development mining vs. production mining

                      There are two principal phases of underground mining: development mining and production mining.

                      Development mining is composed of excavation almost entirely in (non-valuable) waste rock in order to gain access to the orebody. There are six steps in development mining: remove previously blasted material (muck out round), Scaling (removing any unstable slabs of rock hanging from the roof and sidewalls to protect workers and equipment from damage), support excavation, drill rock face, load explosives, and blast explosives.

                      Production mining is further broken down into two methods, long hole and short hole. Short hole mining is similar to development mining, except that it occurs in ore. There are several different methods of long hole mining. Typically long hole mining requires two excavations within the ore at different elevations below surface, (15 m – 30 m apart). Holes are drilled between the two excavations and loaded with explosives. The holes are blasted and the ore is removed from the bottom excavation..

                          1. Replying to @Lunch Meat

                            Couldn't resist.

                            Made a few calls and loaded back up to my original position at 1.31 last week.

                            Might take 6 months, might take a year, but this company is going to gain traction very, very quickly once it starts.

                            Management has not hit the panic button, because they know very well what they have. It gets clearer and clearer every day.

                            This is gonna be big!

                            1. Replying to @Money Tracker

                              "If you are so naive that you think there is no such thing as a manipulated market you probably won't be in touch with your money for long!" Bob Moriarity

                              It's simply a fact of nature, "The foxes when in charge of the henhouse, often kill the chickens just for entertainment!"

                              "Buy when the blood is running in the streets," has a similar has that familiar ring to it!

                              RUF

  2. I guess, if it hasn't changed by now, we are stuck with a grade of 5.5 g. per ton in the, new mechanized mine, that they are well on their way to building at Rice Lake. So maybe we can live with that as long as the cost per ounce produced decreases and the tons milled increases. I noticed that they didn't mention in the NR the cost to produce an oz. of the yellow stuff however.

    1. 5.5 g/t is about .2 o/t and 0.05 ounces per ton less than San Antonio Gold Mines Ltd produced over 36 years. The development ore is killing us and we still need 10x the grade to get into the top 10. 10x the grade = 10x the sp. Running current t/d at 2.0 ounces/t would do it. Whatever happened to that rumour?