Skip to content
Sign in

Post

Probe Mines

You’re reading warrantlessbob’s reply in this thread.Jump to it

Treasurer2.9 rating from 117 members3.8K ptsRate

math on original

Would Dave please explain the new B.C. estimate to confused investors who obviously had a very much different expectation from yesterday,s news release.It seems that the calculation method had differed a lot between all the major stake holders around the region and created much confusion.Initially,we were told that the phase three driling had almost doubled the oringial resource estimate.So why after the much anticipated wait,the tonnage had barely changed.No wonder some investors pulled out soon after the news release.

Join the conversation about Probe Mines.

Reply

Replies

  1. siegfried,

    Have no experience with resource calculations but suspect that the issue surrounding the major drop in tonnage relates directly to the hole that missed the Chromate . The computer program or programer would possibly allow for some distance around the blank zone, possibly as much as 50 m. This would immediately take out a big chunk of the strike length. Additional drilling around this zone may identify how large the gap is and the resource calculation re-run with these limits. Will Dave re-drill and get real data so the programer know the limits of this blank area, who knows.

    Just my thoughts

    MH

    1. What about the depth..... seams the additional depth did not make it into the calc either.

      Simply reducing the cutoff from 30% to 20% has a marked increase in tonage this is evident by the reduction in average grade indicated on the 2nd resource est. The overall average grade reduced about 3% and would nearly account for the additional tonage on it's own. Seams to me like the additional holes only achieved moving more of the inferered into the measured and indicated.

      This new resource estimate has been lowballed! Period!

      JMHO

      1. I agree with the 'low ball' however, IMO there is not many professionals out there that go out on the limb. Their arguement about how large the gap is on both the horizontal and vertical plain is just as valid as mine. If the nearest holes to the gap hole is 50 m away, the data entered into the model will take that into account. Do they allow for a mid point, say 25 m around the blank and what is the risk to doing this, I don't know.

        Real data, drill holes to establish the gap dimension limit are needed. In my view this is the only way we get back to 15 to 20 million tonnes. Why this was not done when the drill and crew was there I don't know. Again in my view the 30 or 40 % chromate, or the gap would have been logged by the geo, its not like 5 gram gold which is not visible.

        MH