SFMI press release today....

SILVER FALCON MINING, INC. (SFMI) PROVIDES UPDATE ON CLOSED CIRCUIT LEACHING PLANT

Bradenton, FL-November 20, 2012- Silver Falcon Mining, Inc. (SFMI.OTCBB) provides an update on the regulatory approval process on the Company’s closed circuit leaching plant.

On November 14, 2012, SFMI's Vice-President of Corporate Development and the Company's advisor, Dr. Gretchen Hoy of Hoy Environmental, PLLC, took part in a pre-application meeting for the cyanidation application currently being developed under the permit awarded in July to SFMI’s Murphy Mill site. Department of Lands (IDL), Bureau of Land Management (BLM), Idaho Department of Environmental Quality (IDEQ) and the Environmental Protection Agency (EPA) were present. This pre-application meeting gave the Company the opportunity to present the scope and lay down the basis of its project to the agencies and to review all State and Federal regulations applicable to this permit which the Company intends to deposit before the end of 2012.

Drilling Program Update

With the property now secured, the equipment necessary for work to begin in the Sinker Tunnel Gold Project is arriving on site and is being made ready for use.

There are three kinds of ore on the Company's properties; INFERRED resources, PROBABLE reserves and PROVEN reserves. The drilling program will be an ongoing affair with drilling both inside and on the surface of the mountain while it explores and evaluates the value of the ore available. This will translate into the much awaited instrument NI 43-101 giving the shareholders positive proof of the value of their holdings. A supply of the rich ore from the veins available in the Sinker tunnel will enable the Company to adjust its mill to the appropriate settings for a continued production and delivery of Bullion DORE.

Metallurgical Lab Update

The Company expects the laboratory facility to be fully operational in the near future. Enclosure and inside furnishings are being completed and barring any unforeseen event, should be occupied and in operation by the end of the year.

Mill Update

The Company curtailed its night operations at the mill to allow for the testing and adjusting of the crushing and gravity circuits, which will handle the processing of virgin ore from the Sinker tunnel within the permissible directives of the agencies concerned. This will allow a concentrated effort on the Flotation Circuit, and will permit an increase in productions of precious metal concentrate to allow for full production of all circuits (crushing, gravity, flotation, leaching) in 2013. In the meantime, an increase in bullion delivery is anticipated next year as both the new ore from the Sinker tunnel and the output from the flotation circuit increase in tonnage.

From Management

Mr. Pierre Quilliam, CEO, said, "Once work is underway to corroborate the findings of the USGS (United States Geological Survey),into the estimated reserves in War Eagle Mountain, we will be thrilled to report on the ongoing findings coming from the geologists allowing the Company to file the long awaited instrument NI 43-101."

About Silver Falcon Mining, Inc.


SFMI has mineral rights to approximately 2,000 acres on War Eagle Mountain in southern Idaho, Its Diamond Creek Mill is situated at the foot of War Eagle Mountain and is serviced by 6.2 miles of paved roads from State Highway 78. It maintains year round access to the Sinker Tunnel which will facilitate underground mining of the rich veins crisscrossing the mountain above it and will provide the area population, with employment and services.

For further information, contact Mr. Richard Kaiser, Investor Relations, 757-306-6090 and/or www.silverfalconmining.com

Join the conversation about Silver Falcon Mining.

Reply

Replies

  1. A pretty poorly written press release.

    "There are three kinds of ore on the Company's properties; INFERRED resources, PROBABLE reserves and PROVEN reserves."

    What does this mean? I have inferred, probable, and proven reserves in my back yard, and the exact same amounts as SFMI does- ZERO. Who wrote this? No matter how much gold there is, you can't claim reserves of any type in any amount until proven by post-43-101 compliant drill results. Any serious investor who knows their stuff will look at this and go "What?". The whole paragraph is unnecessary. And please, stop capitalizing DORE. Although at least it wasn't called BULLION DORE. And what is the Sinker Tunnel Gold Project? Is there a separate Sinker Tunnel Silver Project?

    "With the property now secured..." Does that mean the fence is up? And "the equipment necessary for work to begin"- what equipment? Rock bolting equipment? Or drills? Big difference.

    Nice to hear they are working on the leach permit, but I had hoped this stuff would have been further along.

    As usual, much of the PR is what they are going to do or finish up, not what has been done. Let's get a press release that says what they are doing and have completed. I especially want specifics on rockbolting, drill room prep, drilling, etc., not vague references to "equipment".



    1. I believe its rockbolting equipment. I would think the arrival of the drills be in the HEADLINES--expecting it soon

      Let's see if we get pics soon of proof, what's happening and what's there. So far we have seen pics of the fence up around the Tunnel, and some of the equipment purchased and on site.

      1. It would be a huge feat if they can get the drills going instead, by years end. I have been waiting for 2 years--I care more about the drills bringing out the BONANZA and disclosing it to create a bidding war on SFMI than any applications, tailings, shipments, vaults...............

        My bet is that the feat will be ACCOMPLISHED. Come'on Pierre (Santa), give us, your shareholders, a Christmas present that we adults can drool and talk about forever.

        Show me the drills.

    2. The fence is up....16 miners are there rock bolting the tunnel as specified in previous pr's.

      We know the miners are prepping the mountain for drilling...as specified in previous pr's.

      As stated in previous pr's.... independent geologists are in place to ready the 43 101.

      I am waiting for photos showing more progress....thanks to Ouri and Bobby Joe. I am hoping we get shots of the Sinker Tunnel project.

      If we get into the small details of the press releases..it ends up being a book reading for a class. I think SFMI will allow us to investigate what the drilling consists of and how the 43 101 is written. JMHO

      My recommendation is call RK and ask him why the PRs are written the way they are. Give him your recommendations to insure clarity is given when they are written. Do I think he will listen and take advice. I am not sure....

      JMHO on the matter....

    3. Lighten up, you're nit picking. At least it shows progress. Really dig deep and try to be positive for a change... Geeez.

      1. Is it "nitpicking" to point out that the PR is misusing critical terms like reserves, or not providing any specifics about what equipment is being delivered? If one reads at the PR closely (which is something every investor should do), there is the typical lack of specifics and clarity. That's not being negative, it's being objective. Poor PRs like this are just fodder for the bashers, as can be seen on the other board right now.

        1. I just get a little tired of all the negativity.

          We all know that the PR's are poorly written, and I bet we know who writes them - he may be great at real estate, but he can't put a coherent sentence together.

          But even with a poorly written PR, we can still glean a little bit of information on progress being made. At least give them credit for that - and for trying to convey progress to us.

          What this PR tells me is that we ARE making progress.

          And, I don't agree that they need to tell us every time they take a $hit. We don't need to know when the drills are going to come in on the truck. We do want to know when they have turned and produced some results.

          And, again, who gives a rat's a$$ about the other board? I thought we were over that.

          1. PRs are bascially summaries ....that's how I see them. Photos back up the summaries. Sitting waiting for photos....

            Details are in the photos and 10Q's..8K's.....

            A few posts ago..I posted a detailed description of a cyanide leaching system....and long ago, a Flotation system.

            If I remember correctly, I posted a video of a flotation and leaching system at a mill operating in Idaho.

            If I do further DD for drilling a mountain to taking the core for results..I bet there is lots of info and videos on the subject matter.

            Press releases are summaries...JMHO..progress being made.

            1. Replying to @Garick

              I just saw a great little documentary, I think it was on Discovery, of drilling. Both in a tunnel and topside and getting the cores, analysing them and then blasting to get the ore. It happened to be a silver mine, but exactly the same process.

              This is going to be fun. Wish we could have cameras following it, but, well we know what happend the last time we had cameras...