Question for AE
It's been said AE will not sell under $10.00. I'd like someone to ask him if this number has changed, does he have a new base for a sell price?
Join the conversation about ZEN Graphene Solutions.
ReplyYou’re reading precious44’s reply in this thread.Jump to it
It's been said AE will not sell under $10.00. I'd like someone to ask him if this number has changed, does he have a new base for a sell price?
Join the conversation about ZEN Graphene Solutions.
ReplyI actually asked him that about a month ago or so. I framed the question asking him to confirm his PDAC comments (posted recently again here) about a minimum price of "$10 and possibly north of $17". He said that this was his opinion, still is but for ANY offer of any type received it will be a BOD decision whether to back the deal or not.
He has always stated that the 'true value' of the property will be realized to shareholders. But we can all only guess at what that number could/can be and in waht timeframe.
Thanks I_C... You always have great input to share on this forum.
I understand a better estimate of value will come out in the PEA. A big missing link for us is knowing what grade the graphite is and the cost to process it, therefore we can't put an educated guess on the value of the company. I'm thinking AE reaffirmed that to you a month ago so he has a better idea now of the true value of ZEN than back at PDAC. IMO for what it's worth; North of $17 rather South to $10 would seem more realistic if we're talking synthetic, and even higher if it's nuclear grade.
I'm anxiously awaiting Quincy's AGM summary.
ZEN to Twen...ty
A big missing link for us is knowing what grade the graphite is and the cost to process it, therefore we can't put an educated guess on the value of the company.
Grade is known and was provided in the 43-101. Cost to process was estimated in the 43-101 but of course the PEA will provide more details. I think we know the costs are in and around the $2K per tonne number +/- unless there is some surprises.
One thing to look for in the PEA is a range of prices and costs. Given all this extra testing for various end users we will probably end up with various scenarios of price/cost. For example, using the 43-101 we could have a price of $8,500 and a cost of $2,000; then a price of $10,000 and a cost of $2,500, etc etc. It could be that there is some additional cost to provide an end user with x characteristics (this would be a good question for the AGM).
At this point I think I would be shocked if the costs were well higher than the estimates provided in the 43-101. When I spoke to AE about the NPV calculation we have access to here (provided by Gloriuex I believe) he confirmed of course that they have done a similar NPV and his phrase for it was 'staggering', as in, 'this would be the highest margin mine in the world if it was running today'.
I look to the PEA to (a) simply confirm what we here already know and (b) trigger other events already spelled out here
This is also the first time I have heard a number tossed around that is almost double to the highest number previously estimated. I also would welcome any insight as to whether this is justifiable or not. The low cost of processing is a huge advantage for Zen and I hate to see that eroded in the minds of investors, unless of course it has basis in fact. Then again, the <1000 previously estimated is not based on fact just educated guess, but I thought a well reasoned one.
GLTA
Replying to @Packfan1941
I am not sure where the sub $1,000 came from but from the 43-101 I think the rough numbers used there were in the the $1,600-$1,700 per tonne. Those may have been considered conservative but we also may have added some cost in order to get a higher purity or some specific flowsheet characteristics needed to obtain a higher selling price.
What is more importnat than just the cost is the spread between the selling price and the cost. For example, I would rather sell at $13,000 and have a cost of $2,500 then sell at $8,000 and have a cost of $1,600.
The PEA should clarify all this.
"I'm quite new to zen but was always under the impression costs were sub $1000 could you please explain how you get to $2000?" precious44
A couple posters have raised concerns about production costs being quoted $2000 and seemed surprised by hearing this number. Versatileye had the best discussion of this titled, "Strip Ratio and Minelife". Below is only part of the discussion but most pertinent to the Production Cost Number. Cheers, Mark
Versatileye,
"It wasn’t until the 43-101 technical paper came out that strip ratio questions could be fully addressed, because that paper supplied some missing info: cost assumptions that were used in the whittle model.
Waste Cost US$3.00 per tonne
Ore Mining Cost US$4.50 per tonne
Processing Cost US$40.00 per tonne
Process Recovery 80%
G&A US$10.00 per tonne
So what can we now determine about strip ratio and the importance thereof? Well:
I have assumed that the initial overburden has been removed and capitalized in the beginning pre-production stage of mine development:
2.6 tons/cubic m for glacial till and limestone overburden;
2.67 tons/cubic m for breccia, halo, and all waste rock.
Life of mine waste cost is $3 as per 43-101. This won’t have been assumed to be a flat rate. It would have a range on it, say $2-4. When the waste rock is already at the surface and only needs to be hauled less than 1km for ‘disposal’, that’ll cost less than when you are a few hundred meter’s down the pit, have to haul it up hill and then get rid of it.
Stage 1: they site and build the mill, and order the trucks.
Stage 2: overburden removal. Using that as construction material, they build water-control perimeter and haulage road. As this is waste rock, although it is close to surface and should be on the lower end of the ‘waste cost’ range, I’ll cost this all as $3/ton, partly because of the ‘construction’.
They remove 400m x 400m x 40m = 6,400,000m3 x 2.6t/m3 = 16.64Mtons x $3/ton = $50M
They can now see the pay dirt. Actually they won’t need to remove that much over burden before they see the pay dirt. 25% of this would be $12.5M for overburden removal the size of 200m x 200m, which is about the size of 8 football fields. Just thought I’d calculate that because I recall chief saying we could add an extra $100M to capex to eliminate the over burden issue.
Overall, the whittle pit averages out at about 9 to 10:1 strip ratio, with 20:1 or slightly higher at the very bottom (To sink the pit 10m deeper will require a 20:1 strip ratio, which can be calculated by adding up all the waste costs involved in making the area of a cone (the pit walls) that much wider…)
At the bottom of the whittle pit, strip ratio is closer to 20:1, grade is 2.5% so 40 tons ore, for one ton Cg. Costs are $4 (waste) x 800 (tons waste) = $3200; ore costs are $5 x 40 = $200; processing is $40 x 40 = 1600; G&A is $10 x 40 = $400. $5400/.8 = $6750.
If grade is actually more like 2%, then costs would be $8437.50, so the whittle model stops at that point.
In the first year of production, after overburden removal ($12.5M), initial strip ratio will be 3:1 (it’ll actually be less than this on day one), and the grade will be about 6.25%, so waste costs are (lower than mine average at top of pit) $2 x (3 x 16tons) = $96, ore costs $4 x 16tons = $64, processing is $40 x 16tons = $640 g&A is $160 so costs are $960/.8 = $1200 per ton.
But now let’s look at how sensitive the average ‘bottomline’ of the project is to strip ratio:
So if the strip ratio is 4:1, you would incur (4 x $3=) $12 waste cost to get one ton of ore. If the indicated ore is 4%, you need 25 tons ore to get .8 ton Cg. Costs would be (25 tons x $12=) $300 waste plus (25 tons x $4.50=) $112.50 ore mining cost plus (25 x $40) $1000 processing cost, plus $250 G&A. That’s $1662.50/.8 ton or $2078/ton finished Cg. Gross margin is indicated as $6422/ton.
If the strip ratio is much higher at 6:1 that would increase costs to $2228/ton, moving gross margin down to $6272/ton (only 2.5% lower) Even if the strip ratio is 10:1 costs would be $2528, and the margin would be $5972/ton. So a 250% increase in strip ratio only lowers the gross margin by 8.5%.
So, you can see, strip ratio is of little concern to the bottomline of this deposit. And, with a high gross margin and low waste costs due to open pittable resource, that should have been known before the 43-101 came out in December. After the technical paper, not brought up ever again."
Replying to @LTGoldBull2
A couple of comments:
1. Cost of Productions: As one poster has already said, the production cost should not be of great concern here. It's the profit margin that counts. For example, just example for illustration purposes.
Case 1: All-in production cost of $1000/tonne for a sale price of 8500/tonne; profit = $7.5k/t.
Case 2: Cost =2k/t, sale price = 20k/t; profit = $18k/t.
Case 3: Cost = 2k/t, sale price = 10.5k; profit = $8.5/t
In the above, case 2 is clearly a winner (the additional process and equipment required to get to the quality to fetch 20k/t is justified). Case 3 is marginal, since the additional required process and equiment may not warrant the extra price/profit. Company may decide to sell the stuff produced in case 1 to avoid getting involved in a more complex factory. However, graphite is not Nickel (or gold) and hence it may be a good strategy to give propective customers (buyers) options, or to have your options to sell stuff to different kind of buyers, since not everyone would want to pay $20k/tonne product (assuming the profit margin would be $18k/t (cost of production could be a lot more than $2k/t). It boils down to the business/marketing model a company may choose to follow. If there is a lot of demand for the basic product (case 1) and you have a lot of it (the volume sale) then perhaps it would be quite lucrative to dig it up from the ground, process just a bit, just enough to sell for some decent profit margin.
This strategy is not new, and has been discussed by other companies.
2. Open pit vs underground (UG): The assumption has been that Albany deposit will be developed as an open-pit mine, which would involve quite a bit of removal of the overburden (costly, and the overburden would need to be put somewhere) Since, the deposits (two of them) are well-defined and in a columar (pipe) configuration, it may be economically possible to extract them using bulk tonnage technology in a UG operation. Start with one pipe first (whichever that has the higher head grade, the east pipe?), and extract to stuff in the other pipe later. These days, a UG operation may be an attractive mining operation as far as EA is concerned (out of sight out of mind advantage).
This should be a good question to pose to AE at the AGM, can someone please do the honour? Pretty sure that all the talented engineers at ZEN and its consulting firms have discussed various mining option among themselves. Sometimes, political considerations (EA is one of them) may play a key part in the decision making process.
In summary, ZEN has (a) a good size deposit; (b) good head grade in a low range which makes it easier to separate from the impurities (Ref: Interview with Dr Ian Flint of Elcora); (c) it can be processed to very high quality graphite suitable for high end batteries. Potential suitors already know all of those factors, they don't even have to wait for a PEA which is just a formality. If a suitor decides to strike it will strike. Those deep pockets have plenty of talented people to play with options.
Just my speculation in trying to figure out what's going on in the heads of those actors.
Cheers,
goldhunter
Replying to @goldhunter11
"In summary, ZEN has (a) a good size deposit; (b) good head grade in a low range which makes it easier to separate from the impurities (Ref: Interview with Dr Ian Flint of Elcora); (c) it can be processed to very high quality graphite suitable for high end batteries. Potential suitors already know all of those factors, they don't even have to wait for a PEA which is just a formality. If a suitor decides to strike it will strike. Those deep pockets have plenty of talented people to play with options.
Just my speculation in trying to figure out what's going on in the heads of those actors."
So the question is: If potential buyers don't need the PEA, then why haven't we had at least one bid?
Replying to @rennie69
That is a good question. It maybe that any potential buyer has a check list of items to go over and having a PEA is one of them. If this was a gold find, I think that Zen would be bought up in a heart beat. However, with graphite and its many applications its science that is going to help sell the deposit. And that takes time.
Try to put yourself in the position of a company that is looking to aquire a deposit and you are responsible for buying. You want to make sure that all bases are covered.
I think that any company looking to buy must perform its own DD, at its own pace. And that pace is never as fast as those that want to be bought out.
Anyway, its all good.
Replying to @rennie69
So the question is: If potential buyers don't need the PEA, then why haven't we had at least one bid?
This is a good question in that it is simple yet fair. We are told, led to believe, that this is a once in a lifetime type deposit with staggering financial returns. Why has an offer not been put forth by someone?
We are surmising that the complexity of the graphite market means we have to wait things out but I would ask this question to AE at the AGM - it deserves an answer.
Replying to @rennie69
Hi Rennie69,
I am not sure that I agree that a potential bidder doesnt require a PEA or at least information contained in a PEA. We all agree that Albany is one of a kind, never been seen before. Zenyatta is still refining the process for extracting and upgrading the graphite to 99%+ purity. We have no idea what those costs numbers are, we can speculate and there has been a fairly wide range put forth here recently. However, I do not expect any firm to slap down a cheque for hundreds of millions if not billions without knowing exactly how much it costs to have the material extracted and upgraded to the desired purity levels as well as knowing exactly what it will sell for. Testing is only now beginning to determine who will pay what and for how many tons.
Something like Zenyatta has never been seen before in the graphite space. Any significant committment for something like this will require significant due dilligence IMO. No miner or company has ever worked with hydrothermal graphite that can be upgraded to 99.95%+ with synthetic like characteristics. If it were me, I would need significant proof that its even possible. You are asking an acquirer to believe that material that currently costs $15k+ per ton is now available in natural form for 1, 2, or 3k per ton to produce?
AE has already stated publicly they are in preliminary discussions with many different entities. I am sure this would include potential aqcuirers. If it was me controlling the purse strings, I would need to be 100% sure that a) the material works for my application (hence testing), b) it is economic to extract and process (PEA) c) if selling to third parties that I had some form of committment from end users.
This isnt like gold where it is fairly easy to estimate costs and you know what the market that you are selling to is willing to pay at any given time.
Yes we have a freak of nature, yes is appears to be some of the best graphite on the planet but IMO opinion, I think that the PEA for Zenyatta is one of the most critical pieces of information this company will ever have produced. It will unlock the value proposition for investors and possible suitors.........this I am willing to bet, will NOT be a sell the news event, I actually believe it will be quite the opposite.
Regards,
Quincey