It will be interesting to read the 10q to see how much convertible debt is left near term.  If I am not mistaken, the company has a chunk of shares registered from the large GHS funding committment, which that ends in September.  One would think they woud want to leverage that for "advancing targeted drilling".  So it would seem they have the means for a small to moderate scale drill campaign.  The longer they stay silent on the topic makes me wonder if the bobber has been tugged under water...

Join the conversation about Liberty Star Uranium & Metals.

Reply

Replies

  1. What do you estimate a program at RRC costs sufficient to interest a larger party to fund a full program? $500k? 

    1. hard to say.  I would tend to think they drill near and around where they believe there is evidence of high grade veins either from channel samples or IP indicated under soil cover.  Drill multiple angles from same hole?  A.I. seems to suggest with 500k they could get 20-30 shallow holes versus 5-8 with core.  My understanding is often a drill campaign includes both.


      how much more "de-risking" can they do until they finally drill to confirm their world class concept..


      it seems like drilling is the only way to entice a JV on good terms.  Now maybe they could sign a JV with LBSR also providing some funds to retain higher equity.  They have the GHS facility with shares registered..  They could also start with a smaller program and if intercepts are indicative quickly expand.  





      1. I mean, they got a whole rig out for just two holes before. I think it would be worth drilling some cheap holes to prove the de-risk hypothesis, which might spark interest in RRC. 

        1. And there is always the DIY option (from ChatGPT): 

          If I were preparing a development plan for LBSR's Red Rock Canyon property, I'd make it brutally simple:

          Objective

          Demonstrate that Red Rock Canyon contains gold that can be recovered economically and repeatedly, then use that data to support a JV, sale, financing, or pilot operation.

          The objective is not to build a mine or mill in the first phase.



          Phase 1 – Prove Recoverability (0-6 Months)

          Work Program

          1. Detailed sampling program

            • Channel samples

            • Trench samples

            • Bulk samples from representative zones

          2. Metallurgical testing

            • Fire assay

            • Gravity recovery

            • Bottle-roll cyanide tests

            • Mineralogy

            • Oxide vs sulfide characterization

          3. Initial permitting review

            • Land status

            • Reclamation requirements

            • Processing requirements

          Budget

          $100,000-$300,000

          Deliverable

          A metallurgy package establishing:

          • Head grade

          • Recovery percentage

          • Processing method

          • Preliminary operating costs

          Decision Gate

          Can the gold be recovered economically?

          If no, stop.

          If yes, proceed.



          Phase 2 – Bulk Sample & Toll Processing (6-12 Months)

          Work Program

          Extract:

          • 100-1,000 tons of representative ore

          Transport to a permitted third-party precious metals processor for a commercial-scale test run.

          Objectives

          Establish:

          • Actual recovery

          • Actual costs

          • Actual payable ounces

          • Actual transportation economics

          Budget

          $250,000-$750,000

          Deliverable

          Recovered gold and operating data.

          This is the first point at which the project moves from exploration theory to demonstrated economics.

          Decision Gate

          Does the project generate attractive margins on a per-ton basis?

          If no, stop.

          If yes, proceed.



          Phase 3 – Pilot Production (12-24 Months)

          Assuming the ore proves amenable to simple recovery:

          Equipment

          • Jaw crusher

          • Ball mill

          • Classifier

          • Centrifugal concentrator

          • Shaker table

          • Water recirculation system

          Throughput

          10-50 TPD

          Capital Cost

          ItemEstimated Cost
          Used processing equipment$50k-$150k
          Site preparation$50k-$150k
          Power & water systems$50k-$100k
          Permitting & environmental$50k-$250k
          Contingency$50k-$150k
          Total$250k-$800k

          Objective

          Produce recoverable ounces on a repeatable basis.

          Deliverable

          A functioning pilot operation with demonstrated economics.



          Phase 4 – Commercial Decision (24+ Months)

          At this point LBSR has four potential paths:

          Option A – Expand Production

          Increase throughput and build a larger operation.

          Option B – Joint Venture

          Bring in an operating partner with mining expertise and capital.

          Option C – Sell the Project

          Market a de-risked asset with demonstrated recoverability.

          Option D – Royalty Model

          Retain ownership and monetize through royalties or streaming.


          What Investors Will Care About

          The first three questions every serious mining investor will ask are:

          1. What is the recoverable grade?

          2. What is the recovery percentage?

          3. What is the cost per recovered ounce?

          Everything in this plan is designed to answer those questions as quickly and cheaply as possible.

          Accordingly, I would allocate roughly:

          • 60% of early capital to geology and metallurgy

          • 25% to bulk sampling and toll processing

          • 15% to permitting and engineering