Just in case you were wondering what happened to the bulk sample..
Remember in winter 2006/2007 Tyhee crushed 300 tonnes and shipped a 10 tonne bulk sample. Dave talks about this in the video. Well now Tyhee have completed some tests on the sample: to determine the optimal grind size for recovery purposes; to determine power consumption to achieve this grind; to establish reagent consumption rates; to determine tailings chemistry. They are also continuing to test to optimize the cyanide destruct parameters. These results will be disclosed in the PA.