PDAC

Let's get back to the nitty gritty here folks. We are at a critical stage here of the Compnay development. The PEA delay has us all frustrated and short with tempers and posters.

For those attending the PDAC, here is your chance to get more information for us all. Many of us have tried to procure more intel, personally I have not been able to garner much.

Bit I think there are a really just a few key questions we need answers or clarification on. Obvioulsy if the PEA is not out you can't ask specifics but you can try and find out:

1. Confirmation that the PEA delay is not related to metalurgy issues, rather it is the refining (the delay has been too long to call it tweaking) of the process to get the specific characteritics. Just to settle this once and for all.

2. PEA - how will the sales price be supported?

3. How was the 30% battery target market comment derived. Size of battery market compared to total target market? Percentage of projected production that meets that segment's criteria? Based on one specific end user?

4. Dr. Charar - last news release - easy minerology, little milling refining, etc. If so, why has it taken so long to finalize? I think we are missing a piece to the puzzle in this regard.

5. AE - 'we are close' comment in late December was not accurate? Reason for further delay? Were we all too optimistic from a timeline perspective?

Could ask many more questions, but for me these mare the key ones.

Join the conversation about ZEN Graphene Solutions.

Reply

Replies

  1. I really would of thought ZEN would have put out some new news before this show. Frustrating. I hope some hard questions are asked of the ZEN folks.

    1. I really would of thought ZEN would have put out some new news before this show. Frustrating. I hope some hard questions are asked of the ZEN folks.

      I think you nailed the general sentiment of the board. The hard questions are needed to be asked at this point. Paitence is one thing but we are past that point now.

      For those attending, please ask the pointed questions and let's see if we can get some answers.

      1. Hi I C. My problem with the "answers" you get from PDAC, Can you really rely on them. Ihave heard so many stories from pdac over the years, just to find out....... I only trust nr's from the company itself. Donot want to sound negative, but one learns over time. Good luck to all. Inca.
      2. My question for PDAC and ZEN Team,

        Would be the interpretation of 16th Dec NR and "Why no PEA at this time?"

        Based upon, NR stating they optimized Pilot Plant "Flotation" to a 92.5% concentrate and confirmed the final process "Caustic Bake", normally the process end of the Flowsheet and step used to achieve the highest purity, that no recycling of NaOH is required.

        I presume because Flotation achieved 92.5% as the reason for no recycling.(and low dosage)

        The statement that "NaOH reagent dosage reduced 86%", means less chemical to cleanse impurities and amount required to take 92.5% concentrate to 99.9x% final stage caustic bake process and would mean the flowsheet is complete for Pilot Plant trials, even though end-product purity was not stated. (imo it would be a given 99.9x% High Purity because of the 86% NaOH reduction reason, as they would never state this reduction meaning anything but the best end-product ie., if end-product was too low they would increase NaOH dosage to achieve highest purity)

        I realize that much work will continue for Metallurgy until Minebuild, with the end goal being commercial utilization and production but,

        Why are we still waiting for the PEA? (12 Feb NR did state RPA is now completing the PEA)

        Cheers, Mark

        1. Based upon, NR stating they optimized Pilot Plant "Flotation" to a 92.5% concentrate

          Did I miss something?

          Where did ZEN say that they optimized Pilot Plant flotation to 92.5%? The news release that discussed the Pilot Plant results was September 2014 and no flotation purity number was given. It is my understanding that all subsequent metallurgical work has been performed at laboratory bench scale. In the December news release where Zenyatta mentions a "flotation concentrate of up to 92.5% graphite" (i.e. best case), Stephen Mackie is quoted, "The recent test work, ..."

          No mention of any optimized Pilot Plant. And since the company has not made any claims with respect to optimizing a flotation circuit, I would not assume that they have achieved such a milestone.

          In fact, the company indicated that they would announce the final results of the purification work once completed. Since they have not yet made such an announcement, I assume that the metallurgical work is still in progress.


          1. "Where did ZEN say that they optimized Pilot Plant flotation to 92.5%? The news release that discussed the Pilot Plant results was September 2014 and no flotation purity number was given" Borne2run

            They started Pilot Plant trials after the June delay.

            They stated optimized flotation to 92.5% 16th Dec but forgot Pilot Plant which was clearly detailed 3nd Sept that SGS was in the Pilot Plant Stage of Metallurgy.

            It goes like this Bench Scale 1st, then Pilot Plant 2nd, then Commercialization on site.

            The 2nd Sep NR stated this,

            "Additional test work is underway to produce a higher grade flotation concentrate feed to further optimize the purification process and provide extra high purity material for testing by interested parties. This optimization work will provide additional information for the flow sheet

            I'll draw you a picture in words, in Sept they reported Pilot Plant Metallurgy, and stressed additional test work to more fully optimize the Flotation at the Pilot Plant level. Then in December they reported a higher optimized Flotation at 92.5%, much higher than the previous 78.3% concentrate (give you a hint, 78.3% refers to last report 2nd Sept.)

            So they did what they said, they improved upon Pilot Plant Flotation from 78.3% in Sept to 92.5% in December. I know what you'll say, they didn't mention 78.3% in Sept, but they did in Dec. and they didn't mention Pilot Plant in Dec but they did back in Sept.

            Let common sense prevail, cheers, mark

            1. Replying to @LTGoldBull2

              I am clearly not getting something.

              Are you saying that ZEN ran a Pilot Plant Flotation test after September 2nd?

              I contend that the 92.5% flotation recovery was achieved in a bench scale test(i.e. laboratory or experimental scale), sometime between September 2nd and December 16th.

              Just because one Pilot Plant test is run in the summer does not autmatically mean that all future testing is carried out at Pilot Plant scale. Pilot Plant refers to the scale of testing, not the phase of testing.

              1. Replying to @borne2run

                bourne2run

                I recommend that you give AE or Sandra a call and ask these questions. They would be pleased to hear from any shareholder. You are asking questions on a bulletin board that should be heard from the horses mouth.

                It seems that you don't want to believe what has been said by other posters here.

                if you are uncomfortable with your investment maybe this stock isn't the one to be invested in.

                I am a long term ZEN investor & I am very comfortable with my investment & have talked to all board members when I have had questions concerning the progression of the company.

                I plan on going to PDAC again this year and will voice my concerns & ask questions there.

                GLTA

                DUDE

              2. Replying to @borne2run

                Did you know ZEN used Float concentrates ranging from 46%-90% in the Bench Scale benefication trials in 2013, as reported 25 April of that year.

                "All trials using a simple caustic baking leach process conclusively demonstrated that an ultra-high purity graphite product with >99.97% Carbon (“C”) can be produced from the Albany graphite deposit. The process was successfully applied to a variety of graphite concentrate samples that had initial carbon grades in the range of 46 – 90% using conventional flotation techniques. In all trials the final purity values were >99.97% C and up to 99.99% C in many cases, regardless of initial carbon grades."

                Just didn't matter what the Float Concentrate was, they still got 99.97% purity and some cases 99.99%.

                We've now learned from the Pilot Plant trials, from June thru Dec, that with a high 92.5% Float Concentrate, no NaOH Recycling is needed and with a significant 86% reduction in NaOH reagent dosage to maintain the highest purity. (with no sulfer, no metallic impurities, no further drilling required, no dilution since inception, finances in order etc)

                Cost savings and still 99.9x% purity. Just NR facts!

                Cheers, Mark

  2. 6. Possible financing, Though the news says its not needed yet the math tells a different story.

    "whats the plan?"