Skip to content
Sign in

Post

Silver Falcon Mining

You’re reading Igalop’s reply in this thread.Jump to it

Prez3.9 rating from 73 members9.8K ptsRate

Calcs

Let's see- ((.75 oz/t x $1200) x .85)-$50 = $715 net/t. The .85 accounts for the 15% (.15) royalties to GHDC. And remember, you have to subtract $50 costs for each ton, not for each ounce. At .75 tons/oz, that's $67/oz costs.

So net $715/t x 50 t/day = $35750/day x 30 days = $1,072,500/mo x 12 = $12,870,000/yr.

Subtract $1M for lease payments, and you have a net of almost $12M/year. That's AFTER processing costs, after lease payments, after the 15% royalty.

Ramp up to 100 tpd yields 2 x $12,870,000 = $25,740,000/yr - $1M = ~$25M/yr AFTER costs.

200 tpd = $50M/year

300 tpd = $75M/year

400 tpd = $100M/year

And this is the "low grade" stuff?

And the market value of this company is $50M?

Join the conversation about Silver Falcon Mining.

Reply

Replies

  1. How about change the purity level?

    1 oz/ton X1200X85%-$50=%970X100 t/day (50 t/shift already announced)=$97,000/day

    X300 days/year=$29,100,000 net. However, IMO over the whole pile, we ought to see 2 oz./ton, gold equivalent. This mill may be able to be cranked to 200 per day as it was only designed to be a demo mill in the first place. Equal to $.30 per share in profits, if they don't dilute any more. @20 PE we are looking at $6.00 SP. OH, and 15% of net used for buyback.

    Also, we may have to contend with higher metal prices. Such a sad state of affairs for SFMI shareholders. Woe is me, the taxes will be enormous.

    1. I think 2 oz/t might be a tad optimistic (though I would love to see it!). The "visual" cutoff of visible gold is generally considered to result in a cutoff around 2 oz/t. So if the non-processed ore is generally less than 2 oz/t, I have a hard time thinking that it will average 2 oz/t. I was thinking maybe 1 oz/t, max, and am quite happy with .75 oz. But then, this is the "lower grade" stuff. Keep your fingers crossed!

      As far as the mill, they should be able to do 100 tpd as is. But they said this would be increased in July. A previous pr stated that they would be getting a rod mill this spring, so maybe adding that to the mix might be what will goose the numbers. Maybe 200 tpd or more. And of course if warranted, they can always build a bigger mill! Wouldn't you hate to see them have to spend money like that just because there was too much ore to process with the present setup?

      1. With the .75 oz. Au equivalencce having about half Au and half Ag, total Au/t is 11.6 gm. and total Ag/t is 25 oz. with what they are presently milling. That turns out to be a ratio of 1 oz. Au to 66 oz. Ag in what they are presently milling.IR has said that the milkl will go to 100 t/d probably this week (50 t/shift @ 2 shifts/.day)

        IR has also said that around this present week the mill will go to 100 t/day (50 t/shift @ 2 shifts/day). By July, the new rod mill will increase 2 shifts/day prod. to 400 t/day. Pierre has said that he expects to save one third of profits as savings. IR says we will save money from the present mill to build a 2,500 t/day mill. Permits alone will take at least 1 yr, with the building commencing from there. The larger new mill will use chemical processes to extract every gm. we can from the ore. As a result, it will be more difficult and time consuming to get the permits, since it will not be just a mechanical and water only system for Au-Ag extraction.

        I agree that .75 oz. Au/t is the good part of the tailings rather than the "low end stuff". The 6 gm./t Au are closer to the norm for most of the tailings, and that makes the .75 oz. Au/t something the geologists found in only a part of the total tailings. IR said recently that we may have 700,000 t of tailings worth $90. mil in total. At $90. mil., the per ton value would be $128./t for the whole 700,000 tons. IR has said that some of the tailings are high oz's. /t, which means that there are a large % of the 700,000 t that are less than 6 oz. Au/t to average out to $128. /t overall. This business of 2 oz. Au/t just does not add up to what IR and the SFMI press releases have said about the gm./t values in the tailings. I wish it were going to work out to 1 oz. Au/t in the tailings, but it won't. I think that the drilling from this summer and assays that SFMI has, but not yet released, will be oz's. /t Au and 50-100 oz's. /t Ag. The tailings are not the main revenue, and I am definately long on the company.

        1. Hmmm

          Not quite understanding what your saying. I was under the inpression that this is the lower grade stuff they are starting with. And this low grade was .75 oz equivelent.

          Thats what I am hearing

  2. It's come to my attention that the above ground material may not be subject to the 15% royalties to GHDC (I'll try to verify). If so, the numbers then change to

    (.75 oz/t x $1200)-$50 = $850 net/t. And remember, you have to subtract $50 costs for each ton, not for each ounce. At .75 tons/oz, that's $67/oz costs.

    So net $850/t x 50 t/day = $42500/day x 30 days = $1,275,000/mo x 12 = $15,300,000/yr.

    Subtract $1M for lease payments, and you have a net of $14M/year. That's AFTER processing costs and after lease payments.

    Ramp up to 100 tpd yields 2 x $15,300,000 = $30,600,000/yr - $1M = ~$30M/yr AFTER costs.

    200 tpd = $60M/year

    300 tpd = $90M/year

    400 tpd = $120M/year