Skip to content
Sign in

Post

Wildcat Exploration Ltd

You’re reading traps7’s reply in this thread.Jump to it

VEEP3.2 rating from 38 members3.7K ptsRate

PP and news

I hear the first tranche of PP is closing soon. And news soon about Toronto convention where Dr. Spry is supposed to talk about the broken hill type geology at Foster. These deposits are huge and wildcat has been recognized and put on an exclusive list for this type of discovery in the world. If this is all true and we start to get exposure from this kind of discovery at the Foster area we should be in for a surprise. I hear this is a remarkable discovery and accomplishment by the cat and now will start to get it's exposure by being added to the list of broken hill type deposit around the world. This PP will be focusing on the Jeep area and flinflon area.. (correct me if im wrong). Also some news should come out on the JV... Matter of time before a big player is interested in the foster. The cat has spent lots of time and effort searching a wider area compared to SGR. They have not focused on only one development. They also have reason to beleive that the sgr hinge extends onto one of WEL'sproperties. Could it be the Jeep area and that is why they are focusing there with this PP. I think so, and as you look at the map you can draw your own conclusions.

the cat is purring. wait until it strikes.

r65

Join the conversation about Wildcat Exploration Ltd.

Reply

Replies

  1. Rob, thanks for the update, and yes i believe the Jeep is where its at.

    Flin Flon is actually the Snow Lake area. Going to be a good year!!

    1. MINERAL INVENTORY FILE NO.
      264
      ____________________________________...
      PRODUCT
      GOLD
      NTS AREA
      52M3SW
      REF.
      AU
      ____________________________________...
      NAME OF PROPERTY
      JEEP MINE (RICE GOLD NO. 2)
      OWNER OF OPERATOR ADDRESS
      1985 - Augusta Gold Mines Ltd.
      Box 57
      Winnipeg, MB R2C 2Z3
      Phone: 257-3365
      OBJECT LOCATED
      Shaft
      MINING DIVISION
      Winnipeg
      Latitude
      51° 02’40”
      Longitude
      95° 29’40”
      Uncertainty (m)
      80 m
      UTM Zone
      _____
      Easting
      _______
      Northing
      _______
      L.S./Quarter Section
      ___
      Section
      ___
      Township
      24
      Range
      15 EPM
      DESCRIPTION OF DEPOSIT
      The deposit is located within several shear zones which strike northwest through an "L" shaped intrusion of Archean dioritic to gabbroic country rock. Stephenson (1972) described the gabbro as slightly foliated with some mineral alteration. The diorite, found nearer the mine is medium-grained. Hand samples appeared to be weakly altered but thin sections showed them to be highly altered (Ibid.).
      Granitic masses intrude the diorite and underlie about half the property. The contact strikes northwest and dips steeply to the southwest. The granitic rocks are in turn intruded by igneous dykes of various types. These granites separate Veins 1 and 3. Wallrock is chlorite schist.
      Mineralizaton is contained in parallel quartz veins in the shear. The veins are narrow, never over 0.9 m in wide, irregular, and not always of ore grade. The No. 1 vein, where the shaft was sunk, was exposed for 61 m on the surface, but died out underground. Gold-bearing veins were found up to 183 m from the shaft. Some sulphides and carbonates were found in the veins. Scheelite was noted by Eakins (1949) at one place in Vein No. 1.
      Theyer (1983) interpreted the host rocks as detrital sedimentary rocks that were subjected to varying degrees of megmatization and coccmitant recrystallization. It was proposed that the mineralization at the Jeep Mine was formed by migration of gold from the detrital sedimentary rocks followed by deposition with quartz in nearby fractures.
      ASSOCIATED MINERALS OR PRODUCTS OF VALUE
      N/A
      HISTORY OF EXPLORATION AND DEVELOPMENT
      The deposit is located about 6.4 km west of Wallace Lake. Several kilometres of gravel road connect Bissett and Wallace Lake.
      The early claim history of the property was as follows:

      Year Claim Name Claim Number Staker
      1934 Slip No. 11 W 4230 J.F. Barrieau
      - cancelled in 1939.
      1942 Amigo No. 3 W 10736 Robert Fitzsimons
      - cancelled in 1945.
      1946 Rice Gold No. 2 W 14476 W.L. Campbell
      - assigned to R.J.R. Schaffer in 1946.
      Rice Gold Prospecting Syndicate explored the property in 1946.
      - assigned to Jeep Gold Mine Limited

      San Antonio Gold Mines Limited formed Jeep Gold Mines Limited to develop the 12 Rice Gold claims. Diamond drilling was carried out on three veins.
      A three-compartment shaft was started in 1947. Surface and underground diamond drilling, crosscutting and drifting were carried out for several years. An unsorted 291 tonnes of ore yielded 5.6 kg (182 oz.) of gold. The milling, throughout the mine's history, was done at the San Antonio plant. The highest assay for 1947, was 64.07g. (2.06 oz.) over a width of 0.27m and 0.25 m long. The lowest assay that year was 26.50 g/tonne (0.85 oz/ton) over a width of 0.31 m and a length of 0.71 m (Manitoba Mines Branch c).
      Two test runs of ore were milled in 1948. A total of 1099 tonnes of ore produced an average of 27.29 g/tonne (0.80 oz/ton) of gold. An assay of 98.4 g/tonne (2.87 oz/ton) gold across 0.15 m was reported 168 m below the surface. Recovery of the ore averaged 30.86 g/tonne (0.9 oz/ton), with a reserve of 4990 tonnes in two veins. By June 65.16 kg (2095 oz.) of gold had been recovered. The veins were proving variable in width, so an attempt was made to stabilize the ore grade at 34.29 g/tonne (1 oz/ton). It was determined that No. 1 vein did not continue with depth. The No. 3 vein became the primary source of ore. No. 7 vein was discovered about 183 m from the shaft (Ibid.). A 21-year lease, M-2037, was taken out in 1948.
      In 1949 the shaft was lowered to 180 m. Another two levels were added at 137 and 175 m bringing the total to four levels. The other levels were at 38 and 61 m. The mine produced about 23 tonnes of ore a day. Reserves from the 2 main veins totalled 3175 tonnes. Mining was halted in 1950, though further development work was continued for a short time. The principal ore vein did not continue with depth. The company felt Vein Nos. 3 and 7 could not support mining operations (Manitoba Mines Branch c, Jeep Gold Mine Limited, Company Report, 1950). Some exploration work was done in 1958 and 1959.
      The property was kept in good standing. In 1969 Transtide Industries Limited bought The Jeep Gold Mine Limited. Later in 1969 the lease was renewed for another 21 years. Geophysical surveys were undertaken in 1973 when the price of gold rose to $3.22/g ($100/oz). According to a newspaper clipping, Transtide expected to do surface mining on the property (Winnipeg Free Press, May 29, 1973).
      In 1975 Rice Gold No. 2 was converted from a lease back to claim W 14476. From June to September 1973 Transtide drilled four holes totalling 546 m. The holes were collared east of the mine shaft and parallel to the main shear zone. Details of the results are not available. The claim was cancelled in 1976.
      In May 1977 N. Tschunsky staked CB 8043 over the deposit and in 1980 the property was assigned to Augusta Gold Mines Limited, a subsidiary of Gold Lake Mines Inc. A feasibility study was completed in 1981, on a mill designed for 180 tonnes per day (Northern Miner Nov. 12, 1981). From July 1981 to August 1982 prospecting, magnetometor and EM surveys were completed. Gold Lake Mines 1982-83 annual report indicated intent to design a drilling program to verify the continuity of more shallow mineralized structures to a depth of 450 m.
      HISTORY OF PRODUCTION
      The Jeep Gold Mine Limited was in production from February 26, 1948 to December 21, 1950.
      Following are the production figures for production from February 26 to December 31, 1948:

      Tonnes treated 7426 tonnes
      Average per day 24.0 tonnes
      Mill Head 32.4g/tonne (0.945 oz/ton)
      Mill Tail 0.55g/tonne (0.016 oz/ton)
      Mill Recovery 31.85g/tonne (0.929 oz/ton)
      Total Recovery 236.61 kg (7607.42 oz.)
      Efficiency 98.5%
      Average cost per tonne $18.09
      Average Profit per tonne $12.21
      Average cost per gram $0.69/gram ($21.46/oz.)
      Average profit per gram $0.44/gram ($13.54/oz.)

      The figures below are given on page 69 of the 22nd Annual Report on Mines and Minerals, Manitoba Mines Branch:

      1949 To Date
      Tonnes treated 5707 13 132
      Average tonnes/day 15.4 19
      Average Mill Head23.3g/tonne (0.68oz/ton) 28.44g/tonne (0.83oz/ton)
      Average Mill Tail 0.33g/tonne (0.0095oz/ton) 0.44g/tonne (0.013oz/ton)
      Average Mill Recovery 22.97g/tonne (0.67oz/ton) 28.00g/tonne (0.817g/ton)
      Total Recovery 131.14kg (4216.3oz) 367.73kg (11823oz)

      From the 23rd Annual Report on Mines and Minerals, p.72:
      The statistics listed below show operating profit per unit for the year and the operating profit since production began on February 26, 1948, and operating costs and operating profit (mine only) for 1950, and from start of production Feb. 26, 1948 to Dec. 31, 1950.

      1950 Feb. 26, 48 to Dec. 31,50
      Tonnes Milled 2798 15\930
      Total Mill Head kg 57.16kg (1837.71oz) 430.71kg (13\847oz)
      Total Tailings Loss 0.99kg (31.97oz) 6.79kg (218.32oz)
      Net K.G. gold recovered 56.16 kg (1805.74oz. 423.92 kg (13 629.46?)
      Recovery g/tonne 20.06g/tonne (0.585oz/ton) 26.61g/tonne (0.78oz/ton)
      Average cost/tonne $19.11 $20.22
      Average operating
      profit/tonne $1.14 $4.81
      Average cost/gram $1.16 ($35.99/oz) $26.06
      Average Operating
      profit/gram $0.07/gram ($2.16/oz.) $6.20

      TOTAL PRODUCTION Tonnes kg (oz)
      Produced - Feb. 28, 1948 to Dec. 31, 1950 15 930 423.92(13 629.46)
      Production from development headings 389 8.08 (259.9)
      prior to February 28, 1948, credited
      to preproduction expense

      TOTALS 16 319 432 (13 889.36)
      The average grade of ore from 1948 to 1950 was 26.95g/tonne (0.786 oz/ton).
      1. Thanks for the history lesson on the jeep production.... Looks like more drilling could be positive now that we have 3 d modeling... This will greatly aid in positioning the drill and increas the succuss rate and extension of known mineralization.





        In addition to RL area the Read lake and foster add considerible upside potential for the base metals side, which will eventually come back.



        Moved most of my WEL into my TFSA today via an equity swap.... and there it will stay for some time.