Skip to content
Sign in

Post

US Gold

You’re reading mergatroyd’s reply in this thread.Jump to it

Prez3.9 rating from 176 members24.1K ptsRate

US Gold: El Gallo Extended in Multiple Directions

Recently Discovered Veins Highlight Additional Upside Potential

New Bulk Tonnage-Near Surface Mineralization Discovered

Mar. 8, 2011 (Marketwire Canada) --

TORONTO, ONTARIO -- US GOLD CORPORATION (NYSE:UXG)(TSX:UXG) is pleased to announce continued exploration success at and surrounding the company's El Gallo project in Sinaloa State, Mexico (Fig. 1). Drilling continues to expand the size of the silver-gold resources and further delineate the mineralization associated with the recently discovered veins. In addition, exploration has intersected near surface, bulk tonnage mineralization in a new area.

EXPLORATION HIGHLIGHTS

1) El Gallo Developments:

  • Main Zone extended 60 meters east and 50 meters to the southeast (Fig. 2). Intersections include: 233.3 gpt silver over 12.4 meters, 515.6 gpt silver over 3.2 meters and 77.9 gpt silver over 17.2 meters.
  • Infill drilling, designed to upgrade inferred mineralization to measured and indicated categories returns: 1,204.8 gpt silver over 1.1 meters, 76.9 gpt silver over 21.8 meters and 116.3 gpt silver over 13.0 meters.
  • El Gallo feasibility study and mine permit submittal remain on track for year-end.

2) New Veins Deliver Continued Success:

  • Alamo high grade gold extended at depth: 27.2 gpt gold over 1.0 meter and 5.9 gpt gold over 6.0 meters, including 13.7 gpt gold over 1.5 meters.
  • Chapotillio near surface mineralization extended east and north, returning: 114.9 gpt silver, 1.4 gpt gold over 5.9 meters and 72.2gpt silver, 0.8 gpt gold over 9.5 meters. Intersections starting at or near surface.

3) New Bulk Tonnage Discovery

  • Haciendita new near surface, bulk tonnage discovery: 2.1 gpt gold, 31.1 gpt silver over 16.4 meters and 1.0 gpt gold and 16.4 silver over 34.1 meters.

EL GALLO AND DISTRICT EXPLORATION

US Gold's exploration at and around El Gallo is focused on: 1) increasing the size of the silver-gold resources, 2) upgrading inferred mineralization to the measured and indicated categories, 3) delineation of new veins around El Gallo in order to include them in the updated resource estimate, and 4) discovering El Gallo style mineralization within hauling distance of the proposed process facilities. Nine drills are operating at the project and four more are scheduled to arrive in the coming weeks. US Gold has budgeted $15 million for drilling in Mexico during 2011.

El Gallo Mineralization Expanded in Multiple Directions (Fig. 1 and 2)

Drilling at El Gallo is focused on growing the size of the resource and infilling select areas of the deposit. The expansion holes successfully extended the known mineralization 60 meters east and 50 meters to the southeast. The potential to further extend the mineralization in each of these directions looks encouraging. Follow up drilling is in progress.

The infill drilling, which continues to meet expectations, was designed to upgrade inferred mineralization to the measured and indicated categories for feasibility study purposes.

Hole # Silver Length From Silver Length From
(gpt) (meters) (meters) (opt) (feet) (feet)
Expansion
GAX-269 86.1 13.0 102.2 2.5 42.7 335.3
GAX-274 65.9 13.7 0.0 1.9 44.9 0.0
Including 113.6 4.1 0.0 3.3 13.5 0.0
GAX-282 61.8 10.9 30.7 1.8 35.8 100.7
And 233.3 12.4 123.4 6.8 40.7 404.9
including 509.6 3.5 127.3 14.9 11.5 417.7
GAX-285 515.6 3.2 42.6 15.0 10.5 139.8
GAX-290 77.9 17.2 130.8 2.3 56.4 429.1
Including 456.0 1.2 130.8 13.3 3.9 429.1
Infill
GAX-270 108.6 6.2 14.3 3.2 20.3 46.9
And 292.2 2.3 43.5 8.5 7.5 142.7
GAX-271 76.9 21.8 45.7 2.2 71.5 149.9
Including 140.2 8.5 52.6 4.1 27.9 172.6
And 116.3 13.0 109.0 3.4 42.7 357.6
Including 801.1 1.2 117.5 23.4 3.9 385.5
GAX-284 1,204.8 1.1 78.5 35.1 3.6 257.5

Alamo Vein – High Grade Gold Encountered at Depth (Fig. 1 and 3)

Alamo is one of several new veins that were discovered late in 2010. The initial holes released in December returned encouraging results such as 9.3 gpt gold over 1.7 meters and 7.6 gpt gold over 1.7 meters. Follow-up drilling has successfully extended the higher grades by 30 meters at depth. The zone has been extended from surface to 125 meters and indentified over a strike length measuring 550 meters. Highlights from the drilling are shown below.

Hole # Gold Length From Gold Length From
(gpt) (meters) (meters) (opt) (feet) (feet)
SJX-014 27.2 1.0 54.9 0.79 3.3 180.1
SJX-015 5.9 6.0 85.0 0.17 19.7 278.9
Including 13.7 1.5 89.5 0.40 4.9 293.6

Chapotillo – Near Surface Mineralization Expanded (Fig. 1)

Since returning positive drill results in 2010, exploration has been focused on extending the near surface mineralization. Drilling 50 meters east and up-dip of the known mineralization continues to show the zone is expanding in size. Mineralization encountered in the most recent holes remains near surface and there appears to be good expansion potential. On-going drilling will continue to test for possible extensions. US Gold plans to incorporate Chapotillo in the next updated resource.

In addition, hole GAX-023 successfully tested a geochemical anomaly 700 meters to the southeast. This result highlights further upside potential at Chapotillo.

Hole # Silver Gold Silver Eq.* Length From Silver Gold Silver Eq.* Length From
(gpt) (gpt) (gpt) (meters) (meters) (opt) (opt) (opt) (feet) (feet)
CHX-016 114.9 1.4 169.7 5.9 0.6 3.4 0.04 4.9 19.4 2.0
Including 278.0 3.9 434.8 1.6 2.5 8.1 0.11 12.7 5.2 8.2
And 72.2 0.8 105.1 9.5 14.0 2.1 0.02 3.1 31.2 45.9
Including 219.4 3.2 347.6 2.1 21.4 6.4 0.09 10.1 6.9 70.2
CHX-017 75.7 1.8 147.0 8.9 34.9 2.2 0.05 4.3 29.2 114.5
Including 192.6 6.5 452.4 2.0 34.9 5.6 0.19 13.2 6.6 114.5
And 85.4 0.8 116.0 5.6 53.0 2.5 0.02 3.4 18.4 173.9
CHX-023 84.5 0.4 101.6 4.2 8.9 2.5 0.01 3.0 13.8 29.2
*Silver:Gold Ratio (40:1)

Haciendita – New Discovery Showing Bulk Tonnage Potential

Drilling 10 km north of El Gallo has returned wide intersections of lower grade on a new prospect called Haciendita. A total of 10 holes were completed over an area 100 meters x 150 meters. The average grade weighted average of these holes was 0.9 gpt gold and 17.4 gpt silver over 15.7 meters, occurring approximately 25 meters below surface. US Gold believes Haciendita has good potential: 1) the mineralization is near surface and shallow dipping, 2) the zone is open and appears to be thickening to the east, and 3) the area could potentially be mined by open pit and transported to the planned heap leach facility at El Gallo.

Eight additional holes are currently being drilled. Should the results meet expectations, US Gold will begin a series of column tests to determine the ores leachability. Gold deposits in Mexico of similar grade and depth have proven to be low cost operations (Goldcorp's Los Filos Mine – 0.6 gpt gold and Capital Gold's El Chanate Mine – 0.7 gpt gold).

Hole # Gold Silver Length From Gold Silver Length From
(gpt) (gpt) (meters) (meters) (opt) (opt) (feet) (feet)
HCX-001 1.1 33.7 7.0 42.3 0.03 1.0 23.0 138.8
HCX-002 0.7 8.9 21.0 40.0 0.02 0.3 68.9 131.2
HCX-003 0.5 6.7 27.8 35.1 0.01 0.2 91.2 115.2
HCX-004 0.8 105.1 4.1 14.5 0.02 3.1 13.5 47.6
And 0.7 6.4 16.3 48.3 0.02 0.2 53.5 158.5
HCX-005 0.8 7.1 21.7 52.6 0.02 0.2 71.2 172.6
HCX-006 2.1 31.1 16.4 6.9 0.06 0.9 53.8 22.6
Including 6.3 42.3 2.9 9.2 0.18 1.2 9.5 30.2
HCX-008 2.7 27.9 3.3 0.0 0.08 0.8 10.8 0.0
HCX-009 1.0 16.4 34.1 28.6 0.03 0.5 111.9 93.8
Including 5.7 28.5 2.8 37.5 0.17 0.8 9.2 123.0
HCX-010 0.7 28.7 15.3 21.4 0.02 0.8 50.2 70.2

Feasibility Study and Permitting Update

Since releasing the El Gallo Preliminary Economic Assessment on February 7th, US Gold has advanced work related to the projects feasibility study and mine permitting.

  1. Feasibility Study
  • Ausenco Solutions Canada Inc. from Vancouver have been contracted to assist with developing the El Gallo feasibility study. Ausenco personnel who will be involved in the feasibility have worked on other notable projects such as Andean's Cerro Negro project in Argentina and Ivanhoe Mines' Oyu Tolgoi project in Mongolia.
  • SRK Consulting and Itasca Consulting Group Inc. have been retained to perform studies to determine pit slope stability that will help determine the project's strip ratio and also the location of the proposed process facilities. Approximately half of the required work has been completed.
  • An expanded infill drill program is underway at both El Gallo and Palmarito to upgrade inferred mineralization to the measured and indicated categories.
  • Half of the proposed grinding tests for the mill and heap leach have been completed by SGS Mineral Services in Durango, Mexico.
  • On-going bottle roll testing is being carried out on the different mineral zones in order to better quantify the expected mill recoveries. Two additional column tests are in progress to help determine heap leach recoveries. Column tests are completed or in progress on seven composites, and an additional three composite tests are planned. SGS Mineral Services is also performing these tests.
  • Feasibility is expected to be completed by year-end.
  1. Mine Permitting
  • Heuristica Ambiental, environmental consultants of Sonora, Mexico has been engaged to complete the required environmental studies to mine and process ore at El Gallo. Heuristica Ambiental's previous work included the successful permitting of Coeur d'Alene's Palmarejo silver-gold mine in Chihuahua State, Mexico. Baseline environmental studies commenced last December.
  • Permit application is expected to be completed in conjunction with the feasibility study.

ABOUT US GOLD ( www.usgold.com )

US Gold's goal is to qualify for inclusion in the S&P 500 by 2015. US Gold explores for gold and silver in the Americas and is advancing its El Gallo Project in Mexico and its Gold Bar Project in Nevada towards production. US Gold has a strong treasury with approximately $105 million in cash and gold and silver bullion. The Company's shares are listed on the New York (NYSE) and the Toronto Stock Exchange (TSX) under the symbol UXG, trading 1.4 million shares daily during the past twelve months. US Gold's shares are included in S&P/TSX and Russell indices and Van Eck's Junior Gold Miners ETF.

This news release has been viewed and approved by John Read, CPG, US Gold's consulting geologist, who is a Qualified Person as defined by National Instrument 43-101 and is responsible for program design and quality control of exploration undertaken by the Company at its Mexican exploration properties.

Samples from the core drilling were split on-site at the Company's Magistral Mine property. One quarter of the split drill core was shipped to ALS Chemex for sample preparation and analysis by 4-acid digestion with ICP determination for silver and fire assay for gold. Samples returning greater than 10 ppm gold were re-analyzed using gravimetric fire assay. Standards and blanks were inserted every 20 samples.

All holes were drilled with HQ bits and reduced to NTW where required. Samples were taken based on lithologic and/or mineralized intervals and vary in length. The true width of the mineral zone has not yet been determined.

Certain statements contained herein and subsequent oral statements made by and on behalf of the Company may contain "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements may be identified by words such as "intends," "anticipates," "believes," "expects" and "hopes" and include, without limitation, statements regarding the Company's results of exploration, plan of business operations, potential contractual arrangements, receipt of working capital, anticipated revenues and related expenditures. Factors that could cause actual results to differ materially include, among others, those set forth in the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2009 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors". Most of these factors are outside the control of the Company. Investors are cautioned not to put undue reliance on forward-looking statements. Except as otherwise required by applicable securities statutes or regulations, the Company disclaims any intent or obligation to update publicly these forward looking statements, whether as a result of new information, future events or otherwise.

To view Table 1, please visit the following link: http://media3.marketwire.com/docs/uxg0308table1.pdf.

To view Figure 1, please visit the following link: http://media3.marketwire.com/docs/uxg0308fig1.pdf.

To view Figure 2, please visit the following link: http://media3.marketwire.com/docs/uxg0308fig2.pdf.

To view Figure 3, please visit the following link: http://media3.marketwire.com/docs/uxg0308fig3.pdf.

US Gold Corporation
Senior Vice-President
(647) 258-0395 or Toll Free: (866) 441-0690
(647) 258-0408 (FAX)


US Gold Corporation
99 George Street, 3rd Floor
Toronto, ON M5A 2N4

[email protected]
www.usgold.com

Join the conversation about US Gold.

Reply

Replies

  1. US Gold Appoints William Faust Chief Operating Officer

    Jul 27, 2011 9:20:00 AM

    TORONTO, ONTARIO--(Marketwire - July 27, 2011) - US GOLD CORPORATION (NYSE:UXG)(TSX:UXG) is pleased to announce the appointment of William Faust as Chief Operating Officer, effective August 1, 2011. Mr. Faust will direct US Gold's mining operations in Mexico and Nevada, including the development, construction and operation of the El Gallo and Gold Bar projects. Mr. Faust has over 30 years of engineering and management experience, particularly in open pit mining in Mexico and the Western United States.

    Mr. Faust most recently served as Senior Vice President and Chief Operating Officer of Crystallex International. Prior to his tenure at Crystallex he served as Vice President Operations for Nevada Pacific Gold and was also President of Pan American Silver's Mexican operations, in charge of expanding the La Colorada underground silver mine in Zacatecas. From 2001 to 2003 he was Vice President, Operations at Corner Bay Silver where he led the development of the Alamo Dorado open pit silver mine in Sonora, Mexico.

    As Vice President Operations of Eldorado Gold from 1997 to 2001, Mr. Faust was in charge of two operating mines in Mexico and Brazil with over 700 employees producing 180,000 ounces of gold annually. Mr. Faust previously held a number of operating and engineering roles with companies in Nevada and elsewhere.

    A Vietnam veteran, Mr. Faust also served in the US Navy and more recently the Navy Reserve, where he held various positions over a 26-year career. As Navigator aboard the USS Wichita, Mr. Faust supervised the 10-man Navigation Department in safe navigation of the Pacific Ocean. As an engineering officer aboard the USS Navasota, Mr. Faust was in charge of a 40-man electrical, auxiliaries and fuel transfer division. In 1999, Mr. Faust retired as a Captain (O-6).

    Mr. Faust is a Registered Professional Engineer in New Mexico, and holds an MBA Finance, Management from Western New Mexico University, a BS, Mining Engineering from New Mexico Tech and a BS, Civil Engineering from the University of New Mexico.

    The board and management of US Gold are pleased to welcome Mr. Faust to the company as we continue to grow.

    ABOUT US GOLD (www.usgold.com)

    US Gold's objective is to qualify for inclusion in the S&P 500 by 2015. US Gold explores for gold and silver in the Americas and is advancing its El Gallo Project in Mexico and its Gold Bar Project in Nevada towards production. US Gold's shares are listed on the NYSE and the TSX under the symbol UXG, trading 1.9 million shares daily during the past twelve months. US Gold's shares are included in S&P/TSX and Russell indices and Van Eck's Junior Gold Miners ETF. Rob McEwen, Chairman and CEO, owns 20% of the shares of US Gold. On June 14, 2011 the Company announced that Mr. McEwen proposed to combine the Company with Minera Andes Inc to create a high growth, low-cost, mid-tier silver producer focused on the Americas.

    Certain statements contained herein and subsequent oral statements made by and on behalf of the Company may contain "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements may be identified by words such as "intends," "anticipates," "believes," "expects" and "hopes" and include, without limitation, statements regarding the Company's results of exploration, plan of business operations, potential contractual arrangements, receipt of working capital, anticipated revenues and related expenditures. Factors that could cause actual results to differ materially include, among others, those set forth in the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2010 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors". Most of these factors are outside the control of the Company. Investors are cautioned not to put undue reliance on forward-looking statements. Except as otherwise required by applicable securities statutes or regulations, the Company disclaims any intent or obligation to update publicly these forward looking statements, whether as a result of new information, future events or otherwise.

    1. US Gold Corporation: El Gallo Infill Drill Results & High Grade Mineralization Discovered South of Resource
      TORONTO, ONTARIO--(Marketwire - Aug. 11, 2011) - US GOLD CORPORATION (NYSE:UXG)(TSX:UXG) is pleased to announce assay results from several different areas at the El Gallo Project, located in Sinaloa State, Mexico, including: 1) infill drilling to the east, 2) an emerging high-grade zone to the southwest and 3) the Gold Zone.

      1) El Gallo Infill Drill Results

      Recent drilling at El Gallo has been focused on the eastern limits of the deposit (Fig. 2). The objective was to increase the confidence associated with the inferred mineralization, which is expected to upgrade this portion of the resource to the measured and indicated categories and help establish a reserve for preparation of the ongoing feasibility study.

      Four holes, shown in the table below, were drilled inside the proposed pit design. Holes GAX-349 and GAX-351 successfully confirmed the presence of the inferred mineralization and help demonstrate the impressive grades and thicknesses associated with the Main Zone.

      Holes GAX-318 and GAX-333 were drilled with the objective of converting lower grade inferred mineralization. These holes encountered higher grades than anticipated. The original production study contemplated sending this mineralization to the heap leach pad, but with the increased grade, the mineralization would likely be processed at the mill, where higher silver recoveries and enhanced margins are expected.

      --------------------------------------------------------------
                   Silver   Length     From    Silver Length    From
      Hole #        (gpt) (meters) (meters)     (opt) (feet)  (feet)
      -------------------------------------   ----------------------
      GAX-349       180.4     72.4      0.0       5.3  237.5     0.0
      Including     955.2     10.1     17.5      27.9   33.1    57.4
      Including   2,382.1      2.6     23.4      69.5    8.5    76.8
      -------------------------------------   ----------------------
                                                                    
      -------------------------------------   ----------------------
      GAX-351       168.1     36.6      0.0       4.9  120.1     0.0
      Including     289.3     11.7     20.4       8.4   38.4    66.9
      Including     735.0      0.8     24.4      21.4    2.6    80.1
      And            88.7     27.4     44.5       2.6   89.9   146.0
      Including     205.8      9.9     57.3       6.0   32.5   188.0
      -------------------------------------   ----------------------
                                                                    
      -------------------------------------   ----------------------
      GAX-318       165.0     11.6     24.7       4.8   38.1    81.0
      Including     443.0      2.0     32.4      12.9    6.6   106.3
      And            79.2      7.4     85.5       2.3   24.3   280.5
      -------------------------------------   ----------------------
                                                                    
      -------------------------------------   ----------------------
      GAX-333        89.8     26.7      4.6       2.6   87.6    15.1
      Including     382.5      4.0     27.2      11.2   13.1    89.2
      And           616.0      0.5     65.1      18.0    1.6   213.6
      And            71.8      4.0     88.9       2.1   13.1   291.7
      --------------------------------------------------------------
      The six holes listed in the table below were drilled to intersect inferred mineralization either adjacent to or below the proposed pit. Although this inferred mineralization was deemed to be uneconomic in the Preliminary Economic Assessment (PEA), the area was tested because 1) US Gold's geologists believed there was an opportunity to increase the grade and 2) higher silver prices since the release of the PEA could make this mineralization profitable to mine. Overall the holes achieved their objectives.

      -------------------------------------------------------------
                  Silver   Length     From    Silver Length    From
      Hole #       (gpt) (meters) (meters)     (opt) (feet)  (feet)
      ------------------------------------   ----------------------
      GAX-317      210.4      3.4     57.2       6.1   11.2   187.7
      Including    435.0      1.0     59.6      12.7    3.3   195.5
      ------------------------------------   ----------------------
                                                                   
      ------------------------------------   ----------------------
      GAX-321       72.4     16.7      6.8       2.1   54.9    22.3
      Including    351.0      1.0      8.2      10.2    3.3    26.9
      Including    497.0      0.9     22.6      14.5    3.0    74.1
      ------------------------------------   ----------------------
                                                                   
      ------------------------------------   ----------------------
      GAX-322       71.0     22.0     87.6       2.1   72.2   287.4
      ------------------------------------   ----------------------
                                                                   
      ------------------------------------   ----------------------
      GAX-328       60.8     18.6     31.2       1.8   61.0   102.4
      Including    656.0      0.5     49.3      19.1    1.6   161.7
      ------------------------------------   ----------------------
                                                                   
      ------------------------------------   ----------------------
      GAX-338       65.3     20.8     86.8       1.9   68.2   284.8
      Including    126.7      1.7     86.8       3.7    5.6   284.8
      Including    122.5      3.0     98.5       3.6    9.8   323.2
      ------------------------------------   ----------------------
                                                                   
      ------------------------------------   ----------------------
      GAX-335      162.7      5.2     47.4       4.7   17.1   155.5
      Including    489.0      1.0     51.6      14.3    3.3   169.3
      -------------------------------------------------------------
      As drilling continues along the eastern limits of the deposit, a lower zone continues to be defined. This zone, which was initially discovered in 2010, is flat-lying and occurs 100 m (325 ft) below surface. Two recent holes have intersected this zone, helping to grow its size to the east and north. With limited drilling prior to the PEA, the eastern portion of this zone was excluded from the production study. Further drilling will help determine its ultimate size and economics.

      -------------------------------------------------------------
                  Silver   Length     From    Silver Length    From
      Hole #       (gpt) (meters) (meters)     (opt) (feet)  (feet)
      ------------------------------------   ----------------------
      GAX-329       93.3     12.2    110.6       2.7   40.0   362.9
      Including    564.0      0.7    121.0      16.4    2.3   397.0
                                                                   
      GAX-332       93.6     11.2    110.8       2.7   36.7   363.5
      Including    421.0      1.2    115.3      12.3    3.9   378.3
      -------------------------------------------------------------
      2) Emerging High-Grade Zone

      On March 30th, US Gold announced that high-grade silver and gold mineralization had been intersected 400 m (1,300 ft) southwest of the resource. The initial hole retuned 2,400 gpt silver, 39.3 gpt gold over 0.6 m. Three additional holes have since been drilled. The first two holes, drilled to establish the orientation of the vein, intersected the zone but returned lower grades. The third hole, drilled to extend the mineralization to the east, returned additional high-grade as shown below (Fig. 2). Although more drilling is required, the results demonstrate the potential to develop a new high-grade zone at El Gallo.

      ----------------------------------------------------------------------------
                   Silver   Gold   Length     From    Silver   Gold Length    From
      Hole #        (gpt)  (gpt) (meters) (meters)     (opt)  (opt) (feet)  (feet)
      --------------------------------------------   -----------------------------
      GAXSW004      325.4    6.8      4.5     62.6       9.5   0.20   14.8   205.4
      Including     675.0   13.9      1.5     62.6      19.7   0.41    4.9   205.4
      Including     320.0    7.0      1.5     65.6       9.3   0.20    4.9   215.2
      ----------------------------------------------------------------------------
      3) Gold Zone Returns Deep Intercept

      The El Gallo Gold Zone is situated 200 m (655 ft) southeast of the resource (Fig. 2). The original interpretation was that the area was comprised of two mineral structures, with a near-surface gold-rich zone and a silver zone at depth. New drilling has intersected another gold occurrence below both of the previously known zones. The result is encouraging as it suggests there is potential for mineralization at depth, which has seen limited exploration. To date, ten holes have been completed in this area.

      -----------------------------------------------------------------
                    Gold   Length     From         Gold Length     From
      Hole #       (gpt) (meters) (meters)        (opt) (feet)   (feet)
      ------------------------------------   --------------------------
      GZX010         9.3      3.1    324.0         0.27   10.2  1,063.0
      Including     22.5      1.1    326.0         0.66    3.6  1,069.6
      -----------------------------------------------------------------
      Exploration around El Gallo since the feasibility study was initiated has returned promising results, including areas that are currently proposed for future mine site facilities. Many of these areas have not been thoroughly tested due to the on-going infill drilling program. US Gold has decided to shift half of its drilling to pursue these targets with the goal of further enhancing the project.

      ABOUT US GOLD (www.usgold.com)

      US Gold's objective is to qualify for inclusion in the S&P 500 by 2015. US Gold explores for gold and silver in the Americas and is advancing its El Gallo Project in Mexico and its Gold Bar Project in Nevada towards production. US Gold's shares are listed on the NYSE and the TSX under the symbol UXG, trading 1.9 million shares daily during the past twelve months. US Gold's shares are included in S&P/TSX and Russell indices and Van Eck's Junior Gold Miners ETF. Rob McEwen, Chairman and CEO, owns 20% of the shares of US Gold. On June 14, 2011 the Company announced that Mr. McEwen proposed to combine the Company with Minera Andes to create a high growth, low-cost, mid-tier silver producer focused on the Americas.

      This news release has been viewed and approved by John Read, CPG, US Gold's consulting geologist, who is a Qualified Person as defined by National Instrument 43-101 and is responsible for program design and quality control of exploration undertaken by the Company at its Mexican exploration properties.

      Samples from the core drilling were split on-site at the Company's Magistral Mine property. One quarter to one half of the split drill core is shipped to ALS Chemex for sample preparation and analysis by 4-acid digestion with ICP determination for silver and fire assay for gold. Samples returning greater than 1500 ppm silver or 10 ppm gold were re-analyzed using gravimetric fire assay. Standards and blanks were inserted every 20 samples.

      All holes were drilled with HQ bits and reduced to NTW where required. Samples were taken based on lithologic and/or mineralized intervals and vary in length. The true width of the mineral zone has not been determined.

      Certain statements contained herein and subsequent oral statements made by and on behalf of the Company may contain "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements may be identified by words such as "intends," "anticipates," "believes," "expects" and "hopes" and include, without limitation, statements regarding the Company's results of exploration, plan of business operations, potential contractual arrangements, receipt of working capital, anticipated revenues and related expenditures. Factors that could cause actual results to differ materially include, among others, those set forth in the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2010 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors". Most of these factors are outside the control of the Company. Investors are cautioned not to put undue reliance on forward-looking statements. Except as otherwise required by applicable securities statutes or regulations, the Company disclaims any intent or obligation to update publicly these forward looking statements, whether as a result of new information, future events or otherwise.

      To view Table 1. Drill Results: Core Holes Assays, please visit the following link:

      http://media3.marketwire.com/docs/usgold_811_table_1.pdf

      To view Figure 1: El Gallo District - Location of Veins, please visit the following link:

      http://media3.marketwire.com/docs/usgold_811_fig_1.pdf

      To view Figure 2: El Gallo Mineralization: Plan (Aerial View), please visit the following link:

      http://media3.marketwire.com/docs/usgold_811_fig_2.pdf
      CONTACT INFORMATION:

      US Gold Corporation
      Ian J. Ball
      Senior Vice-President
      (647) 258-0395 or Toll Free: (866) 441-0690
      Fax: (647) 258-0408

      or

      1. US Gold to Begin Phase 1 Development at El Gallo Project in Mexico
        TORONTO, ONTARIO--(Marketwire - Aug. 31, 2011) - US GOLD CORPORATION (NYSE:UXG)(TSX:UXG) is pleased to announce that the Company has approved Phase 1 development of its El Gallo project in Sinaloa, Mexico, with mining expected to commence mid-2012. Phase 1 will focus on the permitted satellite gold deposits at the project and is expected to produce 30,000 ounces of gold per year after initial ramp up. This decision is expected to generate cash flows approximately two years earlier than originally planned at a minimal capital cost and will help fund Phase 2, which is forecasted to produce an additional 5 million ounces of silver per year, beginning in 2014.

        Benefits of Fast Tracking Production:                                       
        
        --  Earlier production and cash flow starting in 2012 
        --  Phase 1 cash flow to be used to fund additional growth  
        --  Helps build an operating team in Mexico earlier  
        --  Phase 1 is expected to be easily funded from US Gold's current treasury
        Phase 1 is presently permitted for production and all surface agreements are in place. Historical production from this area totaled 70,000 ounces of gold between 2002-2005. With present gold prices US Gold believes fast tracking the development of El Gallo represents an attractive investment opportunity.

        Previous production from these satellite gold deposits ceased in 2005 due to 1) longer than expected leach times, which tied up working capital for the mines former owner, who operated with a small treasury, 2) lower than expected recoveries, 3) high maintenance and equipment downtime and 4) lower gold prices ($450 per ounce). Although US Gold will be taking steps to improve these operational items, the Company made its decision to re-enter production based on the historical operating performance.

        Development Plan

        The Company proposes to engage contractors to perform the mining and crushing functions in order to reduce capital expenditures. Expansion and upgrades are expected to be made to the existing infrastructure, which includes the heap leach pad, ADR processing plant and assay lab. US Gold has budgeted $15 million for initial capital expenditures. The Company anticipates these upgrades, along with a new contracted crushing circuit and mining fleet to be operational during the first half of 2012.

        Exploration and Resource Estimate

        Drilling has resumed on the gold satellite deposits in order to extend the resource and test new targets within the permitted area. The current resource estimate for the proposed Phase 1 area of the El Gallo project is highlighted below and set out in a Preliminary Economic Assessment (PEA) prepared by Pincock, Allen & Holt (Denver, CO) published by the Company in February 2011 (the "El Gallo PEA", see also "Technical Information").

        Phase 1 NI 43-101 Resource Estimate, effective November 2010                
        ----------------------------------------------------------------------------
        Category                                Tonnes     Gold Grade           Gold
                                              (x1,000)          (gpt)       (ounces)
        ----------------------------------------------------------------------------
        Measured                                 6,962           1.59        354,887
        Indicated                                3,435           1.34        147,580
                                       ---------------------------------------------
        Total Measured & indicated              10,397           1.50        502,466
        ----------------------------------------------------------------------------
                                                                                    
        ----------------------------------------------------------------------------
        Inferred                                   223           1.14          8,167
        ----------------------------------------------------------------------------
        The El Gallo PEA is not a feasibility or pre-feasibility study and contains no mineral reserves. The mineral resource figures referred to in this press release and the El Gallo PEA are estimates and therefore insufficient to allow meaningful application of the technical and economic parameters to enable an evaluation of technical or economic viability and no assurances can be given that the indicated levels of gold will be produced. Such estimates are expressions of judgment based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. While the Company believes that the resource estimates included in this press release and the El Gallo PEA are well established, by their nature, resource estimates are imprecise and depend, to a certain extent, upon statistical inferences which may ultimately prove unreliable. If such estimates are inaccurate or are reduced in the future, this could have a material adverse impact on the Company. In addition, the El Gallo PEA includes inferred resources that are too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that the El Gallo PEA will be realized.

        Feasibility Study

        The satellite gold deposits were originally planned to be mined in conjunction with the larger El Gallo silver resource. A feasibility study for the combined areas was scheduled for the end of 2011. Permitting and work related to finalizing the silver production schedule will continue, although changes to the study will be made to incorporate a phased production approach. US Gold anticipates publishing the feasibility study on Phase 2 by the end of the second quarter 2012.

        There are significant risks and uncertainty associated with commencing production without a feasibility or pre-feasibility study. The area proposed for Phase 1 of El Gallo production has not been explored, developed and analyzed in sufficient detail to complete an independent feasibility or pre-feasibility study and may ultimately be determined to lack one or more geological, engineering, legal, operating, economic, social, environmental, and other relevant factors reasonably required to serve as the basis for a final decision to complete the development of all or part of the El Gallo project for mineral production.

        ABOUT US GOLD (www.usgold.com)

        US Gold's objective is to qualify for inclusion in the S&P 500 by 2015. US Gold explores for gold and silver in the Americas and is advancing its El Gallo Project in Mexico and its Gold Bar Project in Nevada towards production. US Gold's shares are listed on the NYSE and the TSX under the symbol UXG, trading 2.3 million shares daily during the past twelve months. US Gold's shares are included in S&P/TSX and Russell indices and Van Eck's Junior Gold Miners ETF. Rob McEwen, Chairman and CEO, owns 20% of the shares of US Gold. On June 14, 2011 the Company announced that Mr. McEwen proposed to combine the Company with Minera Andes Inc. to create a high growth, low-cost, mid-tier silver producer operating in the Americas.

        TECHNICAL INFORMATION

        This news release has been reviewed and approved by William Faust, US Gold's Chief Operating Officer, who is a Qualified Person as defined by National Instrument 43-101.

        For additional information about the El Gallo project see the "Preliminary Economic Assessment for the El Gallo District, Sinaloa State Mexico" dated February 11, 2011 and prepared by Paul Gates, PE, Richard Addison, PE, Aaron McMahon, PG of Pincock Allen & Holt of Denver, Colorado ("El Gallo PEA"). All three individuals are Qualified Persons as defined by NI 43-101 and are independent of US Gold Corporation as defined in Section 1.4 of NI 43-101 and Section 3.5 of Companion Policy 43-101CP. Mr. McMahon verified the mineral resource data contained in the El Gallo PEA by conducting a site visit, which included verifying drill hole locations and survey data, reviewing sampling handling, data collection procedures, partial audit of the assay database, review of the QA/QC data and analysis of core recovery and drill logs and their relations to assay values. The El Gallo PEA is available on SEDAR (www.sedar.com).

        FORWARD-LOOKING STATEMENTS

        Certain statements contained herein and subsequent oral statements made by and on behalf of the Company may contain "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements may be identified by words such as "intends," "anticipates," "believes," "expects" and "hopes" and include, without limitation, statements regarding the Company's results of exploration, plan of business operations, potential contractual arrangements, receipt of working capital, anticipated revenues and related expenditures. Factors that could cause actual results to differ materially include, among others, those set forth in the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2010 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors". Most of these factors are outside the control of the Company. Investors are cautioned not to put undue reliance on forward-looking statements. Except as otherwise required by applicable securities statutes or regulations, the Company disclaims any intent or obligation to update publicly these forward looking statements, whether as a result of new information, future events or otherwise.

        The resource estimates contained in this news release have been prepared in accordance with standards of the Canadian Institute of Mining, Metallurgy and Petroleum referred to in Canadian National Instrument 43-101 (NI 43-101). These standards are different from the standards generally permitted in reports filed with the SEC. Under NI 43-101, US Gold reports measured, indicated and inferred resources, measurements which are generally not permitted in filings made with the SEC. The estimation of measured resources and indicated resources involve greater uncertainty as to their existence and economic feasibility than the estimation of proven and probable reserves. U.S. investors are cautioned not to assume that any part of measured or indicated resources will ever be converted into economically mineable reserves. The estimation of inferred resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources.

        Canadian regulations permit the disclosure of resources in terms of "contained ounces"; however, the SEC only permits issuers to report "mineralized material" in tonnage and grade without reference to contained ounces. Under U.S. regulations the tonnage and grade described herein under the "measured" and "indicated" categories would be characterized as mineralized material. The disclosure herein is being made by US Gold to provide a means of comparing its project to those of other companies in the mining industry, many of which are Canadian and report pursuant to NI 43-101, and to comply with applicable disclosure requirements. U.S. investors should be aware that the issuer has no "reserves" as defined by Guide 7 and are cautioned not to assume that any part or all of the potential target mineral resources will ever be confirmed or converted into Guide 7 compliant "reserves".
        CONTACT INFORMATION:

        US Gold Corporation
        Ian J. Ball
        Senior Vice-President

        1. US Gold Corporation
          NYSE: UXG
          TSX: UXG
          Other Recent News
          September 8, 2011
          Palmarito Expansion Drilling Continues to Return Good Results Starting at Surface-Growing Open Pit Potential

          237.6 gpt Silver Over 12.2 Meters

          263.2 gpt Silver Over 6.5 Meters

          TORONTO, ONTARIO--(Marketwire - Sept. 8, 2011) - US GOLD CORPORATION (NYSE:UXG)(TSX:UXG) is pleased to announce exploration results from its Palmarito deposit, part of the El Gallo complex in Sinaloa State, Mexico, where Phase 1 mining is planned for mid-2012. Drill results continue to show excellent potential for open pit resource growth, in addition to higher silver grades.

                                     Exploration Highlights                           
          ----------------------------------------------------------------------------
          
          --  Near surface mineralization continues to expand in size and importance: 
          
              - 237.6 gpt silver over 12.2 m, including 891.0 gpt silver over 2.0 m-
              from surface                                                          
              - 263.2 gpt silver over 6.5 m, including 500.0 gpt silver over 1.0 m- 
              from surface                                                          
          
          --  Drilling extends mineralization at depth, encountering the highest
              grades to date at Palmarito: 
          
              - 5,870.0 gpt silver over 0.4 m                                       
          
          --  Drilling to increase the confidence associated with the mineralization
              and upgrade inferred resources to the measured and indicated categories
              continues to meet expectations: 
          
              - 523.1 gpt silver over 2.9 m                                         
              - 123.0 gpt silver over 7.0 m                                         
              - 102.0 gpt silver over 18.3 m                                        
              - 130.0 gpt silver over 12.0 m                                        
          
          --  Testing historic reverse circulation holes with core drilling continues
              to return better silver grades, indicating an opportunity to add ounces
              in previously defined areas: 
          
              - 87.4 gpt silver over 17.0 m (Grade increased by 77% over same       
              thickness)                                                            
                                                                                    
          --------------------------------------------------------------------------
          US Gold's exploration team has had considerable success extending the higher grade portions of the near surface resource at Palmarito this year. Through this work, the geological understanding of the mineralization has been greatly improved. Numerous intersections of impressive grades and thicknesses have been encountered, illustrating the potential to increase the size of the open pit resource. With on-going success, US Gold believes Palmarito could become an important contributor of future silver production for the El Gallo complex.

          Near Surface Mineralization Continues to Grow

          The three most important holes recently drilled at Palmarito were PMX-142, PMX-145 and PMX-130. These holes extended the near surface zone by approximately 25 meters (80 ft) up-dip, at two separate areas of the project (Fig 2). These areas represent just two of several important targets that have been identified for expansion. The targets were not tested previously because a specialized drill was required to access the area. The potential to extend the zone further appears promising and several follow up holes have already been completed.

          ----------------------------------------------------------------------------
          Hole #       Silver   Gold   Length     From   Silver   Gold  Length    From
                        (gpt)  (gpt) (meters) (meters)    (opt)  (opt)  (feet)  (feet)
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
          PMX-142       263.2    0.3      6.5      0.0      7.7   0.01    21.3     0.0
          Including     500.0    0.5      1.0      0.0     14.6   0.01     3.3     0.0
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
          PMX-145       237.6    0.2     12.2      0.0      6.9   0.01    40.0     0.0
          Including     891.0    0.2      2.0      3.6     26.0   0.01     6.6    11.8
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
          PMX-130       105.4      -      3.0      0.0      3.1      -     9.8     0.0
          And           108.2    0.1      2.6     10.4      3.2      -     8.5    34.1
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
          PMX-153        82.9      -      7.1      0.0      2.4      -    23.3     0.0
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
          PMX-133        75.8      -      5.5     40.3      2.2      -    18.0   132.2
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
          PMX-144        86.0    0.1      6.4     61.6      2.5      -    21.0   202.1
          Including     166.0    0.5      1.5     63.1      4.8   0.01     4.9   207.0
          ----------------------------------------------------------------------------
          Expanding Resources - Identifying Mineralization at Depth

          Holes PMX-118 and 132 successfully intersected mineralization 50 m (165 ft) below the known limits of the zone. PMX-132 intersected the highest silver grades ever recorded at Palmarito in a narrow intercept that returned 5,870 gpt silver over 0.4 meters. This area, located along the west flank of the deposit, has recently been returning multiple intersections with values greater than +1,000 gpt silver, highlighting the potential for higher grade mineralization. Highlights from the area are shown below:

          ----------------------------------------------------------------------------
          Hole #       Silver   Gold   Length     From   Silver   Gold  Length    From
                        (gpt)  (gpt) (meters) (meters)    (opt)  (opt)  (feet)  (feet)
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
          PMX-118       128.5      -      5.2    145.8      3.7      -    17.1   478.3
          Including     242.0      -      1.6    147.0      7.1      -     5.2   482.3
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
          PMX-132     5,870.0    1.5      0.4    103.5    171.2   0.04     1.3   339.6
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
          PMX-089(1)    638.0    0.3      2.9     46.1     18.6   0.01     9.5   151.2
          Including   1,745.0    0.4      0.4     47.6     50.9   0.01     1.3   156.2
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
          PMX-079(2)    458.2    0.1      8.4     28.6     13.4      -    27.6    93.8
          Including   1,009.7    0.1      2.3     29.0     29.4      -     7.5    95.1
          -------------------------------------------- -------------------------------
                                                                                      
          -------------------------------------------- -------------------------------
          PMX-071(3)    184.6    0.3     25.9      0.0      5.4   0.01    85.0     0.0
          Including     959.0    0.4      1.8      0.0     28.0   0.01     5.9     0.0
          Including     948.0    1.6      1.2     16.6     27.7   0.05     3.9    54.5
          ----------------------------------------------------------------------------
          1 Previously Released on June 29th, 2011, 2 Previously Released on May 17th,
          2011, 3 Previously Released on April 26th, 2011
          Delineation Drilling Confirms Continuity of Resources

          Delineation drilling at Palmarito has been successful at confirming the nature of the inferred mineralization, with the majority of holes returning higher than anticipated silver grades. This is expected to have a positive impact on the total mineable ounces in the resource. Delineation drilling is expected to continue throughout the remainder of 2011 in order to continue converting inferred mineralization to the measured and indicated categories and increase the confidence associated with the mineralization. This drilling is required in order to prepare a reserve estimate for the project.

          ----------------------------------------------------------------------------
          Hole #        Silver   Gold   Length     From   Silver   Gold  Length   From
                         (gpt)  (gpt) (meters) (meters)    (opt)  (opt)  (feet) (feet)
          --------------------------------------------- ------------------------------
                                                                                      
          --------------------------------------------- ------------------------------
          PMX-125        123.0    0.3      7.0     84.0      3.6   0.01    23.0  275.6
          --------------------------------------------- ------------------------------
                                                                                      
          --------------------------------------------- ------------------------------
          PMX-134         84.8      -      6.0     16.0      2.5      -    19.7   52.5
          --------------------------------------------- ------------------------------
                                                                                      
          --------------------------------------------- ------------------------------
          PMX-138         64.6    0.4     14.1    102.9      1.9   0.01    46.3  337.6
          --------------------------------------------- ------------------------------
                                                                                      
          --------------------------------------------- ------------------------------
          PMX-140        523.1    0.2      2.9     53.7     15.3   0.01     9.5  176.2
          Including      966.2    0.2      1.3     54.5     28.2   0.01     4.3  178.8
          --------------------------------------------- ------------------------------
                                                                                      
          --------------------------------------------- ------------------------------
          PMX-143        130.0    0.1     12.0    123.1      3.8      -    39.4  403.9
          Including      395.0    0.1      1.1    125.3     11.5      -     3.6  411.1
          --------------------------------------------- ------------------------------
                                                                                      
          --------------------------------------------- ------------------------------
          PMX-149         92.6      -      7.0     10.0      2.7      -    23.0   32.8
          --------------------------------------------- ------------------------------
                                                                                      
          --------------------------------------------- ------------------------------
          PMX-150        102.0    0.1     18.3     19.8      3.0      -    60.0   65.0
          --------------------------------------------- ------------------------------
                                                                                      
          --------------------------------------------- ------------------------------
          PMXGT-01       297.7      -      4.2      0.0      8.7      -    13.8    0.0
          Including      743.0      -      0.9      2.0     21.7      -     3.0    6.6
          --------------------------------------------- ------------------------------
          Early Testing Continues to Upgrade Historical Drill Holes

          On June 29th, US Gold announced the results of a new core hole that twinned a historic reverse circulation hole based on the belief that the historic grades were understated. The initial hole showed a 49% increase in silver grade. Since then, one additional hole has been received that showed a 77% increase in grade over the same thickness. US Gold has decided to twin the remaining historic holes at Palmarito with core, which will consist of 45 holes totaling 4,000 meters (13,125 ft) of drilling. The final results from this program will be released once all assays have been received and analyzed. Should this upgrading trend continue, US Gold believes it will have a positive impact on the resource size and grade.

          ----------------------------------------------------------------------------
          Hole #         Silver  Gold   Length     From   Silver  Gold  Length    From
                          (gpt) (gpt) (meters) (meters)    (opt) (opt)  (feet)  (feet)
          --------------------------------------------- ------------------------------
                                                                                      
          --------------------------------------------- ------------------------------
          PMX-123 (New)    87.4   0.1     17.0     33.0      2.5     -    55.8   108.3
          Including       323.0     -      1.0     34.6      9.4     -     3.3   113.5
          Including       152.8   0.1      5.0     45.0      4.5     -    16.4   147.6
          --------------------------------------------- ------------------------------
                                                                                      
          --------------------------------------------- ------------------------------
          P13                                                                         
           (Historic)      49.3   0.1     17.0     29.6      1.4     -    55.8    97.1
                               ------------------------ ------------------------------
          Grade                                                                       
           Increase         77%                                                       
          --------------------------------------------- ------------------------------
          PHASE 1 MINING SCHEDULED FOR MID-2012

          On August 31st, US Gold announced the approval of Phase 1 development at the El Gallo complex, with mining expected to commence mid-2012. The El Gallo complex includes the El Gallo and Palmarito silver deposits and the Magistral gold deposits, located within a 13 km (8 mile) radius. Phase 1 will focus on the permitted satellite gold deposits at the project and is expected to produce 30,000 ounces of gold per year after initial ramp up. This decision is expected to generate cash flows approximately two years earlier than originally planned. Capital costs are low and the projected cash flow will help fund Phase 2 (including Palmarito), which is forecasted to produce an additional 5 million ounces of silver per year, beginning in 2014.

          ABOUT US GOLD (www.usgold.com)

          US Gold's objective is to qualify for inclusion in the S&P 500 by 2015. US Gold explores for gold and silver in the Americas and is advancing its El Gallo Project in Mexico and its Gold Bar Project in Nevada towards production. US Gold's shares are listed on the NYSE and the TSX under the symbol UXG, trading 2.3 million shares daily during the past twelve months. US Gold's shares are included in S&P/TSX and Russell indices and Van Eck's Junior Gold Miners ETF. Rob McEwen, Chairman and CEO, owns 20% of the shares of US Gold. On June 14, 2011 the Company announced that Mr. McEwen proposed to combine the Company with Minera Andes to create a high growth, low-cost, mid-tier silver producer operating in the Americas. Each Minera Andes shareholder would receive 0.45 of a US Gold share for every Minera Andes share held.

          This news release has been viewed and approved by John Read, CPG, US Gold's consulting geologist, who is a Qualified Person as defined by National Instrument 43-101 and is responsible for program design and quality control of exploration undertaken by the Company at its Mexican exploration properties.

          Samples from the core drilling were split on-site at the Company's El Gallo Complex. One quarter to one half of the split drill core is shipped to ALS Chemex for sample preparation and analysis by 4-acid digestion with ICP determination for silver and fire assay for gold. Samples returning greater than 1500 ppm silver or 10 ppm gold were re-analyzed using gravimetric fire assay. Standards and blanks were inserted every 20 samples.

          All holes were drilled with HQ bits and reduced to NTW where required. Samples were taken based on lithologic and/or mineralized intervals and vary in length. The true width of the mineral zone has not been determined.

          Certain statements contained herein and subsequent oral statements made by and on behalf of the Company may contain "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements may be identified by words such as "intends," "anticipates," "believes," "expects" and "hopes" and include, without limitation, statements regarding the Company's results of exploration, plan of business operations, potential contractual arrangements, receipt of working capital, anticipated revenues and related expenditures. Factors that could cause actual results to differ materially include, among others, those set forth in the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2010 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors". Most of these factors are outside the control of the Company. Investors are cautioned not to put undue reliance on forward-looking statements. Except as otherwise required by applicable securities statutes or regulations, the Company disclaims any intent or obligation to update publicly these forward looking statements, whether as a result of new information, future events or otherwise.

          To view Table 1 Drill Results: Core Holes Assays, please visit the following link:

          http://media3.marketwire.com/docs/Drilluxg.pdf.

          To view Figure 1: El Gallo Complex, please visit the following link:

          http://media3.marketwire.com/docs/Elgallouxg.pdf.

          To view Figure 2: Palmarito Resource, please visit the following link:

          http://media3.marketwire.com/docs/palmaritouxg.pdf.

          CONTACT INFORMATION: Jenya Mescheryakova
          Investor Relations
          (647) 258-0395 or Toll Free: (866) 441-0690
          Fax: (647) 258-0408

          or

          US Gold Corporation
          99 George Street, 3rd Floor
          Toronto, ON M5A 2N4
          [email protected]