Skip to content
Sign in

Post

Silver Standard Resources

You’re reading aitakahashi’s reply in this thread.Jump to it

Prez3.5 rating from 23 members7.9K ptsRate

Commercial Production

Today SSO announced that Pirquitas acheived "commercial production" on Dec 1st.

I am not really sure what exactly is different now, but I assume that it does mean that they feel that they can now achieve consistent and continuous production from the mine.

The recovery percentage will be down (as expected) until they have completed processing the oxide ores and start (in 1Q 2010) to process the sulphide ores that the plant was primarily built for.

Way to go SSO!

http://ir.silverstandard.com/releasedetail.cfm?ReleaseID=428266

Join the conversation about Silver Standard Resources.

Reply

Replies

  1. i hope it means that they are finally going to meet their guidance. they have reduced their 2009 production estimates from 6 to 3 and finally to 1 million ounces. i think they've finally set the bar so low that they can meet expectations. realistically, since the market is losing patience with disappointing results, i believe they have tested the ore in comparison to the feasibility study to make sure that there won't be any more surprises.