Skip to content
Sign in

Post

Silver Falcon Mining

You’re reading goldpanner’s reply in this thread.Jump to it

Prez3.5 rating from 13 members2.7K ptsRate

Concentrate

On the other forum ( where most of my posts got deleted :) there was a discussion of what the concentrate SFMI was holding till their smelter got on line actually was and what was gold and what was silver, the result being the dore bars seen at the annual shm.

It was said they had tons of the stuff, is that the precious metals recovered from the ore that was crushed and run through the mill ? I know the recovery rate has been reported as being dismally low but the stock of concentrate that they have ( I recall a figure of 10 tons ?) once that gets smelted what do we have then ?

So if they only recovered 20% of the pm and will be running it again once they have the new process in place it seems we can expect at least triple the ammount of concentrate ? or concentrate that just holds more pm ? I recall seeing the small smelter in operation and about 2 kilos of concentrate producing a few ounces of dore.

Join the conversation about Silver Falcon Mining.

Reply

Replies

  1. Martin, didn't they report this info. in their last pr?


    "The ore concentrate values estimate based on this tonnage is approximately 3,659 Oz. Gold and 16,550 Oz. Silver. Using commodity prices of $1,625.00 GOLD (Au) and $30.00 (Ag) silver, the estimate gross value of the concentrates pre-smelt are $5.5M GOLD AND $500,000 SILVER."

    And it will not cost even a tenth of the pm extracted from it.

    1. Those numbers are for the ore that needs to be reprocessed. Referring to it as "concentrate" as the PR did is typical weasel wording. It's actually ore that has been depleted by about 20%, not concentrated. At 40 tpd, it would take over 2 years to process the 31k tons they have stockpiled. Based on $150-200k/month mill costs, it would cost $3.6-4.8M to reprocess it to remove 20% of the $5.5M in gold, or $1.1M. Not exactly cost efficient I would say. If the mill had been running efficiently, they would have extracted that $5.5M already, and not have to spend 2 more years getting just another 20% of it out.

      Once again, big thanks to CQ. He should be fired, and an experienced mill manager brought in to run the place competently. Does anyone really trust CQ to oversee the installation of the cyanide circuit or the mill expansion?

      1. I agree on your sentiments concerning CQ. However, not so sure on your other figures of the costs to reprocess that ore. The Company's position is that it will not cost even a small fraction of the pm extracted from it. I'm sure this will come up at the meetings in NY since most people didn't really understand that from the last pr.

        1. I don't know where you got the info that the company's position is that it will cost only a small fraction of the PM value to extract it. Maybe in their numbers that they project for after the cyanide circuit is in, but not now. The only saving is that the stockpiled stuff does not have to be milled again. Maybe it takes a lot less time to reprocess it than it does for the original milling, but I doubt it, since I assume the capacities of the mill and separation circuit are matched. Otherwise, they could have been reprocessing it all along. Which I think they have done to some extent- I think that might be the "super concentrate" RK referred to. Even if they did reprocess the ore, it would still be taking operating time that could be used for new ore. It's a ridiculous situation- they are stuck with 30,000 tons of ore that's of lower grade than the fresh waste ore, and they don't have the capacity to process it and fresh ore, too. At present efficiencies, it doesn't pay to reprocess it, and certainly not in preference to higher grade stuff. And it's too valuable to throw away. Maybe just put a plaque on it saying "CQ Memorial Dump".

      2. I agree, It's time for a change.

        At this point, I would almost be happy to see the Hoffman crew from the Gold Rush show come in and run the mill. At least Todd has a couple of seasons worth of experience now.

        1. The Hoffman's might be the ticket and only a few hours from home.

          Now here's a head sratcher for you guys. I called IR and was asking about a few things and the recovery rates came up. APPARENTLY those numbers were miscalculated, with recovery's much higher and they would be clarifying things in a new release. If things weren't so pathetic, it would almost be funny.

  2. About a year ago SFMI said they had 10 tons of concentrate, but they have never told us what the composition is. So your guess is as good as mine on how much gold and silver it represents. At 6 g/t and 40 t/d, that's 8 oz Au/d, but only 1.6 oz (20%) recovered. For 2 years, that's something over 2000 oz AU, or $3.2M. It cost more to run the mill during that time.

    If they recovered about 20% of the gold and silver, that leaves 2 years worth of ore that needs to be reprocessed unless they start mining better ore before then. It will be easier to reprocess, since it is already ground, but it will still take a long time if they end up doing it. Not sure they will ever bother, since the unprocessed waste ore is at least slightly higher grade, and at some point they will be mining even higher grade stuff. What a fiasco. Thanks, CQ.