Just checked the weather models. Finally it looks mighty cold in yellowknife area. This is good. If the cold continues it should allow Tyhee to get their shipments, Diesel etc. over the lake route...
We are all aware that the intricacies in incorporating a mining plan for the Nicholas Lake Main Zone have delayed the PA. Also note that Tyhee are using five separate engineering firms for this report, each using some outside consultants.A delay by one of these guys delays everyone else. In the past a PA used to be a 1 week assessment called a scoping study.It was done by a qualified engineer with many assumptions.It was a ball park assumption that came up with a go/no go result, that could lead to a pre-feasibility study.Today I am told that Tyhee's PA has so many engineered inputs it looks like a bankable feasibility study.
Have you been fortunate enough to continue accumulating in .40s. I think the days are numbered for such a low share price. I see market moving news in the coming months followed by JP interviewing DW on the FSN. JMHO
Just in case you were wondering what happened to the bulk sample..
Remember in winter 2006/2007 Tyhee crushed 300 tonnes and shipped a 10 tonne bulk sample. Dave talks about this in the video. Well now Tyhee have completed some tests on the sample: to determine the optimal grind size for recovery purposes; to determine power consumption to achieve this grind; to establish reagent consumption rates; to determine tailings chemistry. They are also continuing to test to optimize the cyanide destruct parameters.These results will be disclosed in the PA.
Its -2 here with around 6 inches of snow and the majority of the country has come to a stand still. Chinese new year is next week with many of the countryside folk heading home China is in chaos. 600000 people waiting to go home at Beijing main train station!