Replied in thread
Re: Re phase2
Sorry, there are 9 drill holes planned for Phase 1 and 10 for Phase 2. There are 19 drill holes in Phase 1 & 2. Could there have been that many?
Replied in thread
Sorry, there are 9 drill holes planned for Phase 1 and 10 for Phase 2. There are 19 drill holes in Phase 1 & 2. Could there have been that many?
Replied in thread
I have a hard time imagining what Teck is drilling for $15 million if it is not Phase 2. According to the FS the whole of the Phase 1 budget was $2.129 million. That included 8 drill holes and a Titan survey. Phase 2 budget was supposed to be $1.391 million for 10 drillholes to…
Replied in thread
Thank you BigBuck for taking the time to go to the meeting and report back. I found it interesting that they made the claim SC was worth more than GC, and that Teck did an aerial survey of the land inbetween. I wonder if Teck is thinking of buying out NovaGold? That would be a…
Replied in thread
We are engaged in a facilities study agreement with BCHydro, that is similar to a feasibility study, for which we are committed to paying at least $1 million. This is not connected to a production decision at this point--they are looking at costs and timing and then locking up…
Replied in thread
I would like to have some information about our current situation. These would be my questions if I were able to ask them, 1. What is the status of the EA? Is Teck planning on submitting the EA soon? Is it possible Teck will try and incorporate any of the drill results from this…
Replied in thread
I hope someone asks if they plan on revising the BFS at the AGM. I don't think we're going to get this information anymore from management, or at least not in a timely manner. Now that Teck is the operator, we are kind of left out of the loop in terms of the ongoing…