Peter George...Same old tricks

One would think after San Gold and Rubicon had their 43101's ammended and revised downwards after the same Peter George expert analysis that this will be the mother of all revisions. Sidenote:BGM's so called deposit would make G's Redlake look like lowgrade moose pasture.

Barkerville to release full Cow Mountain report to BCSC

2012-07-11 23:35 PT - News Release

Mr. Frank Callaghan reports

BARKERVILLE CLARIFIES TECHNICAL DISCLOSURE

As a result of a review by the British Columbia Securities Commission (BCSC), Barkerville Gold Mines Ltd. is clarifying its technical disclosure.

On June 28, 2012, the company issued a news release reporting an indicated resource and geological potential at its Cow Mountain property. On July 4, 2012, the company received a technical disclosure review letter from the BCSC asking the company to provide additional information to the BCSC to support the indicated resource estimate and exploration target disclosed in the original news release. In an effort to provide a timely response to the BCSC, the company's qualified person, Peter T. George, provided a draft technical report to the BCSC immediately, which was not complete and not due under NI 43-101 standards of disclosure for mineral projects until 45 days after the original news release (Aug. 13, 2012).

Upon review of the incomplete draft technical report, the BCSC expressed concerns about certain of the methods, parameters and assumptions that were used to estimate the mineral resources and potential exploration targets at Cow Mountain, as well as the estimates themselves. The BCSC expressed concern that the disclosure in the original news release of a 10.6-million-ounce indicated gold resource (69 million tonnes grading 0.154 ounce per tonne) and 65 to 90 million additional ounces in potential is inadequately supported in the draft technical report and estimated in a manner that appears contrary to normal industry practice and therefore could be construed as misleading.

A summary of the concerns of the BCSC regarding the resource estimate disclosed in the original news release include:

  1. The drill-hole assays were not composited before estimating resource grade;
  2. The estimates do not apply grade capping, despite most of the gold in the reported 2011 drill intersections being in thin, high-grade intersections;
  3. The resource appears to be unconstrained by the geological model of the gold-hosting structures;
  4. Failure to cap and use of an unconstrained bulk-tonnage resource model is likely to have resulted in material overestimation of grade and tonnage of the resource;
  5. No external cut-off grade.

A summary of the concerns of the BCSC regarding the exploration target relate to what was initially perceived as a lack of local data used to estimate potential tonne and grade ranges along strike for such geological potential. For example:

  1. Using the indicated resource as a basis for the quantity and grade of potential exploration targets in other locations along strike;
  2. Grade ranges of estimates of potential set an apparent arbitrary plus or minus 15 per cent above and below average grade of the resource;
  3. Tonnage ranges apparently arbitrary based on percentages above and below the resource tonnage.

The company has indicated it will file a complete draft NI 43-101-compliant technical report with the BCSC as soon as possible to respond to the BCSC's specific concerns and is working diligently with Mr. George to provide the same. The company, in discussion with Mr. George, is confident that the supporting appendices to his draft technical report, which had not been completed and provided to the BCSC in the first instance, will adequately address the recent comments from the BCSC.

The BCSC has suggested that the company complete an audit of the resource estimate and exploration target and, predicated on the company's prior receipt and review of the final technical report from Mr. George, and in further consultation with the BCSC at that time, the company may immediately determine to engage a further qualified person for that purpose.

Until this technical disclosure review by the BCSC is resolved, the company cautions investors not to rely on either the indicated resource estimate or the geological potential disclosed in the original news release.

The company confirms that it will file on SEDAR a technical report supporting its Cow Mountain estimates within the required 45-day period following the June 28, 2012, news release, and that it will promptly announce any material changes to its estimates that result from the audit or preparation of the report.

The technical information in this news release has been reviewed and approved by the author Mr. George, PGeo, and the company's chief geologist Jim Yin, PhD, PGeo, both qualified people as defined in National Instrument 43-101.

Join the conversation about San Gold Corporation.

Reply

Replies

  1. I noticed the same thing, except the name.

    I was wondering how they could show so many oz in the indicated and SGR could only show ozs in the inferred and all that with 350,000m drilled.

    What a clown

    1. Andy,

      I noticed the same thing, except the name.

      I was wondering how they could show so many oz in the indicated and SGR could only show ozs in the inferred and all that with 350,000m drilled.

      What a clown............................PS" This so called in-house 43-101 was prepared by dale, a qualified person under a 43-101 so the numbers are his..Please refer :

    2. Mineral resources were estimated with a block model utilizing inverse distance squared methodology on a block size of 3 feet x 3 feet x 3 feet.
    3. Assays were capped at 102.9 g/tonne (3.0 ounces/ton) for drill holes and 34.3 g/tonne (1.0 ounce per ton) for chip samples.
    4. Inferred mineral resources are not in the current mine plan and therefore do not have demonstrated economic viability.
    5. As per section 4.2(1) J (ii) of National Instrument 43-101, the change in mineral reserves for the Rice Lake Project does not constitute a material change in the affairs of the Company. Refer to the National Instrument 43-101 Technical Report filed on SEDAR, dated October, 2010, by GeoEx Limited.
    6. The mineral resource and mineral reserve estimate as of March 31, 2012 was prepared under the supervision of Dale Ginn, P.Geo, a Qualified Person within the meaning of National Instrument 43-101.
    7. The data in this table was prepared by the Company's Rice Lake Project geology and engineering teams led by: Chief Geologist, Doug Berthelsen (P.Geo); Chief Engineer, Joe Hunter (P.Eng); and Resource Geologist, Shawn Horte.
    8. The company is a producing issuer as per National Instrument 43-101 section 5.3.
    9. MINERAL RESOURCE AND RESERVE ESTIMATE

      Historically, resources at the Rice Lake Project were estimated using the polygonal method. More recently, with the use of Amine® software, the measured and indicated mineral resource estimate is derived by creating a block model.

      The construction of the block model begins by creating 3D wireframes or meshes around mineralization as determined from both underground and surface drilling, underground mapping and sampling, and/or surface mapping and sampling. Once constructed, the drill hole and chip assays enveloped in the meshes are composited by the software and used to interpolate grade blocks. The resource block model was estimated utilizing inverse distance squared methodology on a block size of 3 feet x 3 feet x 3 feet.

      The mineral resources at the Rice Lake Project are classified as measured, indicated, and inferred categories based on the following criteria:

      1) Measured Mineral Resource:

      A resource block can be classified as measured if its vertical and lateral extents are bounded by mine development including sills, lifts, and benches that has been sampled; or the block has been projected to a maximum of one mine level (approximately 50 feet) from mine development and there are diamond drill hole intersections to indicate the continuity of the structure below or above the development.

      2) Indicated Mineral Resource:

      A resource block can be classified as indicated if it has been projected to a maximum of one mine level (50 feet) from development if there is no drilling beyond to indicate its continuity, or the block has been sampled by tightly spaced diamond drill holes on structures that have either been previously mined or mapped and sampled at surface. A closely spaced diamond drill program is generally less than 100 feet between drill hole intersections.

      3) Inferred Mineral Resource:

      Inferred mineral resources are determined using the polygonal method from widely spaced diamond drill holes (greater than 100 feet between intersections) whose structure can be extrapolated from previous production history and relevant geologic data.

      The Company's mineral reserve estimate is developed by incorporating measured and indicated mineral resources on which detailed near-term mine planning has been applied to date for the Rice Lake Project. Each mining area has been analyzed and a distinct extraction ratio and dilution factor was calculated using a minimum mining width of 2.7 metres with a mill recovery of 93%. Mineral resources which can be shown to be economically extracted at a gold price of US$1,260 per ounce are assigned to proven and probable mineral reserve status based on geological confidence and professional opinion within the near-term mining plan. As the mid-term to long-term mining plan is developed, further measured and indicated mineral resources are anticipated to convert to mineral reserves

    10. As Peter Geoge told the BCSC when questioned about why there was no inferred`in the release. Quote`` Because there is none, it is all indicated`` Unquote. No doubt it will be reduced a certain amount, most NI 43-101 Reports come out high mostly at the urging of company Geo`s, But I doubt that Peter George would put his reputation on the line for anybody. He has done the reports for many large companies including Goldcorp, Harmony, Rubicon, Lakeshore and lets not forget Sangold. Sorry for the off topic response gents. HM

      1. I'm not the only one asking questions.

        Post says Barkerville Gold has some explaining to do

        2012-07-13 06:36 PT - In the News

        The Financial Post reports in its Friday edition from the minute Barkerville Gold Mines announced what looked like one of the greatest gold discoveries ever, many investors were skeptical. The Post's Peter Koven writes so it was little surprise the B.C. Securities Commission has wide-ranging concerns about disclosure around the company's Cow Mountain project. Barkerville, a Vancouver junior, said on June 28 that it has found 10.6 million ounces of indicated gold resources at Cow Mountain. It also said the "geological potential" of the project could be as much as 90 million ounces. The numbers came from a resource report prepared by an independent geologist named Peter George. The previous resource at Cow Mountain was 431,000 ounces, so people wondered how the size and the grade of the deposit increased so much that it got to 10.6 million. The BCSC requested and received a draft technical report from Mr. George, and based on that, it is concerned about many of the parameters and assumptions in his work. For example, it is worried that the particular bulk tonnage resource model used by Mr. George resulted in "material overestimation" of the grade and tonnage. Barkerville shares fell sharply on the news.

        1. Funny that the BCSC questions echo that of a certain news letter writer. He sure can spit on companies that won't pay him to promote or is he shorting? JMHO HM

          1. If you are referring to Brent Cook, you may want to check your facts. Not everyone in this business are as shady and underhanded as some of those on Howe.

            1. Replying to @Lunch Meat

              By their own admission, Mr Cook et al concede they have not seen the final document. It seems premature to accuse BGM of being another Bre-X without the complete package. There may be revisions to the final number but even if it is half of what has been stated, the deposit is still considerable. And I agree, Mr George has nothing to gain by putting his name on a scam, unless, of course, there was a little extra on his paycheck. As per usual, the proof of the pudding is in the eating. I hope it doesn't taste like crow.

              Disclosure : I have rolled the dice with a few shares of BGM. At the least, there should be trading opportunities.