
Ur-Energy Inc.
TSX:URE
AMEX:URG
Ur-Energy Inc. is a U.S. uranium mining company that recovers uranium by in situ recovery (ISR) at the Lost Creek mine and processing facility in south-central Wyoming and at the Shirley Basin mine in central Wyoming, where uranium recovery began in April 2026 and full operations were launched in August 2026.
Company facts
- Exchange
- TSX
- Symbol
- URE
- Secondary symbol
- URG
- Industry
- Metals & Minerals
- Website
- ur-energy.com
Company overview
Ur-Energy Inc.
U.S. uranium ISR producer ramping up two mines
Two ISR mines operating in Wyoming.Q3 sales 190k lbs at US$64.95/lb.Shirley Basin full operations Aug 2026.
Ur-Energy Inc. is a U.S. uranium mining company using in situ recovery at the Lost Creek and Shirley Basin mines in Wyoming. Lost Creek is the central processing hub, while Shirley Basin began operations in April 2026 and full operations in August 2026. The company reported a net loss of US$17.7 million for the quarter ended September 30, 2026.
- US$50.2M
- Cash (Sep 30 26)
- US$12.4M
- Sales (Q3 26)
- -US$17.7M
- Net loss (Q3 26)
- 398.7M
- Shares out
NYSE American: URG | TSX: URE
U.S. uranium ISR producer with two operating mines in Wyoming
Company overview
- Uses ISR at Lost Creek and Shirley Basin in Wyoming.
- Lost Creek drummed 341,058 lbs U3O8 in 9M 2026, +18.2%.
- Cash cost per produced pound sold US$40.40 in Q3 2026.
Ur-Energy is headquartered in Casper, Wyoming, with a registered office in Ottawa, Ontario. It also holds exploration and development projects in the Great Divide Basin uranium district.
Two operating mines and two exploration/development projects in Wyoming
Project portfolio
Operating
Lost Creek ISR Mine
Flagship ISR mine and central processing plant in south-central Wyoming. 341,058 lbs U3O8 drummed in first nine months of 2026.
Operating
Shirley Basin ISR Mine
Second ISR mine, satellite to Lost Creek. Licensed capacity up to 2.0 million lbs U3O8 per year. Started operations April 2026, full operations August 2026.
Development
Lost Soldier Project
Potential satellite mine 17 miles NE of Lost Creek. Technical report and PEA targeted before end of 2026. Baseline fieldwork started Nov 2026.
Exploration
Lost Creek South
16-square-mile area adjacent to Lost Creek. 120-hole drill program began October 2026 testing seven miles of trend.
Key financial metrics from latest filings
Financial position and results
Company holds US$50.2M cash and US$245.2M total assets. Q3 2026 sales US$12.4M; net loss US$17.7M.
US$50.2M
Cash and cash equivalents at September 30, 2026.
US$12.4M
Product sales revenue for Q3 2026 from 190,000 lbs U3O8 at an average price of US$64.95/lb.
-US$17.7M
Net loss for the quarter ended September 30, 2026.
398.7M
Common shares outstanding as of October 31, 2026.
Sources: SEC filings and company press release. Figures as of Sep 30, 2026 except shares.
Key company updates
Recent progress
- Nov 2026
- Baseline fieldwork starts at Lost Soldier. Company commenced baseline-study fieldwork at Lost Soldier and says technical report is on schedule for completion before end of 2026, with construction decision to follow.
Nov 2026
- Q3 2026 results reported. Sales of 190,000 lbs U3O8 for US$12.3 million revenue at average US$64.95/lb; net loss US$17.7 million.
Aug 2026
- First shipment from Shirley Basin. First shipment of uranium from Shirley Basin to Lost Creek processing plant marked start of full operations at second mine.
Apr 2026
- Shirley Basin mining starts. Uranium mining operations commenced at Shirley Basin, with uranium-bearing solution captured from Mine Unit 1.
Mar 2026
- Updated Lost Creek technical report. S-K 1300 report shows 11.868M lbs eU3O8 M&I, 10.357M lbs Inferred; mine life to Q2 2039; life-of-mine net cash flow US$442.2M after taxes.
Company-stated plans and expectations
Upcoming milestones
End of 2026
- Complete and publish Lost Soldier technical report and then make construction decision.Planned
2026
- Sell total 700,000 pounds U3O8 at average price approx US$67.00/lb for revenue approx US$46.9 million.Planned
Q1 2027
- Receive approval to commence production operations in Lost Creek Mine Unit 5.Planned
Q2 2027
- Bring new wastewater treatment facility at Lost Creek into operation.Planned
Key considerations
- Deferred 150k lbs U3O8 to 2027 and 150k lbs to 2029.
- Extended 250,000-lb inventory loan from Nov 2026 to Nov 2027.
- Cash fell to US$50.2M from US$123.9M at Dec 31, 2025.
Who runs the company
- Matthew D. Gili, President, CEO and Director
- Roger L. Smith, CFO and Chief Administrative Officer
- Kathy E. Walker, Chair of the Board
Unclaimed AGORACOM Hub. AGORACOM wrote this overview from the company’s public filings, news releases and website. The company is not an AGORACOM client and has not reviewed it. It is not investment advice.