Skip to content
Sign in

Post

SkyHarbour Resources

You’re reading ful´o´gas’s reply in this thread.Jump to it

Prez3.6 rating from 96 members12.6K ptsRate

SKYHARBOUR ===> " GOING FOR THE GOLD ""

Red Lake Drill hole BR09-02 is at 2582 metres this morning.
Azimuth unknown.
Dip is 72.8 degrees.

Hole is going well with good production

Join the conversation about SkyHarbour Resources.

Reply

Replies

  1. Here is the latest.. direct from.... DON HUSTON.

    After just talking to him on the phone... and trying to grill him....... the mother .. won`t tell me anything ..

    With some very direct questions from me ... his only reply was..and I quote ...
    ``I won`t go there.. Ernie `

    So now.... you all have my update and all the info that I do....

    Have a have great weekend ..
        1. "You all can take this... to the'' Friggin Bank..""

          "From this day forward.. "

          Any drill stem that gets "stuck" while drilling , can now be removed with a minimum of effort and with a small loss ..of some of a the drill rod and the drill bit ..



          YES .....

          A First
          for "CYPRESS AND SKYHARBOUR"

          1. They did indeed have a small problem with the last plug and the setting of the wedge ..

            A bag of plug material , It's size sightly smaller then of the drill hole,,, is lowered and placed at the desired depth.. The wedge is then later placed, breaking the plug bag and everything begins to set up and harden in place .

            The drill rod. IMHO would have to be retrieved once again and a drill bit then attached. The drill rod would again all have to be reconnected and lowered to restart drilling..

            A problem surfaced as the wedge was found to be not secure and probably not in the right position.. They figure that the bag of plug material actually broke and started to harden up before the wedge was could be lowered and placed it the correct position,,

            Remedy is..... to stop drilling,, pull back .. and set another wedge a few meters up-hole.

            This is no doubt what has taken place this week.

            Conclusion..

            By backing up the few meters we do not have to worry about that wedge.. it has been discarded.. and that problem.. is now solved

            So this new wedge will actually be our 3rd wedge in this hole.

            Keep on drilling..

            1. Replying to @ful´o´gas

              Skyharbour has now drilled successfully around the second wedge with 5 foot core barrel on Red Lake Drill hole BR09-02.

              Chibougamau has now pulled the drill rods and attached the 10 foot core barrel and are on their way back down with it now to continue the drilling.

            2. Replying to @ful´o´gas

              Red Lake Drill hole BR09-02 is at 2671.5 metres this morning ...after having successfully drilled past the second wedge at approx. 2660 metres.


              They are now drilling in " North South Breccia Shear Zone "

              1. Replying to @ful´o´gas

                Red Lake Drill hole BR09-02 is at 2690 metres this morning.

                Chibougamau are continuing with the 10’ core barrel....able to move more water past the bit and keep hole flushed better.

                Going well...still in North South shear zone....looks like rock could be ultramafic... good sign.

                            1. Replying to @ful´o´gas

                              Keep on drilling!

                              I keep hoping to hear good news. This has been quite a project. Being new to the stockmarket, I've watched with some trepidation all the moving and shaking that's been going on in the world, but I still see this investment as a positive one!

                              1. Replying to @smallfry101

                                Red Lake wedge Drill hole BR09-02-1 is at 2005 metres this morning having successfully drilled passed wedge.


                                The azimuth is 84.7 degrees and the dip is 73.0 degrees. Will continue with 5 foot core barrel to see if hole continues to flatten and pull left before putting another wedge to deflect up.


                                The goal of this 1st w...edge hole is to re-enter the footwall of the NS Shear at approx. 100 metres higher and also have the new hole end approx. 100 metres further to the north from the mother hole

                                1. Replying to @ful´o´gas

                                  Red Lake wedge Drill hole BR09-02-1 is at 2022 metres this morning.


                                  Dip is 72.9 degrees.


                                  Chibougamau will be reaming hole before putting down another wedge to deflect hole up.

                                  1. Replying to @ful´o´gas

                                    Red Lake Wedged Drill Hole BR09-02-1 is at now 2097 metres this morning.. after 2nd wedge was set.

                                    The Dip is also 70.9 degrees.

                                    Presently, the cores show we are drilling in mafic volcanics.

                                    1. Replying to @ful´o´gas

                                      Red Lake wedge Drill hole BR09-02-1 is at 2475 metres this morning. Hole is on track... Balmer some silicification... normal for area flanking the N S Breccia Shear Zone.


                                      PLEASE ALSO NOTE.

                                      BECAUSE OF NEW REPORTING RULES . TRIMBLE AND OTHERS WILL NOW BE ADDED AS INSIDERS AND MUST REPORT ALL TRADING AS SUCH ..

                                      1. Replying to @ful´o´gas

                                        Red Lake Wedged Drill Hole BR09-02-1 is now at 2595 metres ...as of Sunday morning.


                                        The azimuth is 78.9 degrees and the dip is 69.5 degrees.

                                        Balmer volcanics along with some silicification.


                                        We could hit the North Shear Zone at any point now . The Drilling is going very well.