Skip to content
Sign in

Silver Tiger Metals Inc.

$SLVR · TSX

Unclaimed AGORACOM Hub
S

Silver Tiger Metals Inc.

  • CanadaTSX:SLVR
  • United StatesOTCQX:SLVTF

Silver Tiger Metals Inc. is a Halifax, Nova Scotia-based silver and gold development company with 100% ownership of the El Tigre silver-gold property in Sonora, Mexico.

Company facts

Exchange
TSX
Symbol
SLVR
Secondary symbol
SLVTF
Industry
Metals & Minerals

Company overview

TSX: SLVROTCQX: SLVTF

Silver Tiger Metals Inc.

Constructing the El Tigre open-pit silver-gold mine

Constructing El Tigre open-pit mine.First pour targeted December 2027.100% own El Tigre in Sonora, Mexico.

Silver Tiger Metals Inc. is a Canadian silver and gold developer with 100% ownership of the El Tigre property in Sonora, Mexico. It is constructing the Stockwork Zone open-pit heap leach mine and has completed a preliminary economic assessment for an underground mine at the same property. First pour at El Tigre is targeted for December 2027.

C$74.2M
Cash
US$124M
El Tigre capex
Dec 2027
First pour
558.8M
Shares out

TSX: SLVR | OTCQX: SLVTF | FSE: 1OC

The company

Halifax, Nova Scotia developer

Silver Tiger Metals

  • 100% owner of El Tigre property.
  • Sonora, Mexico.
  • Constructing open-pit heap leach mine.

It has completed a preliminary economic assessment for an underground mine at the same property. The company has no revenue.

The projects

PFS complete

El Tigre Stockwork Zone

Updated PFS: after-tax NPV US$456M, IRR 65.7%, payback 1.4 years. 10-year mine life, 43M payable AgEq oz, initial capex US$86.8M.

PEA

El Tigre Underground

After-tax NPV US$304M, IRR 42.8%, payback 2.6 years. 15-year mine life, initial capex US$83.5M, sustaining US$213.6M.

Targets

Exploration targets

North Tigre 700m north of PEA stope: 2.95Mt at 343 g/t AgEq. Lluvia de Oro 1.5km south: undrilled target.

The numbers

C$74.2M

Cash at September 30, 2026.

C$1.5M

Net loss for the three months ended September 30, 2026.

558.8M

Shares outstanding at September 30, 2026.

US$124M

El Tigre construction capital cost estimate as of September 21, 2026.

All amounts in Canadian dollars unless noted. Sources: company filings.

The last 12 months

  1. Oct 2026
    • Construction update. 285 people on site, 300,000 man-hours, detailed engineering 70% complete, US$72M committed of US$124M capex, ~US$120M cash.
  2. Oct 2026

    • C$100M financing closed. Bought deal of 100,050,000 units at C$1.00 for gross proceeds of C$100,050,000, including over-allotment.
  3. Sep 2026

    • Capex estimate raised. Construction capital cost estimate increased to ~US$124M, up ~US$37M.
  4. Sep 2026

    • Caleigh Vein drill result. Intersected 2.1m at 7.72 kg/t AgEq, including 0.53m at 29.62 kg/t.
  5. May 2026

    • TSX listing. Began trading on TSX under SLVR, moving from TSXV.
  6. Jan 2026

    • PFS and PEA released. Updated Stockwork Zone PFS (NPV US$456M) and underground PEA (NPV US$304M).
What's next

  1. Dec 2027

    • First pour. Complete commissioning and first pour at the El Tigre Stockwork Zone.Planned
  2. Planned

    • In-fill drilling. Begin in-fill drilling to advance the underground mine PEA.Planned
  3. Planned

    • Exploration drilling. Continue exploration drilling at North Tigre Mine and Lluvia de Oro target.Planned
Things to know

Things to know

  • Capital commitments of ~C$70M at Sept 30, 2026.
  • ~C$8.5M Mexican VAT receivable; collectability uncertain.
  • No interest-bearing debt; nil revenue reported.

The El Tigre construction capital cost estimate increased by ~US$37M to ~US$124M.

Leadership

Who runs the company

  • Glenn Jessome, President and CEO
  • Keith Abriel, CFO and Corporate Secretary

Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.