Skip to content
Sign in

Post

Probe Mines

You’re reading goldhunter11’s reply in this thread.Jump to it

Treasurer2.9 rating from 208 members7.7K ptsRate

From Stockwatch...

Gold Summary for Feb. 11, 2014

...

David Palmer's Probe Mines Inc. (PRB) continued its climb, rising 21 cents to $3.01 on 697,000 shares. The stock is at a new all-time high, thanks to yesterday's pleasing round of assays from the Borden gold property in Ontario. Probe plans to continue drilling at Borden through the winter, in hopes of proving a high-grade gold zone extends under Borden lake. Probe has yet to announce a resource estimate for the high-grade area, but newsletter writer John Kaiser has been talking up a potential 1.4 million ounces. The company has a 4.3-million-ounce resource estimate for Borden's lower-grade zone, but that will not support profitable production unless gold returns to $1,300 an ounce. A mine in the high-grade area would also encounter some obstacles, such as the 200-metre wedge of land owned by two lumber companies. Probe has been in negotiations for the past several months. With luck, the company can close the deal before Borden results prompt a handful of juniors to come knocking and pay more, eager to get in on an area play.

President Palmer, a career geologist, has been with the company since 2003. He spent his first seven years at Probe looking for chromite in Ontario's Ring of Fire area. In 2010, Probe acquired the Borden property as a side story, but the first assays ended up more promising than results from Probe's Black Creek chromite property. Soon after, the company turned its full attention to gold. Mr. Palmer owns 1.12 million shares, the value of which has risen by $2.1 million since last spring. For his hard work in 2013 -- which included selling 7.5 million shares, or 9.9 per cent of the company, to Agnico Eagle Mines Ltd. (AEM: $37.57) -- Mr. Palmer received $350,000 in salary and bonus. This is many raises and 10 times higher than the $35,000 he received in 2004, his first full year with the company.

Join the conversation about Probe Mines.

Reply

Replies

  1. BarbuB

    Stockwatch quote "...but newsletter writer John Kaiser has been talking up a potential 1.4 million ounces".

    If I am not mistaken, Kaiser's guesstimate of potential 1.4Moz for the HGZ was done before the release of the glory hole, hole #273 with 2m @ 238 gpt (238/28.34 = 8.4 oz Au per tonne which is phenomenal) and open at depth. This section of 2m @ 238 gpt is equivalent to 158m @ 3gpt, if the intercepts are converted to a common grade (for my simple shoebox model). If the average values 39.0 m @ 16.3 gpt are used to take into account the other rich setions just above it then we have some 39m x 16.3/3 = 212 m @ 3gpt.

    If we have a few more of these holes along the way then the shoebox would be quite chubby resulting in a lot more oz for the HGZ. It should not be unrealistic to come up with 4Moz (up to 2000 SE) with this chubby box, or at least it has big lumps along the way (like a boa constrictor after swallowing a few big rats). And if the HGZ extends over the entire lake then x2 would give a potential 8M oz (very rough guesstimate). This 8M HGZ + the LGZ of 4.3 M = Et voila 12M ozAu... YeeHaw!

    Some speculations:

    @ $55/oz : 12 x 55= $660M in-situ ~ x3 Market Cap, SP = $9/s

    @ over $70/oz (TRR price tag) ~ x4 Market Cap, SP = $12/s

    goldhunter

    1. Can anyone explain the follow quote from the press release.

      "Although the HGZ mineralization displays remarkable consistency along strike, it is anticipated that any future Resource Estimates will employ a top-cut in their calculation. Depths of the mineralized zones are between 380 and 660 metres vertical depth"

      Does this mean that these results will not be included because they are not part of the "top cut".

      Could this be why John Kaiser estimates are lower than we expect.

    2. does anyone know what this quote from the release means

      "Although the HGZ mineralization displays remarkable consistency along strike, it is anticipated that any future Resource Estimates will employ a top-cut in their calculation. Depths of the mineralized zones are between 380 and 660 metres vertical depth. All intervals approximate true width. "

      Does this mean these values will not be included in the resource estimate. Is this why John Kaiser estimates are lower than we are hoping for?

      1. The quote means that they will reduce grades that exceed a statistical range to a statistical maximum grade. Basically they are saying the very high grade is an anomaly and its influence in the grade calculation should be limited to make the grade calculation more conservative. With visible gold its possible that you could drill a foot away and hit 3 g/t. The flip side also holds true in that a foot away from that 3g/t intercept may be visible gold As they get more experience with the HGZ they will determine what that cut grade should be. When they go underground they will get a much better handle on grade controls. Up until now they haven't hit any very high grade intercepts so it hasn't been an issue. .... Been There
      2. goldenB

        Correct me if I am wrong, but I believe this is a double post.

        Anyway, here is some interpretation/comments:

        - HGZ: The depth of the HGZ varies from "shallow to deeper" as indicated in the NR. Take a quick look at some x-sections shown in PRB website.

        - Top-cut: Some of the sections show extremely high grades. In fact it would be informative to show the actual assay values to give people some sense of the variation of the deposit grade. There is an attempt to average out the section as shown in the NR, essentially to flatten out the peaks.

        PRB would estimate the potential resource using its sophisticate model to crank out the numbers. In addition, they would be expected to have some kind of visualization model, e.g. Corebox, which show various zones, high, medium low grades.

        Kaiser: His guesstimate is much less sophisticated since he does not have the detailed information and the sophisticated sofware. Sometime analysts just "eyeball" the results and use very simple models to come up with a rough, order of magnitude, value. Conservative analysts would tend to underestimate the resource to protect their reputation and to come up with a lower value for their target SP. Others for other reasons may overestimate the resource to pump up the SP. The game people play.

        Hope the above would help.

        goldhunter