Skip to content
Sign in

Post

Tyhee Gold Corp.

You’re reading skeleg’s reply in this thread.Jump to it

Prez3.7 rating from 152 members49.1K ptsRate

Did Interinvest Halt Its Weekly Purchases of Tyhee Shares? Tune in tomorrow.

It seems no Tyhee shares were bought by Interinvest this week, well except, maybe today they'll buy. I'll check again tomorrow.

Ps. It used to mean something material was brewing at Tyhee when insider trading was halted.

http://www.canadianinsider.com/node/7?ticker=tdc

Join the conversation about Tyhee Gold Corp.

Reply

Replies

  1. I suspect they halted because they were bidding at 10 cents (keeping a floor under the SP). We've run out of sellers at 10 cents so no one is meeting their bid.

    1. What's far more important is when those sellers decide that it is time to let the share price rise, and stop selling into any buying pressure.

      It could be now, but I suspect they won't make that determination until July.

      As for the Ice Road, not cold enough for secondary (tyhee route) to be fully opened (36") but loads are about to be able to go all the way up to tyhee camp.

      I hope to see a news release if and when that additional equipment makes it up the Ice Road. Hope for colder conditions.

      Notice
      Nuna Logistics advises that as of 8:20 p.m on February 16th, 2012 the TCWR allowable load weights were bumped to 36” which corresponds to 81.4% of full weight capacity. The warmer then normal temperatures have affected ice growth this year and maintenance crews continue to work to build ice in weaker areas. This practice will continue until we reach full load capacity.

      General Summary

      As of 10:30AM, 16 February, a total of 31,602 tonnes of cargo (1590 loads) had departed Yellowknife, heading north on the Winter Road. Daily trucking averages during this time frame have been 138 loads per day. The current allowable load weights now correspond to 35” of minimum ice thickness chart.

      Ice conditions remain favourable throughout the entire load. The appearance of surface cracks along the route is a normal occurrence, as the ice sheet continues to deflect and compress from the traffic flow. Road maintenance crews are conducting daily visual inspections and applying flooding where necessary to repair and build the ice sheet. The current forecast of lower than seasonal temperatures may slow targeted ice growth over the next few days.

      Portions of the road width may temporarily be reduced, while the flood crews conduct their work. Drivers must remain vigilant and alert to the presence of maintenance crews working on the road. These areas are always well marked and speed limits will be posted. A notice reminding truckers to stagger their alignment along the WR lanes has been posted. This alignment preserves the ice surface and prevents rapid ice deterioration. YK Dispatch office and Lockhart Lake camp will continue to post bulletins on the roadway ice condition. Notice will also be distributed to all carriers.

      Primary Road

      Dome Lake Segment (120 km)
      The loaded lane is in good shape with some normal cracking. Unless posted as closed, all express lanes are open within this section of the WR. Maintenance crews are conducting tight blading and flooding along all portions of the route. Drivers must be alert of the water run-off along Portage 11. Maintenance crews within this area working on a solution to minimize the effects. Flood crews are focussed on repairs to the ice surface.

      Drivers should be aware of periods of increased congestion at the Meadows.

      Lockhart Lake Segment (165 km)
      The load lane is in good shape with normal cracking. Unless posted as closed, all express lanes are open within the section of the WR. Profilers continue to focus on identifying areas of slow ice growth along the loaded lane and express lane. Road Maintenance crews are focussed on all the portages, repairing ice cracks, and flooding areas to support ice growth.

      Lac de Gras Segment
      The loaded and express lanes are in good shape. Road maintenance crews are tight blading north to south along the lanes. Portage crews are conducting maintenance and the flood crews will continue with surface repairs.

      Drivers need to continue to be aware of the pressure ridges along MacKay Lake. Speed and spacing needs to be closely monitored within these defined areas.

      Secondary Route - Prosperous Lake to Gibbs Lake

      Dispatch trailer was set up at Prosperous Boat Launch and is now operational. Signage installations were completed in preparation for opening to southbound empty trucks.

      Sanding material was staged at Tyhee and sanding of required sections was carried out in preparation for road opening.

      Flood crews continued to work on low ice areas on both southern and northern sections and despite warm temperatures were able to achieve targeted minimums for road opening.

      Maintenance crews carried out general maintenance, portage improvements and tight blading on Prosperous.

      The road from Prosperous boat launch to NTPC Bluefish was opened for two way hauling on February 12th to a posted weight limit allowance of 26”. The weight limit for this section was increased to 29” on February 15th.

      Three line profiling of the entire route was completed and 29” minimum recorded for road opening.

      The Secondary Route was opened to southbound empty truck traffic at 8 am on February 15th.

      YK Dispatch

      Dispatch operations are function well. A total of 21,388 tonnes (825 loads) were dispatched during this reporting period.

      The Next Seven Days

      Primary Road
      The main effort for the next seven days will continue to be active profiling along areas on minimum ice growth, and road surface maintenances to all portion of the loaded and express lanes.

      Load increases will continue to be promulgated by the Yellowknife Dispatch office as minimum ice thicknesses increase.

      Secondary Route
      Maintenance crews will carry out routine route maintenance, sanding and improvements. A night shift will be on duty with an on call recovery truck. Periodic profiling will be carried out to monitor ice thicknesses.

      1. What happens if it never gets cold enough and roads never open up for access to Tyhee camp?

        Has this ever happened in the past?

        Is this a huge risk for Tyhee? If not, how big of a risk and how many days, months, years does it push back production.

        Thanks...

        1. The ice road has been poor back in 2006, and a huge amount of stuff had to be airlifted at great expense to the Diavik Diamond mine. For tyhee, they are ahead of the curve on fuel, with a massive quantity still in the tanks, but getting a heavy dumptruck up there is the goal this year. I think they will be fine. But when they haul all the stuff up to build the mine, a warm winter could be a real problem.

          The only alternatives are heavy lift helicopter for mining equpment broken into parts, trucks on the ice road, or fixed wing airlift (limited size, very expensive).

          So let's hope that when the time comes, we have a "normal" minus 30 to minus 40 Centigrade winter and a cold ice road.

          GS

            1. Replying to @BAIRES2

              Sure, Baires, a road would be wonderful. But I don't expect to see it in time for construction. Once a mine is up and a road pushes down to Clan, after Clan is added to the permits (not yet started), then the distances get shorter.

              On another note, what's with all the stupidity on this forum lately?

              People must be bored.

              GS

                1. Replying to @BAIRES2

                  Yeah, but the size of equipment was much smaller in those days. Even the modest sized trucks and equpment Tyhee needs for the open pit is far larger than the small stuff used underground mining.

                  If there are two bad years in a row for the ice road, there will be some discussion of permanent road to the north that helps tyhee and many others.

                  GS

                2. Replying to @BAIRES2

                  Yeah, but the size of equipment was much smaller in those days. Even the modest sized trucks and equpment Tyhee needs for the open pit is far larger than the small stuff used underground mining.

                  If there are two bad years in a row for the ice road, there will be some discussion of permanent road to the north that helps tyhee and many others.

                  GS

              1. Replying to @racmar

                That was a great link, Rac, but things take so long to get through all the airworthiness approvals for an Operating Certificate. I think Discovery Air, if they achieve this, will take more than just 2 years.

                Imagine one of them just plucking up a sea container and hauling it up to Tyhee in the middle of the summer. That would be great!

                LTA ships would be great for the arctic, hauling heavy equipment year round and as the crow flies. The only problem is what to do with them in high winds, which occur routinely in the Arctic. A hangar the size of the one down in San Diego is not an option, far too expensive. So a rugged airship than can be tied down in high winds will be quite a challenge.

                I hope they succeed, but won't hold my breath.

                GS

              2. Replying to @racmar

                That was a great link, Rac, but things take so long to get through all the airworthiness approvals for an Operating Certificate. I think Discovery Air, if they achieve this, will take more than just 2 years.

                Imagine one of them just plucking up a sea container and hauling it up to Tyhee in the middle of the summer. That would be great!

                LTA ships would be great for the arctic, hauling heavy equipment year round and as the crow flies. The only problem is what to do with them in high winds, which occur routinely in the Arctic. A hangar the size of the one down in San Diego is not an option, far too expensive. So a rugged airship than can be tied down in high winds will be quite a challenge.

                I hope they succeed, but won't hold my breath.

                GS

              3. Replying to @racmar

                Wow, it looks like the past zeplan with a Sceince fiction twist. The payload is the ticket and appears to be the answer to our prayers. Talked with Hansix he just sent the info off to GT and will post his response.