Skip to content
Sign in

Post

ZEN Graphene Solutions

You’re reading Dolphins’s reply in this thread.Jump to it

Verified Optometrist3.5 rating from 625 members44.9K ptsRate

Roth Report

Could not find the link but found this post that I wrote after that report came out. Their $10 NAV was based on only finding 13M tons of ore...so double all the numbers from my previous post LMFAO!!!

Just a few thoughts on the Roth report...

I know we have discussed that the NAV model was not the proper way to assess the company at this juncture but it is how Roth has based their valuation.

Their NAV is $9.92. This is based on the following assumptions:

13M tons of Ore
5% grade
90% recovery
26k tons of finished product per year
$1500 cost of production
$8000 average sales price per ton
12% WACC
$30M equity financing for PEA and FS
$170M for Capex
Production to start in 4 years.

Roth has admitted that their assumptions are conservative and I would agree. I think it is important going forward that we remember these assumptions and how they evolve. I think we will see good improvements in the following categories which will have a material impact on the NAV:

Resource estimate: 13M tons
Graphite production per year: 26k tons
Cost of production: $1500 per ton
Average sale price per ton: $8000

I think all these figures are too conservative and as we demonstrate what the real values are, our NAV can only go up!

Roth has put a 2.75% royalty here, I assume that is to Cliff's. This is not a big deal but had not really noticed that before and thought it was worth mentioning.

Join the conversation about ZEN Graphene Solutions.

Reply

Replies

  1. Glorieux,

    Nice Summary!

    Yes, they are being conservative, but that would be much better than extravagant speculations. Their assumptions are now on the table for us to modify/adjust based on our own information/belief.

    Just did a quick cals using my "shoe box" model with the data available to-date and the results came out to be 27 M tonnes of ore, approximately.

    Now, we can play with the assumptions: With an annual production of say 50,000 tonnes/yr of the finished product (double ROTH production, but half of the 100,000 tonnes/yr production used by others) @ $1000/tonne profit the total profit would be $50M/yr (Note: this is profit).

    Scale it up and down to your liking...preferably up. If the profit is expected to be $2000/tonne then total profit would be $100 M/yr, which is not too shabby!

    Etc, etc...

    Try this link for ROTH report

    http://tradingchief.com/coverage/roth.pdf

    goldhunter

    1. Thanks goldhunter.

      Even if you think that they only have 27M tons of raw ore in the east pipe and nothing in the west pipe, that is still 13 years worth of production at 100k tons per year of finished product at a grade of 5%. The company has stated that 100k production per year was their target. Since even the most conservative approach yields enough ore to give us 13 years and management has stated this as their goal, I think we are safe to use that number.

      In terms of profit, cost of production should come in around $500 but could be lower since the company plans on being able to recoup most of their reagent during the caustic bake.

      Now, have a look at this link, it show the price for sale of vein graphite from Sri Lanka at a purified grade of 99.5%:

      http://graphite.com.co/online-store/#!/~/category/id=5291633&offset=0&sort=priceAsc

      You will see that 500kg sells for $13k per ton. Our profits therefore should be running $12500 per 500kg. But to be conservative again, let's say our profits are $10k per ton. With a production rate of 100k tons per year, our profit could easily be $1 Billion dollars. Our market cap this morning is $270M. We are still hugely undervalued even by these conservative numbers. At a PE of 5, our share price would be $83!!

      Like I say, sit back, stay away from the sell button and let this freak of nature do it's thing!

      Glorieux

      1. G.

        There is nothing wrong with your argument. As a conservative person I would

        - stick with 50,000 tonnes/yr production (even though management said they would aim for 100k/year). This would reduce the required Capex and get the kinks out of the system. Also, you don't really want to flood the market with the stuff with an over-production. If there is a demand then this could be ramped up quite quickly. I am assuming no contribution from the West pipe (ya, kind of vconservative). This is what I would keep in the back pocket and pull it out as required. 50k tonnes per year would stretch the 13 years to 26 years of operation. So, there would be no need to even talk about the West pipe (still in my back pocket).

        - I would also reduce the $10,000/tonne profit to $5000/tonne (conserrvative again!).

        With the above conseravative assumptions the profit would still be 1/4 of a $Billion (still a very nice number indeed). I would be prepared to hit the sell button for 1/2 of my holdings @ $20/s; turn off the computers; take a 4-month vacation in the Caymans and let the other half ride to whatever SP...this "freak of nature" wants to get to. Right now it's at $4.71/s.

        BTW, this deposit can be developed by aiming at the top layer (say to about 300-400m deep) leaving the deeper layers until later. In other words, do the lateral development first for both East and West pipes and let the universe unfold itself at depth (underground mining, ...block caving?)

        Cheers,

        gold hunter

        1. Hey gold hunter, Just to keep the calm betwen you and G (lol) I will settle in for the middle of the road. 75,000 T/y for 19 yrs with an anticipated profit of $7500/T. This is a very nice number of 3/8 billion (even a better number indeed) and can be sold for $30/s and take 6 wks in the Caymans for half your holdings. Watch the rest increase further in blue sky value. Right now it's at $4.75. cheers back, the deputy

          1. If I take the size that ZEN is reporting for the East pipe,

            "On the East anomaly graphite mineralization has been traced for approximately 150 metres in a NE – SW direction by 300 metres in a NW-SE direction. To date, drilling from eleven holes has shown graphite mineralization down to 500 metres vertical where it remains open."

            and work out the East Pipe average grade for all holes reported so far within this reported area, I get the following of 4.13%

            150x300x500=22,500,000

            SG of 2.7= 2.7x22,500,000= 60,750,000 tonnes ore

            4.13x60,750,000= 2,508,975 tonnes Graphite

            so 27m tonnes ore is being way to conservative IMO

            Take Care

            1. Replying to @Dolphins

              Thanks for posting that Dolphins. I was too busy to do it again but those numbers work with what I remember, actually a little higher but will not argue lol.

              Your number probably higher since you are treating this as a cube instead of an oval cylinder.

              Cheers,

              G.

            2. Replying to @Dolphins

              Hello Dolphins

              It's good to see the assumptions on the table, so that we can compare notes.

              It appears that we are looking at the deposit from different angles.

              - You are looking at it from above using the NE-SW and NW-SE axes as a reference (150mx300m) with a depth of 500m.

              - I am taking a slice with the axis in the N-S direction where the bulk of the data is available: holes 4, 5, 8,9,10 and 11. The deposit cross-section going through that axis is an oval (looping all the good grade, with average grade of 5%). The thickness of this oval cross section came from hole 14; in fact it's the projection of the intercept on the surface). The oval is then "squeezed" (approximated) into a rectangle x-section to simplify the math. The resulting shoe-box model now has a dimension of 350m (along the N-S direction x 150m (depth) x 200m thick.

              350x150x200x2.6sg = 27M tonnes

              There are some difference in the sg (2.6 versus 2.7) but that is is minor (4%).

              The main difference as I see it is the depth of the deposit. I used 150m by putting more weight on the high-grade sections, and limit the oval x-section to about 300-400m (for a much smaller/less expensive open-pit, at least for the initial operation). Yours is 500m (a factor of 3.3 higher than mine/a much larger pit) Your grade is 4.1% compared to mine at 5% (20%).

              Ignoring all "minor" stuff, the key seems to be the depth of the deposit (a factor of approximately 3.

              Perhaps, I am conservative, just trying to put a floor under the estimate in view of the scarsity of data. Anything above 27M tonnes would be gravy. So, presumably ROTH people are ultra-conservative?

              goldhunter

              1. Replying to @goldhunter11

                Good to see were you are coming from.

                Like Glorieax said it may be round to oval so you can run numbers a lot of ways.

                As a minimum for me the East pipe is 40m tonnes

                My 4% takes in overprint as it will be used as they mine for the higher grade.

                Either way we slice it, it will be a mine just with the East pipe, West pipe is icing on the cake!!!

                Take Care