lease buildout

buildout plans to edig, Dec 11 11 per sec exhibit: (sure seems like things got moving after first dec 2 interview!)

Prepared By: Debbe Damron

Date: 12/12/2011

Project: E Digital

16870 W. Bernardo Drive

San Diego CA

Project Number: 8300

HERE IS BUILDOUT HVAC AND ELECTRICAL FOR NEW SPACE...APPARENTLY WE'RE GETTING A "CONTENT ROOM", A "SERVER ROOM" A "LAB"AND A HARD LID ROOM (DON'T KNOW WHAT THAT IS) --AND A DIFFUSER TO ROOM #8

15800.000 HVAC 350.00
Add one duct with diffuser to room #8.
16000.000 Electrical 5,250.00
1. Electrical safe off at walls to be removed

2. Install and wire the following switching
a. (2) wall motion sensor/switch

3. Install and wire the following outlets
a. (3) dedicated outlets in content room
b. (3) dedicated outlets in server room
c. (1) dedicated outlets in lab
d. (3) dedicated for cubes
e. (2) dedicated outlets in electric/Mech room
4. Install and wire the following lighting
a. (3) relocated existing 2x4 light fixtures
b. (3) 6" recessed CFL can lights in new hard lid room
5. Install and wire (1) 100amp 120/208vac 30-circuit panel board
fed from existing 200amp panel

Join the conversation about e.Digital.

Reply

Replies

      1. Content intigration upgrades for eVU.

        Also repairs....Beth in charge of both.

        They have a dedicated location at the current office too.

        Man Cave I like better though...lol.

      2. Its nice to see some of the names of these rooms...I think the Content rooms used in the past companies that I worked at (telecom Companies) were actually demo rooms, used for either trainings for existing employees or to demo a service in front of a perspective client.

        Might infer they are going all in on Nunchi...Wish we knew what the nunchi plan was :)