Update: When Can We Expect Drilling Assay Reports?

Hole #8 should have reached its target depth by now, or within a few days, and assay reports should take 2 to 6 weeks depending on whether or not there was a "rush" request. "Rush requests" for assay reports can be completed sometimes within a couple of weeks. Therefor, we should have results back from assay reports sometime between the middle of May or the end of May. Hole #9 is at 1000 feet, and according to Chad Williams, VIT should have a new rig within "days" - thus drilling this hole won't be completed for at least another 2 weeks after drilling recommences and wedges inserted to adjust for azimuth deviation - and then another 2 to 6 weeks for assay results. Hole #10 should still be on target for completion and assay reports received by late June. The question is whether or not VIT will delay any press releases until all three holes are complete and assay results received. I would presume that if the drilling results on hole #8 confirm high grade gold mineralization, that the company will report those results as soon as they have been received - before the end of May in my estimation. If results from #8 are sub-par, then I would expect drilling results to be combined with the results of hole #9 and possible #10 in the later part of June. If you start seeing some volume pick up with modest upticks or a substantial increase in the size of bids in VIT's stock with no news, it could be a tip off that some good news is forthcoming.

Bottom line is that we could see some drilling results by mid to late May, and definitely some results before the end of June. VIT is a bargain @.92 IMO, currently selling at a 57% discount below the average price target reported by four junior gold analyst (1.45 C).

Join the conversation about Victoria Gold Corp.

Reply

Replies



  1. "Hole #8 should have reached its target depth by now, or within a few days"

    Thomas, this would be true but they don't have a 3rd drill rig yet and the other two are at 10 and 11.

    This is what i know.

    Hole 8 is at either 2267 feet or as Raul just told me, 2400 feet. (target of 2,600 ft)

    Hole 9 is at 1341 feet ( target of 2,300 ft).

    There is no third drill rig on the site right now.

    they say it is coming. A couple of days???? wait and see.

    The first day i was at cove hole #10 was at 767ft. The second day they were at around 880 but not sure what the end of day number was.

    Hole 11 the first day i was there the rig was in final steps of set up. Day 2 they had commenced drilling and were at 100+ft.

    I do not have specific knowledge of this but i highly doubt they pull a working rig off 10 or 11 to finish either 8 or 9 and will wait for the 3rd drill rig to do both. i do not know which they do first, perhaps 8 because it has so little left? We need to get that 3rd rig to show up first of all. Second, one needs all four holes 8-11 to run smoothly while drilling and assaying timing too, to ballpark results times. Smooth drill holes have not been the case so far, which is normal for deep drilling, to be expected. so estimated times are ball park at best.

    we get the results when we do. most of us here are long term holders and of course we want them sooner then later cause we are excited. Chad, Raul, the geos etc all would like it smoother and faster too and they are not dragging their feet.....it is a complex business, deep drilling. we're all on the same side.







      1. Hey Gooch, at the behest of new drill manager, tom lee, we have a new drill company (Progressive). Raul has worked with Tom before and Tom has worked with Progressive before. If it all works out like it is supposed to, we get better efficiency, expediency and accuracy. Raul is an expert in many areas to say the least but it is good they have someone dedicated to overseeing the drillers, freeing up Raul some more for other things too. They are happy with what they have seen so far. I hope they turn out to be good because Raul will not move a drill into the complicated and difficult area to drill, Mill Canyon, until he likes what he sees.

        I am waiting to hear back on some other questions and will find out an average then for the new guys. The old data from old past drillers not relevant.

        obviously they can drill at a much faster rate when more shallow then when nearing the end deeper target.

      2. According to Chad Williams it is taking, on average, to drill one hole at Cove McCoy, approximately one month. The holes being drilled at the present time are approximately between 2,200 and 2,600 feet. Based on an average of 2,400 feet for the aveage drill hole completed over a 30 day period - the average feet per day is approximately 80 feet per day. This takes into account down time for drilling problems.
        1. Thomas, you seemed like a decent enough guy when we interacted on the first part of the field trip and my comments are not meant to get in a pissing match or to be combative but I think facts are facts.

          The charts and your price targets are fine. we take it with a grain of salt when the $1.60 price targets don't hit and we don't hear any reassessment of what went wrong or we never hear you post when the charts say the stock is going down, only going up, etc. it seems like pumping but whatever......

          More Crucial-

          You are acting as an authority on Victoria yet misrepresenting the company and misleading the readers.

          Your comments that people should read the website were interesting. you tell everyone that they are drilling black canyon in October. Yes, they did not have a year ascribed to it so you can blame Victoria for your mistake but ALL of us knew they meant in 2007. How did we all know this? we check out the website once or many times, something you tell the reader to do but do not appear to have done yourself.

          Another post states on may 9th that Hole 8 is finished or within days. HOW? they don't have a drill there yet as of the date you post. You then tell people that they possibly can expect assay results by as early as mid may???? how? Late may seems like a very remote possibility but they need a third drill rig working right now and then a rush on the assays for it. Doubt that happens. the other two presently drilled holes are no where close to finished and they have to get back to hole 9 still too. So realistically and factually how reasonable is it we see results in mid to late may on ANY hole???

          Your most recent post is more bothersome. I am not sure if you have my posts on ignore but you completely come over the top of my post with very different drilling information. I spoke with Raul Friday morning and posted within minutes after hearing the data. I called because I was not sure about your May 9th 11:35 am post stating hole 8 was finished or within days. I responded with very detailed information, yet your post below comes even after mine, contradicting all I have said.

          Your post reads

          "According to Chad Williams it is taking, on average, to drill one hole at Cove McCoy, approximately one month." (James) We have a brand new drilling company, Progressive, they have not finished a single hole yet. Is the estimate from the old companies and before Tom Lee came on board to manage the drillers? how would we know what the average is for the new company and what is the use of the old company info, we have changed them because they were not happy with their results so why use the old numbers?
          "The holes being drilled at the present time are approximately between 2,200 and 2,600 feet." (James) as of this past Friday morning May 9th according to Dr. Raul Madrid spoken to via phone and what I saw in person on several different days when out there the week before, there are ONLY two drill rigs in operation, on hole 10 and hole 11. When I left on Sat. May 3, hole 10 was at approximately 900 ft you are now saying it is at least 2,200 feet? so in 6 days they have drilled 1300 feet, an average of 216 ft a day? AND on hole 11 which was just started on the Saturday I was there and at around 100 to 150 feet and they are now at 2200 feet???? therefore to get to minimum 2200 lower range you mention they have drilled 2050 more feet at an average of 341 feet a day in 6 days? Holes 8 and 9 are not being drilled at the present time there are ONLY two drill rigs, another is coming in a "couple of days" but wait and see. you tell us the holeS being drilled are at 2200-2600. The two being drilled no where near that range, one on hold is near that range and another on hold not near that range either.
          "Based on an average of 2,400 feet for the average drill hole completed over a 30 day period - the average feet per day is approximately 80 feet per day. This takes into account down time for drilling problems." James- How can you say that it takes on average 30 days to drill a hole INCLUDING drilling problems? lets take hole 8 for instance. Hole 8 has not moved ANY feet since at least the April 10th press release and a month has elapsed there alone. They are at around 2267 feet or 2400 feet. They are not finished, there is no drill there yet......BY the way hole 8 was collared a few days before the FEB 20th press release , NO Drill yet and NOT finished, time clock? 80+ days and still running. When there are problems there is no 30 day average at ALL and the complete time is unknown so far.
          1. First off, any one can make a mistake and none of my comments were intended to mislead anyone who reads my posts. You assume everyone who has looked at Victoria’s web site knew that Black Canyon’s report hadn’t been updated since last year. I hardly believe that I am the only investor that misinterpreted this information.

            As for the charts, take a look at the seasonal chart that I originally posted. I noted comments on the chart that the best time to own gold stocks was during the Oct to Feb period – and the chart clearly showed this to be the case for Victoria. The stock did move up from .57 to 1.60 during that time period, so my advise was spot on. Anyone who looked at my chart in October and bought Victoria at that time had plenty of opportunity to sell the stock for a profit. After the initial run up to 1.60 and pull back in the stock, I suggested that the stock would once again take a shot at moving back up to 1.60 – well, I only missed the target by .10 cent – it hit 1.50. Once again anyone who bought the stock on the pullback would have had the opportunity to cash in a profit on the recovery in price. The seasonal chart shows that this stock peaks out during the Oct – Feb period – is it necessary for me to tell anyone what they should have done with their stock during this period – logically one should have come to the conclusion that it might be a good time to take some profits during this time frame. If you want any follow up advise on my charts, I have repeatedly suggested that they go to stockcharts.com – select public charts – then look for posted by “Thomas smith”. In other words, I don’t just make a recommendation to buy without any follow up comments. I resent any inference that I am a pumper/dumper. See chart link below:


            <img src="http://i186.photobucket.com/albums/x... " alt="Photobucket - Video and Image Hosting"><br><br>

            My comments regarding taking approximately one month to drill holes at Cove McCoy was a direct quote from “Chad Williams”. I guess my failure here was to add any comments that there could be drilling problems, and it could take longer. I assumed that most people could figure that out for themselves that drilling doesn’t always run smoothly.

            As you well know, in the past, Victoria has done a poor job in keeping us up to date relative to their current drilling status. To the best of my limited ability I have tried to give readers at least some insight as to when we might expect to have some drilling results. So what if I am off a month or so in my estimates – that’s a whole lot better than the actual information that Victoria has provided us with. When we visited the Cove McCoy properties, I thought the rig that was pulled off the pad was hole number 9, and hole 8 and 10 were still be drilled on. So it was reasonably for me to think hole 8 would be completed very soon. I haven’t called the company to verify your comments on which holes are not being drilled, buy I assume you are right – but to make a point, any mistakes I made were honest mistakes. I also want to make it clear that I am not an authority on Victory – the only person who is qualified to as an authority is the people who run the company. In the future, I guess I am going to have to make a hedge clause: This is my opinion as I see things, but it is your responsibility to do your own due diligence.