Lucrum - Sheltered Oak amalgamation receives conditional approval. Closing expected to occur on Aug. 27, 2008. Lots of stuff (i.e. 'Filing Statement' 149 pages; 'Technical Report on Kerrs Gold Property' 131 pages; etc.) filed on sedar.com for Lucrum Capital Corp. but does not appear to be showing up yet... but documents are showing up on 'sedar' section of stockwatch.com if anyone has access.

Haven't been through Technical Report (dated June 15, 2008) yet but is quite detailed with lots of maps, diagrams, and recommendations. A couple of interesting quotes re: 2008 drill program... no mention of assays but see third quote below...

"On May 15, 2008, the phase 2 extended drilling program commenced with the completion of one drill hole (DDH K-08-20) to provide sufficient costing to meet the prior expenditure commitment of $100,000 for a qualifying transaction."

"DDH K-08-20: DDH K-08-20 was collared on line 7+00N and 5+75W at an azimuth of 132° with a dip of -60°. The hole was drilled to a total depth of 386 m and planned to test the up-dip extent of the GCQ zone intersected in DDH K-05-06. A thick intercalated sequence of mafic pillow flows, feldspar porphyry and ultramafic flows was intersected from 54m to 271.6 m. This sequence was followed by a highly magnetic, serpentinized, siliceous ultramafic flow sequence from 271.6 m to 350.1 m overlying a silicified mafic feldspar porphyry unit to the end of the hole at 386 m. The altered, silicified stratigraphy from 202.8m to 350.1 m suggests proximity to the GQC zone intersected in K-05-01 which is located along strike at 400m to the northeast."

"The 2008 Phase 2 extended drilling program employed the same supervision stated above. However, Salo Drilling, based in Kirkland lake was contracted to carry out the drilling, staging their operations from Timmins. HCG personnel transported the core from the Kerrs Property to a core processing facility located at the Wahgoshig First Nation, 20 km. from the project site. The drill core from hole K-08-20 was logged with no sample intervals identified until approval for the phase 3 program is granted by SOR."

This 2008 hole not assayed for obvious reasons (i.e. amalgamation had to be finalized). Additonal 1,700m drilling program planned to commence very soon.

Based on my calculations, SGX could own more than 10% of this amalgamated company... assuming they exercise right to participate in $500k PP... they also still have 45% ownership of Kerrs, will be operator responsible for all prospecting, exploration, development and mining operations, will receive a management fee equivalent to 15% of the Exploration Expenditures... PLUS... SGX "will have a “Back-in Option” which will allow Sage to maintain operating and ownership control of the Kerrs property."

Long time coming but GREAT to have this done... especially in light of recent and pending EXS-v results... remember we have been told SGX has adjusted drilling plans because of EXS-v discovery.

I have lots of reading to do. :D

red911



Lucrum receives TSX-V approval for Sheltered Oak QT



2008-08-18 16:24 ET - News Release

Mr. Patrick Morris reports

LUCRUM CAPITAL CORP. ANNOUNCES RECEIPT OF CONDITIONAL APPROVAL FOR QUALIFYING TRANSACTION AND FILING OF FILING STATEMENT

Further the news release reported in Stockwatch on June 2, 2008, Lucrum Capital Corp. has received the conditional approval of the TSX Venture Exchange (TSX-V) for the acquisition by Lucrum of all of the issued and outstanding shares of Sheltered Oak Resources Inc., pursuant to an amalgamation agreement dated May 29, 2008, as amended on Aug. 14, 2008. Sheltered Oak will amalgamate with Lucrum Acquisition Corp. and the amalgamated entity will become a wholly owned subsidiary of Lucrum.

Subject to final approval from the TSX-V, and the closing of the acquisition, the transaction will constitute Lucrum's qualifying transaction. Lucrum anticipates that the closing of the qualifying transaction will occur on Aug. 27, 2008. Details of the proposed transaction are contained in the filing statement dated Aug. 18, 2008, which has been filed on the SEDAR website.

We seek Safe Harbor.

Join the conversation about Sage Gold Inc.

Reply

Replies

  1. Thanks Red



    One long delay overcome , i bet Kerr,s will be drilled Sept 1, if any of you missed awhile back on sgx website it said Kerr,s drilling started!!! It did start and was stopped until Sheltered becomes public.

    1. I remember the 'drilling has started' notice posted on the website re: Kerrs... was a little disappointed when it unexpectedly disappeared with no notice but soon found out reason was a good one.

      re: drilling at Kerrs... I now notice all documents I referenced previous are posted on sedar here. Among these there is also a drilling contract signed February 1, 2008. Pretty standard stuff I would assume but very interesting for me as I have never actually seen one before... detailed operating costs, daily reports, mobilization, storage, confidentiality clauses, security, moving costs, etc. etc. Fun to read IMO.

      According to this drilling contract a minimum of 2,100m (400m hole already drilled, 1,700m to be drilled) and a maximum of 8,000m will be drilled but there is an option to extend contract. Maximum hole depth 500m, minimum hole depth 50m.

      Remember, Kerrs used to be 'the property' for SGX before Jacobus and Onaman, etc. Nigel always said there is a mine there but they just haven't found it yet. A very reliable poster said that EXS did get intelligence from SGX regarding hole location for their most recent drill campaign (i.e. 16.6 G/T AU OVER 12.0m)... we have also been told SGX has altered drilling plans in light of this NEW significant discovery by EXS... therefore, I am sure if SGX did share 'their toys' with EXS... EXS will return/is returning the favour.

      For those who don't realize this... previous Kerrs drilling was further NW (along SGX 'trend') from recent EXS discovery hole... SGX has never drilled near where EXS is drilling. To see how close EXS drilling is to SGX Kerrs property see excellent longbomb map here and here (only approx. locations I know but I think they are very close to true locations). People should also note HOW BIG Kerrs property has become... the entire northern, eastern and western sections of SGX claims on this map are new... size of Kerrs property has increased from ~2,200 acres in 2004 to 18,883 acres in Feb 2007 (i.e. x9).

      I have posted this before and will likely post again to remind people... there has been alot of work ongoing during these quiet summer months. Results of this work will pay off in the coming months IMO.

      red911