The Article, "Tyhee plans for gold mine" Has Some Inaccuracies.

The Article, "Tyhee plans for gold mine", from The Northern News Services (see below), has some inaccuracies, according to what Dave Webb indicated to me today.

When and if I find out what those inaccuracies are, with Dr. Webb's permission, I'll post them.

Cheers,

Baires



"Guy Quenneville
Northern News Services
Published Wednesday, November 5, 2008

SOMBA K'E/YELLOWKNIFE - With a significant increase in resources at its Yellowknife Gold Project in the wake of recent drilling, Tyhee Development Corp. is beginning work on a pre-feasibility study for the future mine located 90 km north of Yellowknife.

Drilling at the site this spring has increased the total estimated amount of gold to 1.6 million ounces - up from 324,000 ounces in the previous estimate.

"We had drilled a lot in 2007 but we were missing a gap, so we had to wait until the swamp was solidly frozen to get those holes drilled," said David Webb, president and CEO of Tyhee.

The Yellowknife Gold Project comprises three deposits: Ormsby, which accounts for 75 per cent of the resources and where 350 holes have been drilled so far, Nicholas Lake (150 holes drilled; 20 per cent of the resources) and Bruce Lake (50 holes and five per cent of the resources).

The promising resource estimate means the project can now begin work on a pre-feasibility study. But Tyhee is not eager to publicize that, concerned that such announcements will bring with them a host of expectations from possible stakeholders.

"If I say we're doing a pre-feasibility study, the next question is, 'OK, when will that be finished?' I don't have an answer for that," said Webb.

Instead, the company will, like most other companies, conduct work on a pre-feasibility study (which includes cost estimates for building the mine, as well as a revised mine life) and, when it's fairly certain of the results, move into a feasibility study and only then publish the results, said Webb.

"The industry standard approach - that's what we're doing," he said.

But there are some aspects of the project, albeit tentative in nature, that Webb can talk about.

He estimated the Yellowknife Gold Project, which will begin as an open-pit mine before phasing underground as well, will have a mine life of at least seven years. Not even Con Mine and Giant Mine, both of which operated for far longer than seven years, had a reserve base of two million ounces.

Webb said between 160 and 200 full-time workers will be needed to work the mine and double that number will be needed for actual construction of the mine.

A baseline environmental study was submitted to the Mackenzie Land and Water Board last year, and when the company decided to make the project a combination open pit-underground mine, it re-submitted the study again.

This past summer, the company did a lot of environmental work on site, collecting numerous water samples.

Webb estimated 75 per cent of the staff on site came from Yellowknife, Dettah, Ndilo, Tulita and Behchoko.

He said getting people from the affected communities - namely Yellowknife, Dettah and Ndilo - proved difficult."

Join the conversation about Tyhee Gold Corp.

Reply

Replies

  1. Here are the inaccuracies (paraphrased) in the The Northern News Services (see below) that Dave Webb communicated to me today:

    In the sentence is inaccurate,“….Tyhee Development Corp. is beginning work on a pre-feasibility study for the future mine located 90 km north of Yellowknife.” Tyhee is, in fact, advancing towards production, and much of what is now being done are components of, or are required for a prefeasibility or feasibility study.

    In the fifth, sixth etc. paragraphs one is led to believe Tyhee would complete a prefeasibility and then move on to a feasibility study. In fact, when Tyhee’s current studies on the resource, engineering, environment, permitting etc., are completed, Tyhee may well decide to move straight to a Feasibility Study. (Note: The major difference between a PF and F study is the level of detail and what financers ask for.)

    It is also worth noting that webb reminded me that there is no requirement to do one, both, or either to bring a mine into production and there is no hard and fast manual that describes what each study is, only what is “generally” described. Each and every aspect of the PA, PF and F studies contain words like “in the (geologist’s, engineer’s, metallurgist’s) opinion. These are quantitative studies with subjective determinations.

    Webb was quoted in the article as having said that 75% of our staff came from the affected communities. But, what he meant to have said was that 75% of Tyhee's non-technical staff came from the affected communities. The small native villages don’t have too many geologists or engineers, not even many university students to hire.

    Cheers,

    Baires

    1. It's funny (not) how the Bre-X scandal changed the world of investment in juniors. One side of me is very happy to see checks and balances that I can look at as an investor and base decisions on. The other side is a little discouraged when I look at how much more expense is typically gone to in order to justify a mine.

      There was a time when you could just do it. Make it happen if you could find the money. Now, it's very unlikely to find all the money without jumping through the hoops. Would be great if we could just make a mine happen without a feasibility, but it won't happen. I imagine even the Territorial Government wants to see one done to base their community planning around.

      MR