Welcome To The Manicougan Minerals Inc. HUB On AGORACOM

Edit this title from the Fast Facts Section

Free
AGORACOM NEWS FLASH

Dear Agoracom Family,

I want to thank all of you for your patience with us over the past 48 hours and apologize for what was admittedly a botched launch of our new site.

As you can see, we have reverted back to the previous version of the site while we address multiple forum functionality flaws that inexplicably made their way into the launch.

To this end:

1.We have identified 8 fundamental but easily fixable flaws that will be corrected in the coming week, so that you can continue to use the forums exactly as you've been accustomed to.

2.Additionally we will also be implementing a couple of design improvements to "tighten up" the look and feel of the forums.

Have a great Sunday, especially those of you like me that are celebrating Orthodox Easter ... As well as those of you who are also like me and mourning another Maple Leafs Game 7 exit ... Ugggh!

Sincerely,

George et al

Message: Kasagiminnis Lake Phase One Drill Results

----- Kasagiminnis Lake Phase One Drill Results
----------------------------------------------------------------------------
Hole From (m) To (m) Length (m) Au gpt AA Au gpt Grav.
KAS-11-01 116.7 127.8 11.1 2.82 2.76
incl. 120.7 125.7 5.0 4.55 4.45
KAS-11-02 hole abandoned
KAS-11-03 hole abandoned
KAS-11-04 126.1 134.0 7.9 6.60 7.24
incl. 126.1 128.0 1.9 12.86 12.70
KAS-11-05 67.5 70.5 3.0 2.52 2.21
and 75.5 77.5 2.0 5.20 6.02
KAS-11-06 63.5 64.5 1.0 4.21 3.79
and 98.3 99.7 1.4 6.24 7.05
KAS-11-07 27.7 51.7 24.0 0.69 0.83
incl. 27.7 28.5 0.8 6.95 8.94
KAS-11-08 71.3 93.0 21.7 1.85 1.91
incl. 72.3 74.8 2.5 4.60 5.70
and 83.6 87.0 3.4 4.49 4.78
KAS-11-09 49.5 57.5 8.0 2.91 2.79
incl. 49.5 51.3 1.8 4.73 5.22
and 54.2 55.7 1.5 5.80 5.62
----------------------------------------------------------------------------
note: true widths are currently estimated at 50-80% of drilled widths
----------------------------------------------------------------------------
Kasagiminnis Lake Phase 2 Drill Results
----------------------------------------------------------------------------
Hole From (m) To (m) Length (m) Au gpt AA Au gpt Grav.
KAS-11-10 hole abandoned
KAS-11-11 229.7 230.7 1.0 5.64 4.88
KAS-11-12 231.0 232.0 1.0 2.64 2.12
KAS-11-13 204.3 205.3 1.0 2.07 NA
KAS-11-14 233.8 234.8 1.0 5.85 3.62
and 240.0 241.0 1.0 6.21 6.80
----------------------------------------------------------------------------
note: true widths are currently estimated at 50-65% of drilled widths

Share
New Message
Please login to post a reply