Skip to content
Sign in

Post

TTM Resources Inc

You’re reading BBOB72’s reply in this thread.Jump to it

Prez3.8 rating from 49 members8.8K ptsRate

As traderdad says

I will take it a step further. The mining equipment could be worth about 500 mil, if you crunch the numbers of the chu it could be worth the same about 500 mil. Put them both together and they are worth about 2 and a half times more. There you have it a large output moly mine with very little dilution.

I am not sure there are many out there who can really understand what impact this could have on our company. It is enormous.

BBOB

Join the conversation about TTM Resources Inc.

Reply

Replies

  1. BBOB - sounds like a solid plan!

    Where would the raw materials be processed?

    I believe in past posts I have read that power is close to the site. What other infrastructure is required to operate a moly mine?

    1. Lots of answers will come out in the pre-feas study. Not sure exactly how far the hydro is away as there could be 2 different ways to bring it there.

      As far as the raw materials the chu will have moly concentrate and it could be sent out as such, or to Edanko's roaster to extract the sulphur out of it.

      BBOB

      1. Bbob -- how would the concentrate be shipped from Vanderhoof. I assume by rail, but to where? What's the nearest port for overseas transportation? I'm assuming the end user will be China, Japan or other Asian steel producers, Korea perhaps.

        1. hey Tham,

          i cud probably even field that one ...

          Prince Rupert is a deep sea port at the west end of Hwy 16.

          It's currently being developed into a Super Port.

          CN has plans to upgrade the rail line from there to Edmonton.

          So if they're going to ship by sea that's the logical destination.

          There's a chance however it might be used domestically.

          There's lots of pipelines, bridges, railways, etc. to be built in N.A.

          Adanac Moly planned to ship the ore directly out w/o roasting.

          I suppose TTM has various options that no doubt will be weighed in the upcoming report, including roasting at Endako.

          One option will no doubt include trucking ore to Endako, rail to P.R. and sea to China. I wonder about the possibility of building a new roaster onsite, perhaps partially fueled by beetle-killed wood and operated by the First Nations (cogen electrical plant?). It might be far-fetched but I'd like to see that option identified anyway.

          Exciting times ahead!

          Click here for a map of the region.


          1. Thanks. that all makes perfect sense. In terms of domestic market, with this large of a resource and US economy in the tank for the near term, I imagine the Chinese might want to lock up the resource. Maybe by the time Chu is producing, the US economy will be in a position to use the moly on infrastructure projects, we'll see.

            Is the transportation cost worked into TTM's Capex or is it borne by whoever is doing the off-take?

          2. Can someone define the "roasting" proccess from raw material to moly?

            Also during this process, is there waste material that is graded out similar to gold mining?

            I'm sure there are many "What if" scenarios, but I thought that there was never an option to have on site roasters.



            1. Replying to @ATTICS

              Attics, I think this may answer your question.

              After molybdenum is mined, it goes through several more steps before being refined into Technical Molybdenum Oxide. Before the moly can be roasted, it must first be milled, dipped into a floatation cell and leached.

              First the large chunks of ore are crushed into gravel. Next, the material is ground down into powder. Molybdenum is floated into aerated tanks to produce a molybdenum sulphide concentrate. Acid leaching may be required to dissolve copper and lead impurities remaining in the material.

              And then the molybdenum sulphide is roasted in multi-level hearth furnaces at temperatures up to 650 degrees centigrade to become ‘roasted molybdenite concentrate.’ The roasting process gets rids of the sulphur. Large rakes are used to move around the concentrate to stir up the ‘exothermic’ process, against a current of heated air and gases blowing up from the bottom of the hearth. Literally, the sulphur burns itself off the molybdenite. The material starts at the top, falling down level after level, burning more sulphur off at each of about one dozen levels, until the roasted final product arrives at the bottom. The gases are scrubbed separately and converted to sulfuric acid.

              From what I know there has not been any serious discussions over having a roaster at the chu, not saying there has not been any. But with the very close proximity to TCM's roaster at Endako, (75kms) to me it would be more cost effective to ship the concentrate to Endako. But don't forget all roasting does is remove the sulphur out of the concentrate. Some moly deposits have varying amounts of sulphur in their moly. I would think that question will be answered in the upcoming metallurgy report.

              BBOB

              1. Replying to @BBOB72

                Thanks for this info!

                So with the assumption in mind that we are not setting up a roaster, would the following be true?

                Depending on the level of moly, raw ore would be crushed to gravel and then the gravel be sold depending on it's concentration level.

                or,

                The material is crushed down to powder, then shipped off for processing.

                The obvious choice is to send the material 75 km for processing, but, what would the next best scenario be if TTM becomes a mining operation without a roaster?

                Just trying to fully understand the types of scenarios that we are open to.

                Thanks again, DL



              2. Replying to @BBOB72

                BBob -- are we expecting any copper credits? I don't recall the level of copper in the drill results if indeed that was even reported. Maybe it's not significant in our case. Is there a market for the sulphuric acid? I think sulphur is used in the production of phosphate fertilizer, but I'd need to go over and reread that at the FOS website.

                1. Replying to @thamnosma

                  Hi again Tham,

                  This will likely be determined by the metallurgy report but it came up in my direct discussions and the thinking was it could provide enough revenue to basically cover the operating costs.

                  Just to clarify my earlier comment re the onsite roaster idea, this was NOT mentioned by the company or anybody else. I merely stated it was an option that I would like to see identified in the pre-feasibility report. It could be far-fetched, nevertheless, I believe it would be useful to see an analysis of that option.

                    1. Replying to @thamnosma

                      Yes, and there's definitely lots to be exciting about with respect to this company's potential.

                      TTM Resources has been blessed with motivated professionals like Crichy Clark, Terry Lyons, Tom Brady, Warren Robb and others.

                      There's no guarantees in life (if you want one, go buy a muffler), but should the company's development plan materialize, the share price will inevitably increase exponentially. (Sorry for the pump)

                      The current times are extremely difficult for many investors, Juniors exploration companies (and major financial institutions). TTM Resources is poised to break out and when it does, these bargain basement prices will be a distant sight in the rear view mirror.

                      We're all feeling the pain but try to do whatever you can to hang onto this one ... I am convinced those who hold will be handsomely rewarded, and it could be sooner than you think.

                      All IMHO. GLTA