2 new licences in Kakwa east
Both from the 07-10-63-6 pad : 08-11-63-6 01-11-63-6 They are moving south and west. So probably will one rig derisk new land and the other rig will drill infill wells. Cheers
Treasurer
Questerre Energy CorporationBoth from the 07-10-63-6 pad : 08-11-63-6 01-11-63-6 They are moving south and west. So probably will one rig derisk new land and the other rig will drill infill wells. Cheers
http://www.iii.co.uk/articles/167998/view-top-tomco-energy-interview
Replied in thread
I should have fired the editor, but he is me. Sorry! But the heading might work like a magnet on persons who wonders what the heck upate is and can't resist checking it out :)
Qec is currently conducting a well program at the wellsite 07-19 where the first well (08-20) is completed. The well encountered about 1983 m of Montney reservoir. This well was drilled ahead of schedule which will improve well economic.The second well (02/02-18) was spuded…
Yesterday the QEC HZ KAKWA 16-7-62-5 was spudded. Let et us hope they can avoid sour gas at this well. I guess they have listed out what sections in the previous 15-1 well that contributed with sour gas. These wells are very important for Qec to fill their 6000 boed comitments…
Replied in thread
As the 16-25 and 16-17 is lined in in primo/medio February, the production will be steady with a normal decline until the two new wells 15-30 and 14-30 is brought on production some time in May. Then the next two wells at 7-19 will be placed on production August/Sept. Is it fair…