Skip to content
Sign in

Post

St. Elias Mines

You’re reading greaser10’s reply in this thread.Jump to it

Prez3.7 rating from 109 members15.2K ptsRate

Future Math

Just looking back at the Gluckstein & Silverspoon NR, as well as various other NR, anyway, looks like they used a 32% scaling factor from the Estimated Ore Tonnage, and the NI 43-101 Inferred Ore Tonnage. They also used 2.7 T/M3, and the 43101 used 2.75 T/M3, but I still like 2.5 T/M3 (just to be a little more conservative)

Just wondering if we all want to use the same constants in the future, so we all do it the same way:

Once you calculate your volume then multiply by 2.5 T/M3 then multiply by 0.32 (scaling factor) then by your estimated g/T then multiply by 1OZ/31.1g

Bottom Line instead of using the Ovoid Formula (which scales by approx half) we will now even scale it more by multiplying by this new scaling factor.

ST. ELIAS MINES LTD. - 43-101 Inferred Mineral Resource - 4,290 tonnes @ 1.04 oz/t Au - Tesoro Gold Project, Peru

Join the conversation about St. Elias Mines.

Reply

Replies

  1. Thank you for your post Bow, I am continuing to learn more each day. For those that aren’t familiar with the term scaling factor, (as I am, and had to look it up) it refers to “r”, a “classification factor” pertinent to an arbitrary mathematical value assigned to the probability for recovery of metal ores. (see original post by Bow2U)

    I apologize for posting values and not being familiar with mining terms and methods, and only able to use simple math. Nevertheless it is important to try and ascertain the relative size of the red center of the anomaly as it represents the high conductivity values and reflects the very high grade surface veins (1-3+ounces per ton) Again the drills will confirm the levels.

    Using a weight per ton of 2.5 rather than 2 and then multiply x .32 scaling factor

    For the strawberry coloured volume, using 2.5 x 137.8m3= 344.5 million x .32 and this calculation is 110 million tonnes

    The pink volume is, using 2.5 x 116 = 290 million tonnesx .32 = 92.8 million tonnes

    Once the cross sections are published then a more accurate value of the volumes can quickly be determined. In the meantime I think using the model gives an insight to the volume of the of the higher grade ore depicted in the website picture.

    I think it is obvious that one has to assign a substantially higher value for the strawberry portion, because there is such high grade surface veins with known values. One might assign a one ounce per tonne value for the 110 million tonnes, for example.

    1. I get a message that my post is denied because "I'm not logged in." If I refresh the page then I am again logged in. Anyone else have this problem?. I was correcting (deleting) "arbitrary" and replacing it with "mathematical %" and suddenly I'm logged in and the uncorrected post is posted.

      1. You may have exceeded the 5 minute window in which to edit your post while you were making the corrections. Happened to me once.

    2. Absolutely no need to apologize Greaser, I don't think any of us were using this, including myself. If it is even the correct way to do, I'm not sure? But, I do like scaling all these numbers as much as possible. Using the smallest possible g/T, etc, anything to give us smaller numbers, cause even when we do that, the numbers are still mind boggling!

      I was going through the G&S NR this morning, and found that again, cause I had forgot about it.

      Just a thought though, if we all use the same info & constants, and probably help newer readers to this board when we're crunching numbers.

      I do love seeing the Math, even if we know we need the Drills first!

  2. Hey BOW, by looking at this;

    In the Report, an inferred mineral resource of 4,290 tonnes grading 1.04 oz./t gold with a total

    gold content of 4,460 ounces has been calculated for the C1 Vein based on assay results from

    existing underground workings. The C1 Vein is open to the east on all levels and to depth. A

    conservative figure of 100 meters was used for the length of the vein in the resource estimate and

    the depth of the evaluated part of the vein is considered to be 100 meters in the resource

    estimate.

    By looking at this, that resource calculation, came from a very small area. I think I read that the general width of this vein is a couple-3 feet. That in its self is a lot of gold to come from that small area.

    1. Ya you're right Sculpin. They used a width of 0.5 M. And that's how they got the scaling factor.

      Estimated Ore Tonnage was:

      100M X 100M X 0.5M X 2.7T/M3 = 13,500 T

      NI 43-101 Inferred Ore Tonnage was 4,290 T

      So, 4290T/13,500T = 0.32