Skip to content
Sign in

Post

San Gold Corporation

You’re reading traps7’s reply in this thread.Jump to it

Replies

  1. ,, a good place too look http://www.corebox.net/properties/rice_lake?tool=5 , is under the three headings, 3 d, sections & interceps. Under interceps, the blue dots are the last reported since May 11. One well notice how the blue dots ( infill drilling ) continue the ore body in all directions and this 78000 meters represents likly none if little of the 200,000 meter done this yr. High lite google earth from the core box and allow, when prompt, and all the dots well show up over the area East of the mine. Dale, metion on the last conference call that he would like to see the measured & proven section of the 43-101 moved up so alot of the inferred that TD was crying about months back well be up here. PS" looking forward to good numbers from the Deeps, Traps7

    1. SUMMARY OF RICE LAKE PROJECT RESOURCES (at June 30, 2010)

      Tons Grade Contained

      oz./ton (g/tonne) Ounces

      Rice Lake Mine

      Measured Mineral Resources 388,200 0.24 (8.2) 91,175

      Indicated Mineral Resources 642,240 0.25 (8.6) 163,090

      Total Measured and Indicated Resources 1,030,440 0.25 (8.6) 254,265

      Inferred Mineral Resources 1,519,750 0.29 (9.9) 439,090

      Hinge Mine

      Measured Mineral Resources 91,790 0.29 (9.9) 26,510

      Indicated Mineral Resources 425,670 0.40 (13.7) 171,190

      Total Measured and Indicated Resources 517,460 0.38 (13.0) 197,700

      Inferred Mineral Resources 1,375,200 0.39 (13.4) 538,700

      SG1 Mine (currently on care and maintenance status)

      Indicated Mineral Resources 214,200 0.24 (8.2) 52,150

      Inferred Mineral Resources 936,500 0.22 (7.5) 206,900

      007 Zone

      Indicated Mineral Resources 305,240 0.75 (25.7) 230,330

      Inferred Mineral Resources 398,200 0.47 (16.1) 186,980

      GEOE

      X

      LIMITED

      San Gold Rice Lake Project, October 2010 Page 5

      Cohiba Zone

      Indicated Mineral Resources 55,970 0.23 (7.9) 12,675

      Inferred Mineral Resources 25,210 0.16 (5.5) 4,050

      Cartwright Zone

      Indicated Mineral Resources 136,200 0.22 (7.5) 29,830

      Inferred Mineral Resources 1,761,200 0.21 (7.2) 388,940

      SG-2 and SG-3 Zones

      Indicated Mineral Resources 173,100 0.20 (6.8) 35,320

      Inferred Mineral Resources 195,600 0.26 (8.9) 50,210

      Rice Lake Project

      Total Measured plus Indicated 2,432,610 0.33 (11.3) 812,270

      Total Inferred Resources 6,211,660 0.29 (9.9) 1,814,870

      The mineral resources are in-situ, undiluted, and uncapped and have not had economic parameters applied to them.

      The following table, with an effective date of June 30, 2010, summarizes the mineral reserves for the Rice Lake Project.

      Note that the numbers have been rounded from the detailed resource estimates. The reader is referred to the Appendices

      of this Report for details of the reserve estimates.

      SUMMARY OF RICE LAKE PROJECT RESERVES (at June 30, 2010)

      Tons Grade Contained

      oz./ton (g/tonne) Ounces

      Rice Lake Mine

      Proven Mineral Reserves 414,000 0.22 (7.5) 91,175

      Probable Mineral Reserves 753,320 0.22 (7.5) 163,090

      Total Proven and Probable Reserves 1,166,320 0.22 (7.5) 254,265

      Hinge Mine

      Proven Mineral Reserves 114,740 0.23 (7.9) 26,510

      Probable Mineral Reserves 532,085 0.32 (11.0) 171,190

      Total Proven and Probable Reserves 646,825 0.31 (10.6) 197,700

      SG1 Mine (currently on care and maintenance status)

      Probable Mineral Reserves 180,150 0.26 (8.9) 47,110

      007 Zone

      Probable Mineral Reserves 381,550 0.60 (20.7) 225,545

      Cohiba Zone

      Probable Mineral Reserves 69,960 0.18 (6.2) 12,675

      Cartwright Zone

      Probable Mineral Reserves 170,250 0.18 (6.2) 29,830

      Rice Lake Project

      Total Proven and Probable Reserves 2,615,055 0.29 (9.9) 767,125

      The 2009 bulk sample milling at Hinge recovered 16,052 ounces of gold. Assuming 93% mill recovery, 95% mine

      recovery, and 20% dilution the bulk sample equates to an in-situ resource of 45,000 tonnes grading 0.38 ounces per ton.

      This reconciles well with the average grade of the Hinge uncapped measured plus indicated resources. Further, monthly

      average grade fed to the mill (based on hourly mill belt samples) ranged from 0.25 to 0.64 ounces per ton, which

      indicates the variability of average grades over an area approximately 400 feet high by 700 feet along strike.

      Reconciliation of Company’s diluted, recoverable reserve estimates based on assay data, underground face samples, and

      mill belt samples indicate that the sampling and assaying protocols are providing good quality data.

      GEOE

      X

      LIMITED

      San Gold Rice Lake Project, October 2010 Page 6

      The Company monitors the QAQC information for the assaying process on a regular basis (standards and blanks sent to

      assay laboratories and the duplicates and replicates done by the laboratories). The Author has reviewed this information

      and found no serious discrepancies that had not been recognized and dealt with by the Company geologists.

      The mineral resources are defined in terms of NI 43-101 regulations and their estimation was carried out using industry

      standard polygonal longitudinal section methodology. The drill hole data was evaluated in plan and section in three

      dimensional AutoCAD to determine continuity between holes. Vein structures in the RLM area have vertical extents

      from 4 to 8 times their strike length. Because of this, areas of influence used around drill hole pierce points on the

      longitudinal section for purposes of defining measured and indicated resources are ellipses, elongate down dip. For

      measured resources an ellipse with short axis of 50 feet and long axis of 100 feet was used; and for indicated resources

      an ellipse with short axis 75 feet and long axis 150 feet was used.

      The Company’s production department uses Amine software for reserve estimation and mine planning. Amine is a 3D

      AutoCAD based system that uses block modelling to determine reserve and resource estimates. The Author has crosschecked

      the Amine methodology versus his polygonal longitudinal section methodology and has found no material

      differences between the results of the two methodologies. Amine uses 3D modelling to determine volumetric

      information for resources and beyond that step, the same tonnage factors are used to determine the tonnages. For

      reserve estimation, the Author used the minimum mining width, recovery, and metal price criteria that are currently

      used by the Production department. Cut-off grades were based upon current mining costs as presented in the economic

      assessment of the Project.

      The key assumptions used by the Author for conversion of measured and indicated resources to proven and probable

      reserves are:

      1) Resource tonnage factor 11.4 cubic feet per ton (equivalent to an average specific gravity of 2.8)

      2) Minimum mining width 5 feet horizontal.

      3) Mill Call Factor 95%

      4) Mill Gold Recovery 93%

      5) Gold price US$1200, Canadian$1260 at 1.05 exchange rate.

      6) External cut-off grade 0.13 ounces per ton (based upon total operating costs of $165/ton and taking

      into account mill gold recovery and the assumed price of gold).

      7) Internal cut-off grade 0.10 ounces per ton (based upon total mining costs (ore delivered to mill) of

      $123/ton and taking into account mill gold recovery and the assumed price of gold)..