Skip to content
Sign in

Troilus Mining Corp.

$TLG · TSX

Unclaimed AGORACOM Hub
T

Troilus Mining Corp.

  • CanadaTSX:TLG
  • United StatesOTCQX:CHXMF

Troilus Mining Corp. is a Canadian development-stage mining company headquartered in Montréal, Quebec, advancing the Troilus gold-copper project in north-central Québec on the site of a former producing mine (1996–2010).

Company facts

Exchange
TSX
Symbol
TLG
Secondary symbol
CHXMF
Industry
Metals & Minerals

Company overview

TSX: TLGOTCQX: CHXMF

Troilus Mining Corp.

Advancing the Troilus Gold-Copper Project in Quebec

Pre-construction, 26-year mine life.US$850M debt commitment received.478 Mt reserves at 0.44 g/t gold.

Troilus Mining Corp. is a Canadian development-stage mining company advancing the Troilus gold-copper project in north-central Québec, on the site of a former producing mine. The project outlines a 50,000 tpd open-pit operation with a 26-year mine life. Permitting, detailed engineering and project financing are underway.

US$1.43B
Initial capex
US$850M
Debt commitment
478Mt
Reserves
554.8M
Shares out

TSX: TLG | OTCQX: CHXMF | FSE: CM5

The company

Advancing a former producing gold-copper mine.

Troilus Mining Corp.

  • Development-stage mining company
  • Located in north-central Québec
  • Former producing mine (1996–2010)

The company is pre-construction, with permitting, detailed engineering and project financing under way. It is headquartered in Montréal, Quebec.

Formerly Troilus Gold Corp.

The projects

Two key areas on the 435 km² land package.

Key projects

Main project

Troilus Gold-Copper Project

Large-scale open-pit project with approximately 26-year mine life at 50,000 tpd, based on 478 Mt of reserves. After-tax NPV5% of US$3.2B and 22% IRR.

Discovery

West Rim Zone

Near-surface high-grade gold zone discovered in 2024, outside current resource and within 200 m of the reserve pit. Recent drilling returned 6.93 g/t AuEq over 18.5 m.

The numbers

Snapshot of capital, debt and reserves.

Financial and technical highlights

Key figures from the September 2026 technical report and recent financing milestones.

US$1.43B

Initial capital cost, September 2026 technical report

US$850M

Debt commitment from KfW IPEX-Bank and Société Générale, part of US$1.1B package

478Mt

Proven and Probable Mineral Reserves grading 0.44 g/t gold, 0.05% copper and 0.92 g/t silver, effective 2025-12-31

554.8M

Common shares outstanding, as of 2026-06-11

All figures as reported by the company in its technical report and news releases.

The last 12 months

Key developments over the past year.

Recent milestones

  1. Nov 2026
    • Z87 hangingwall hit. Company reported 1.33 g/t AuEq over 34 m, including 3.08 g/t AuEq over 12 m.
  2. Sep 2026

    • US$850M debt commitment. Credit-approved commitment letter from KfW IPEX-Bank and Societe Generale for US$850 million, part of planned US$1.1 billion package.
  3. Sep 2026

    • Updated technical report. Report outlined 26-year mine life, after-tax NPV5% of US$3.2 billion, 22% IRR and initial capital of US$1.428 billion.
  4. Jun 2026

    • West Rim drill results. Reported 6.93 g/t AuEq over 18.5 m, including 19.06 g/t AuEq over 6.4 m, from zone outside current resource and within 200 m of reserve pit.
  5. Jun 2026

    • Power allocation secured. Received full power allocation from Hydro-Québec and Quebec's Ministère de l'Économie, de l'Innovation et de l'Énergie; website cites secured 70 MW.
  6. Nov 2025

    • C$172.5M equity raise. Closed bought deal public offering, including full exercise of over-allotment option.
What's next

Planned activities as stated by the company.

Next steps

  1. Ongoing

    • Complete financing package. Focus on completing broader financing package to reach final investment decision and financial close, while advancing permitting, detailed engineering and procurement.Planned
  2. Ongoing

    • Advance detailed engineering. Advancing through Detailed Engineering after completing Basic Engineering across full project scope.Planned
  3. 2026

    • 40,000 m drill program. 2026 exploration program includes a 40,000 m drill campaign.Planned
Things to know

Key considerations

  • US$850M commitment subject to conditions, including ECA approvals.
  • US$250M EDC contribution still subject to approval.
  • Reserve estimate effective Dec 31, 2025, excludes 2026 drilling.
  • Initial capex includes capitalized costs and revenues, excludes sunk costs.

Investors should be aware of financing conditions and reserve estimate timing.

Leadership

Who runs the company

  • Justin Reid, Chief Executive Officer
  • Marty Rendall, Chief Financial Officer (effective March 1, 2026)
  • Chantal Lavoie, Chair of the Board

Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.