Skip to content
Sign in

Post

Probe Mines

You’re reading Junior112’s reply in this thread.Jump to it

Prez3.6 rating from 226 members16.1K ptsRate

Math on original

The attached table summarizes the Black Creek chromite mineral resource estimate at a cut-off grade of 30 per cent chromium (III) oxide.

         SUMMARY OF BLACK CREEK CHROMITE RESOURCES                                   
                                                                           
Category              Tonnes     Avg. Cr2O3 (%)   Cr:Fe Ratio

Measured (M)       3,729,000             39.90            1.8
Indicated (I)      1,985,000             40.06            1.8
Total M & I        5,714,000             40.00            1.8
Inferred           2,726,000             40.99            1.9
NR   indicates.... 200M strike  length  and  65M  average  width and   175 thickness.... 
thus sp G  would   be  about 3.7  to   equal 8.4  MM  tones total
I think  3.7  is a little  high but  that  what makes  this   add  up.
200 x 175 x 65 x 3.7 = 8.4 MM tones
-----------------------------------------------------------------------------------------------
2nd   43 101
Drilling  confirmed increase in strike  length  of  115  meter tto 315M  and additional   depth to  320 meters.
If  the  width   remains  constant  then the  math  works  out  like  this:
315 x 320 x 65 x  3.7 = 24 MM  tones
Thats a  pretty  big  discrepancy especially  when the  cutoff  has  been  reduced from 30 to 20%
Something  just  doesn't  add  up  here!

The table summarizes the Black Creek chromite mineral resource estimate at a cut-off grade of 20 per cent Cr2O3 including internal waste.

                  SUMMARY OF BLACK CREEK CHROMITE RESOURCES

                                                 Average
Category                           Tonnes       Cr2O3 (%)     Cr:Fe ratio

Measured (M)                    5,256,000          37.00              1.8
Indicated (I)                   3,389,000          38.04              1.8
Total M&I                       8,645,000          37.41              1.8
Inferred                        1,610,000          37.78              1.7

Join the conversation about Probe Mines.

Reply

Replies

  1. I tried phoning the company but got the answer machine. Guess they are on holidays or out of office. I was going to ask why the difference in cutoff. But now i see this too and have to wonder what is up ? HMMM... You would think it would increase alot more. JMO. Thanks Res for pointing that out.