  1. Once again, I was the only investor attending the AGM. The official business was over in a couple of minutes. I got a quick update from Jim. Nothing new really, namely:

    La Yesca:

    • The mill is fully outfitted with all the equipment needed. Currently processing approximately 250tpd.
    • Actual tailing grades are about 10% lower than previously thought, that's why the targeted output had been increased from 200 to 250tpd to compensate
    • Mexican governemnt is likely going to kick in some more money to drill more holes around Xora. There is great potential there but the recently drilling hasn't hit the right place.

    MacFaulds:

    • Funds for 55% earn-in has been fully spent recently
    • Crews are currently over at MacFaulds #3 to prepare for driling
    • Assay turnaround time is approximately 4-6 weeks for results

    At last year's AGM, Jim sat in front of me and shared his plan to build the La Yesca mill. His vision and excitement was contageous. One year later, he's done what he set out to do.

    For those of us looking for news every day, it's easy to criticize the pace of progress. But when you think of all the work Jim's done: the road building, earth moving, bulldozer breakdown, ball mill upgrate, tailling tank installation and power supply problems, it must have been a proud moment to see the mill finally up and running. Year over year, he accomplished what he set out to do.

    Thanks Jim, and congrats again.

    LD

    1. .

      LargeDeposit
      .
      Thank you very much for attending and sharing this information about LaYesca and McFaulds.
      .
      Its good to hear that the Mexican Governement may kick in more drill money, I think that they want to see this prove up just the same as us share holders.
      .
      Looks like they will be drilling very shortly at McFaulds #3 which is good news.
      .
      LD......
      .
      Do you know if they completed the 1000 km airborne survey using the SHA three-axis, helicopter towed, magnetic gradiometer and VLF-EM system? I would think if they are setting up to drill then that would be completed.
      .
      Thanks again for getting back to us..
      .
      ......RL
      1. With the 55% earn-in already completed, they must have already spent money on survey and drilling. But we didn't discuss the progress of the airborne survey specifically.

        For the Mexican government, mining means jobs and better economy. So they have a vested interest in having mines developed in the area even if it's on UC's land. In-fact the arrangements are such that UC is being paid by the Mexican government to drill on UC owned land. So the drilling around Xora currently doesn't cost UC anything.

        Jim did say that his preoccupation currently is fine tuning La Yesca to find the "sweet spot" in mill operation in order to make a few "million bucks". Not sure if he meant revenue or net cash flow.

        LD

        1. By the way folks. The post crafted by "Large Deposit" being referred to was created in 2010. It follows in its entirety below. Read it and weep:

          "Once again, I was the only investor attending the AGM. The official business was over in a couple of minutes. I got a quick update from Jim. Nothing new really, namely:

          La Yesca:

          • The mill is fully outfitted with all the equipment needed. Currently processing approximately 250tpd.
          • Actual tailing grades are about 10% lower than previously thought, that's why the targeted output had been increased from 200 to 250tpd to compensate
          • Mexican governemnt is likely going to kick in some more money to drill more holes around Xora. There is great potential there but the recently drilling hasn't hit the right place.

          MacFaulds:

          • Funds for 55% earn-in has been fully spent recently
          • Crews are currently over at MacFaulds #3 to prepare for driling
          • Assay turnaround time is approximately 4-6 weeks for results

          At last year's AGM, Jim sat in front of me and shared his plan to build the La Yesca mill. His vision and excitement was contageous. One year later, he's done what he set out to do.

          For those of us looking for news every day, it's easy to criticize the pace of progress. But when you think of all the work Jim's done: the road building, earth moving, bulldozer breakdown, ball mill upgrate, tailling tank installation and power supply problems, it must have been a proud moment to see the mill finally up and running. Year over year, he accomplished what he set out to do.

          Thanks Jim, and congrats again."